Responds to NRC 790426 Ltr Re Violations Noted in IE Insp Rept 50-410/79-02.Corrective Actions:Welds Will Undergo Ultrasonic,Radiographic,Liquid Penetrant or Magnetic Testing
ML18041A001
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/01/1979
From: Rhode G
NIAGARA MOHAWK POWER CORP.
To: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17053A860 List:
References
NUDOCS 7907300372
Download: ML18041A001 (4)


Text

'

~ ov 'Q T NIAGARA U MOHAWK NIAGARA MOHAWK POWER CORPORATION/300 ERIE BOULEVARD WEST, SYRACUSE, N.Y. 13202/TELEPHONE (315) 474-1611 June 1, 1979 Office of Inspection & Enforcement Region I Attn: Mr. R. T. Carlson, Chief Reactor Construction & Engineering Support Branch U.. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406

Dear Mr. Garison:

RE: Inspection Report No. 79-02 Docket No. 50-410 On March 20-23, 1979, an inspection was conducted by Mr. L. Narrow of your office at Nine Mile Point Nuclear Station Unit 2. Your letter dated April 26, 1979 detailed an alleged item of non-compliance resulting from this inspection., This alleged non-compliance item is as follows.

"Stone &, Webster Specification No. NMP2-P283B, Revision 3 dated November 15, 1978, for Shop. Fabrication and Field Erection of Primary Containment Steel Plate Liner states that the penetrations is ASME Section Summer 1973 addenda.

III, including the ASME Section III, Summer 1973 addenda Article NB-5000, Paragraph NB-5231 states, in part: "All welded joints...

shall be radiographed."

~

~

Contrary to the above, as of March 21, 1979, Stone & Webster Specification No. NMP2-P283B allowed ultrasonic examination of flued head to outer sleeve welds of piping penetrations and does not require radiographic examination of these welds."

SDQQ 7 %2

June 1, 1979 Page 2

~Res onse ASME Section III, Paragraph NB-5231 referenced above applies to attachment welds'hich are pressure retaining for piping 'systems under Paragraph NB construction. The welds in question between the flued head forging and penetration sleeve do not form an integral part of the piping pressure retaining boundary. These welds are Class 1 struc-tural attachment welds. In accordance with Paragraph NB-5260, these welds require only magnetic particle or'liquid penetrant examimation.

This testing was completed and documented. Since these welds also provide a containment pressure boundary function, ultrasonic inspection was specified and, performed. Radiography is, not required.

Corrective Action To Be Taken The ultrasonic examination of'hese.welds were the subject of a Unit 2'0CFR50.55(e) notification on May 25, 1979. As a result of that matter, the welds will be re-examined. A radiographic examination will be per-formed where meaningful- results will be received. Where the joint detail does not permit radiographic examination, ultrasonic, and liquid penetrant or magnetic particle examination will be substituted.

Date When Full. Com liance Was Achieved Full compliance has been maintained. Also, the re-examination is expected to be completed: by September 1, 1979.

Very truly yours, NIAGARA MOHAWK POWER CO TION

.,'". Y yv-iC Gerald K. Rhode Vice President System Pr ]scot +nsgement