ML18059A357

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1993 for Palisades Nuclear Plant.W/930903 Ltr
ML18059A357
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/31/1993
From: Handlovits S, Kluskowski P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9309100140
Download: ML18059A357 (4)


Text

consumers Power POWERINli MICHlliAN'S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 September 3, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of August, 1993.

If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113.

Sincerely, PJ Kl uskowski Reactor Engineer CC: DPHoffman, P26-l 17B JMartin, USNRC JLKuemin, Palisades Resident Inspector, Palisades _

DRHahn, Div of Rad Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades*

MPKnopp, Palisades SMMclntyre, Pl3-121 Region III Administrator, USNRC

_______ Document Control, 950*22*35*10/L SMH93*18 - ------

( 9309100140' 930831 i".

'I . ._PDR ADOCK 05000255 *

10111.G A CMS" ENERGY COMPANY

OPERATING DATA REPORT DOCKET NCl 50-255 DATE 08-31-93 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 OPERATING STATUS:

NOTES:

1. UNIT NAME Palisades
2. REPORTING PERIOD: 930801-930831
3. LICENSED THERMAL POWER (MWt) 2530.0
4. NAMEPLATE RATING (GROSS MWe) 811. 7
5. DESIGN ELECTRICAL RATING (NET MWe) 805.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) **770
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730
8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH ?AND 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
10. REASONS FOR RESTRICTIONS, IF ANY:

This Month Yr-to-Date Cumulative

11. HOURS IN REPORTING PERIOD 744.0 5831.0 190238.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 3302.6 107035.2
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE 0.0 3293.0 102499.6
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 8247903.0 220543875.0
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0.0 2699400.0 69589583.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 0.0 2569273.0 65606353.0
19. UNIT SERVICE FACTOR 0.0% 56.5% 53.9%
20. UNIT AVAILABILITY FACTOR 0.0% 56.5% 53.9%
21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0% 60.4% 51.4%*
22. UNIT CAPACITY FACTOR (USING DER NET) 0.0% 54.7% 42.8%
23. UNIT FORCED OUTAGE RATE 0.0% 11.4% 29.9%
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

Refueling outage is currently in progress.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: September 18, 1993
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
  • ------**------ Forecast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prjor to October 1985)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 09/03/93 COMPLETED BY SMHandlovits MONTH AUGUST 1993 TELEP,~.QNLJ.616 l 764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net)

1. 0 17. 0
2. 0 18. 0
3. 0 19. 0
4. 0 20. 0
5. 0 21. 0
6. 0 22. 0
7. 0 23. 0
8. 0 24. 0
9. 0 25. 0 ..........

'(" ~ -:.***""** .........:

10. 0 26. 0
11. 0 27. 0
12. 0 28. 0
13. 0 29. 0
14. 0 30. 0
15. 0 31. 0
16. 0 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.

  • " *'1

SUMMARY

OF OPERATING EXPERIENCE FOR AUGUST 1993 The unit was shutdown for the entire month.


-- ---- -*------ **--