Forwards Revised App R Deviation Request 13, Essential Redundant Raceway Protection. Util Plans to Wrap Raceway Per Deviation During Unit 1 Third Refueling & Insp Outage
ML18040B186
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/01/1987
From: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
To: Butler W
Office of Nuclear Reactor Regulation
References
PLA-2906, NUDOCS 8709040043
Download: ML18040B186 (41)


Text

' R JL RY INFORMATION DISTR~TI~ SYSTEM <RIDS)

ACCESSION NBR 8709040043 DQC. DATE: 87/09/Oi NOTARIZED: NO DOCKET FAC IL: 50-387 Susquehanna Steam Electric Stations Unit ii Pennsglva 05000387 50-388 Susquehanna Steam Electric Stations Unit 2i Pennsglva 05000388 AUTH. NAME AUTHOR AFFILIATION KEISERa H. W. Pennsylvania Poeer 5 Light Co.

RECIP. NAME RECIPIENT AFFILIATION BUTLER'S W. R. ProJect Directorate I 2

SUBJECT:

Forwards revised App R Deviation Request 13'Essential Redundant Racemate Protection. " Util plans to crap raceway per deviation during Unit i third refueling Zc insp outage.

DISTRIBUTION CODE: A006D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: OR/Licensing Submittal: Fire Protection NOTES: icy NMSS/FCAF/PM. LPDR 2cgs Transcripts. 05000387 icy NMSS/FCAF/PM. LPDR 2cgs Transcripts. 05000388 RECIPIENT COPIES RECIPIENT COP I ES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PDi-2 LA 0 PDi-2 PD 5 5 THADANIiM i INTERNAL: ACRS 3 3 ARM/DAF/LFMB i 0 NRR WERMEIL> J i 0 NRR/DEST/ADS i NR PSB i i OQC/HDS2 i 0 FILE Oi i EXTERNAL: LPDR NRC PDR i i NSIC NOTES:

TOTAL NUMBER OF COPIES REQUIRED: LTTR 23 ENCL i9

0 ~

Pennsylvania Power & Light Company Iy Two North Ninth Street ~ Allentown, PA 18101 ~ 215/7705151 SEP - l 398T Harold W. Keiser Vice President-Nuclear Operations 21 5/770-7502 Director of Nuclear Reactor Regulation Attn.: Dr. Walter R. Butler Project Directorate I-2 Division of Reactor Projects U.S. Nuclear Regulatory Commission Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION APPENDIX R DEVIATION REQUEST 1!13 REVISION PLA-2906 FILES R41-2, A17-15

Dear Dr. Butler:

Attached is a revision to our Deviation Request I(13, "Essential Redundant Raceway Protection".. PP&L plans to wrap raceway per this deviation request during the Unit 1 Third Refueling and Inspection Outage.

Very truly yours, H. W. Keiser Vice President-Nuclear Operations Attachment cc: NRC Document Control Desk (original)

NRC Region I Mr. L. R. Plisco NRC Resident Inspector Mr. M. C. Thadani NRC Project Manager III

<<) 1 8709040043 87090i PDR ADQC< 05000387 F PDR

DE,VIATION REQUEST NO. 13 REVISED AUGUST 1987 PAGE 1 OF 3 APPENDIX R DEVIATION RE VEST ESSENTIAL REDUNDANT RACEWAY PROTECTION DEVIATION REQUEST:

We request approval of the following:

a) Protection of redundant safe shutdown cables in a fire zone may be accomplished through the use of one or a combination of methods identified in 10CFR50, Appendix R, Section III.G.2a, b, and c.

b) The safe shutdown cables, required to ensure availability of a safe shutdown'ath in a particular fire zone need only be protected within that fire zone. The criteria that a fire is assumed to propagate into adjacent fire zones both horizontally and upward must be satisfied (see Deviation Request b'7).

c) All raceways are protected by the use of a 1-hour fire rated barrier where automatic suppression/detection exists or by the use of .a 3-hour fire rated barrier where automatic suppression/detection does not exist (See attached drawing B-213424).

FIRE AREAS AFFECTED:

This deviation request applies to all Fire Areas in the Unit 1 and Unit 2 Reactor Buildings.

