ML18058B314

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1992 for Palisades Nuclear Plant.W/930105 Ltr
ML18058B314
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/31/1992
From: Handlovits S, Kluskowski P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9301110328
Download: ML18058B314 (4)


Text

consumers Power POWERiNii MICHlliAN'S PRDliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 January 5, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of December, 1992.

If you have any questions or concerns, please feel free to contact me at (616} 764-8913, extension Oli3 .

  • ,. ';
  • 1* I Sincerely';~  ;..-.. :_:*- .. =

/l/)'* :*.:. *. :

17~

PJ Kl uskowski Reactor Engineer CC: DPHoffman, P26-117B ABDavis, USNRC JLKuemin, Paltsades Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades SMMclntyre, Pl3-121 *

- Administrator, USNRC


*--------** *_~oq.Jm~nU_C>.!lJ:!'tl, 950*22*35*1Q,{_L SMH93*01

'I

/ 93011.1-.0320* ,92123i '.

PDR fADOCK; 05000255 I i R *~ PPR A CMS ENERGY COMPANY

' . J) ,, .

  • OPERATING OATA REPORT OOCKET NO 50-255 DATE 12-31-92 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 OPERATING STATUS:

NOTES:

1. UNITNAME Pa 1i sades
2. REPORTING PERIOD: 921201-921231
3. LICENSED THERMAL POWER (MWt) 2530.0
4. NAMEPLATE RATING (GROSS MWe) 811. 7
5. DESIGN ELECTRICAL RATING (NET MWe) 805.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) **770
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730
8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 AND 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO* WHICH RESTRICTED, IF ANY (NET MWe):
10. REASONS FOR RESTRICTIONS, IF ANY:

This Month Yr-to-Date Cumulative

11. HOURS IN REPORTING PERIOD 744. 0 8784.0 184407.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 6686.0 103732.6
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE 744.0 6295 .1 99206.6
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED (MWH) 1880496.0 15649231 . 0 212303844.0
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 618730.0 5111458.0 66890183.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 589276.0 4B65072.0 63037080.0
19. UNIT SERVICE FACTOR 100. 0% 71. 7% 53.8%
20. UNIT AVAILABILITY FACTOR 100.0% 71.7% 53.8%
21. UNIT CAPACITY FACTOR (USING MDC NET) 108.5% 75.9% 51.1%*
22. UNIT CAPACITY FACTOR (USING DER NET) 98.4% 68.8% 42.5%
23. UNIT FORCED OUTAGE RATE 0.0% 11. 0% 30.4%
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prior.to October 1985)
  • AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 01/05/93 COMPLETED BY SMHandlovits MONTH DECEMBER 1992 TELEPHONE (616)764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net)
1. 793 17 .. 793
2. 791 18. 792
3. 787 19. 795
4. 797 20. 792
5. 792 21. 790
6. 792 22. 797
7. 793 23. 788
8. 792 24. 794
9. 793 25. 794
10. 791 26. 792
11. 786 27. 792
12. 794 28. 792
13. 793 29. 791
14. 796 30. 790
15. 791 31. 792
16. 789 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.

SUMMARY

OF OPERATING EXPERIENCE FOR DECEMBER 1992 The unit operated at full power for the entire month of December.