REASON FOR DEVIATION RE UEST:

10 CFR 50 Appendix R Section III.G.2 requires that where cables or equipment of redundant trains of systems necessary to achieve and maintain hot shutdown conditions are located within the same fire area, one of 3 means (III.G.2.a,b,c) of ensuring that one of the redundant trains is free of fire damage shall be provided. When using the methods of Sections III.G.2.b or c for raceway protection, it is required that the fire detection and an automatic fire suppression system be installed in (throughout) the fire area. Although we have fire detection, where appropriate, throughout the fire areas, we do not have an automatic fire suppression system installed completely throughout the fire areas.

Based on the fire spread limitation criteria outlined in Deviation Request 87 and the wraparound area concept in Deviation Request P4, protection of the essential redundant train throughout an entire fire area is not warranted. In addition, certain fire zones have only partial automatic suppression coverage within the fire zone.

DEVIATION RE(UEST NO. 13 REVISED AUGUST 1987 PAGE 2 OF 3 EXISTING CONDITIONS:

The 3-hour fire barrier method (III.G.2.a) and the 1-hour fire barrier with automatic fire suppression/detection method ( III.G.2.c) are used to protect essential redundant raceways at Susquehanna SES. The choice of methods depends on the availability of automatic fire suppression/detection.

The wraparound areas at Susquehanna SES contain both divisions of redundant safe shutdown raceways and both divisions of these raceways are protected within the wraparound areas (see Deviation Request 84). The wraparound area provides a spatial separation between fire areas and the protection of both redundant safe shutdown raceway divisions within the wraparound area assures the availability of a safe shutdown path based on the limitation of fire spread across the wraparound area.

The fire spread limitation criteria (see Deviation Request 0'7) states that a fire will only propagate to the next adjacent fire zone; Therefore, different safe shutdown paths could be protected in fire zones remote from each other.

JUSTIFICATION:

The purpose of Appendix R,Section III.G.2, is to assure that one train of safe shutdown raceway and its associated circuits are free of fire damage so that they remain available for safe shutdown of the plant. The method of protection for these essential redundant raceways outlined in this deviation request is different than that required by Appendix R,Section III.G.2, but accomplishes the same purpose and intent of Section III.G.2.

Due to the large configurations of some of the Reactor Building fire areas and the fire spread limitation criteria presented in Deviation Request b'7, the installation of an automatic suppression system throughout the fire areas would .

not significantly enhance the safety of the plant. Moreover, where an automatic suppression system does not exist, essential redundant raceway are protected by a 3-hour fire rated barrier.

In fire zones where automatic suppression is not complete throughout the entire fire zone, both one-hour and three-hour raceway protection (wrapping) is used.

There are five fire zones at Susquehanna which have partial automatic suppression coverage within the fire zone. These five zones are listed below along with the conservatively developed maximum combustible loading as determined from the

'Combustible Loading Analysis.

Maximum Combustible Fire Zone Loadin 1-3A 60.7 minutes 1-3B-N 40.4 minutes 1-4A-N 22.9 minutes 2-3B-N 55.5 minutes 2-4A-S 25.9 minutes

DEVIATION REQUEST NO. 13 REVISED AUGUST 1987, PAGE 3 OF 3 In all cases (with the exception of an approximate 1'A exceedance in Fire Zone 1-3A) the conservative maximum combustible loading for each of these fire zones is less than 60 minutes. This is the tested acceptance level for the 1-hour wrapping used at Susquehanna. Additionally, wherever the 1-hour wrapping is being used, automatic suppression protection exists to mitigate the heat effect that a postulated fire would have on the wrapped raceway. Inspection of the boundary areas for each of these partially protected fire zones reveals that there are no significant fire hazards on either side of this boundary for a minimum distance of approximately 20 ft. (See attached drawing 8-213424). Therefore, we are assured that adequate protection exists for the given combustible configuration in each of these boundary areas. Our program for long term Appendix R compliance will assure that no significant fire hazards will be introduced into these areas in the future.

Based on the criteria and justifications presented in this deviation request and in Deviation Requests ¹4 and ¹7, we are assured that one of the redundant trains of a required safe shutdown system is free from fire damage.

fxm/h107i: nas

ga-'o '2o'" LBQEWD Sip~,ir-i'dP V l @o.'. 5>QTQTF KA4~

'OO Fiat. HWV.<goS Wig;K: H'A,:5'A,CPS i Ha. VJR,AP AVE mAt i a Su F PRFSStud 5 H R. 8 Is! AP Aovo~AT >c. G>EMBCTioA AoT'awhV'>c 06'~~~.iO l-A5L.Q ggAg Co oUlT a

cA',EL'. TRA,( F IR E 5 ToP {T !P)

(Tel SIPE. Ti2A'()

0 I55UE Fo R OSE REV DESCRIPTION NOH-QUALITY RELATED Hot% wRAP 5 Hoi)R, W)g,AP SUSQUEHRNNR S.E.S.

UNI Tel ~2

~

Im

'APZRmmg APP. R-DEVIATION REGI. I3

'F'1 A',A V.'fP Lnl CARO ESSENTIAL REDUNDANT RACEWAY P ROT ECTION ESSE<71 AL- RE.CUWGAQT ZActVVAy pgOTt=CTiaa A18o AvaIlable Oa Aperture Card AREA ELEV. SCALE PENNSYLVANIA POWER L LIGHT COMPANY ALLENTOMN PA.

F 1R E P o 4 B K 17 H F'4 C T'i Ag SHEET HO+ REY. HO ~

5 PRixJKLgR PR.TE~in~. B2 34.24 I

g709'dWIS95 O/ AE ORAHINQ NO.

C- 836 I

FRACTIONAl. FC MAI I tX'AT ION COUR

ry

~

CrO l

n ~,

Q.-'-

l

0 ~ August 20I 1987 Docket Nos. 50-387/388 Mr. Harold M. Keiser Vice President Nuclear Operations Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101

Dear Mr. Keiser:

SUBJECT:

NRC SAFETY ISSUES MANAGEMENT SYSTEM RE: SUS(UEHANNA'TEAM ELECTRIC STATION, UNITS 1 AND 2 By letter dated May 28, 1986, you provided information for the NRC's Generic Issues Management Tracking Systems. This information and information on plant specific safety issues has been incorporated into the NRC's Safety Issues Management System (SINS). This system will be used by the NRC to track the review, implementation, and verification of safety related issues.

The Susquehanna 1 and 2 plant data for SIMS is presented in the enclosures. Me request that you review the enclosures and inform us of (1) significant issues that should be added (2) non-applicable issues that should be deleted, (3) either the date (month/year) each issue was completed/implemented or the projected date (month/year) the issue will be completed/implemented.

If you cannot respond to this request by September 15, 1987, let us know the date you will respond.

Sincerely,

/s/

Mohan Thadani, Project Manager Project Directorate I-2 Division of Reactor Projects I/II cc: w/enclosures:

See next page DISTRIBUTION NRCPDR/LPDR PDI-2 Reading SVarga/BBoger MO'Brien'Thadani/DFischer OGC - Bethesda EJordan JPar tlow ACRS )

PDI-2: D hadani:ca MButler g ga:87 g :>0:87

  • \

~ ~

J L

~ ~

(4~8 REOy P

~ o UNITED STATES Op nO NUCLEAR REGULATORY COMMISSION I

A 0

'tt WASHINGTON, D. C. 20555

+a*++

~O August 20'987 Docket Nos. 50-387/388 Mr. Harold W. Keiser Vice President Nuclear Operations Pennsylvania Power and Light Company 2 North Ninth Street Al 1 entown, Pennsyl vani a 18101

Dear Mr. Keiser:

SUBJECT:

NRC SAFETY ISSUES MANAGEMENT SYSTEM RE: SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 By letter dated May 28, 1986, you provided information for the NRC's Generic Issues Management Tracking Systems. This information and information on plant specific safety issues has been incorporated into the NRC's Safety Issues Management System (SIMS). This system will be used by the NRC to track the review, implementation, and verification of safety related issues.

The Susquehanna 1 and 2 plant data for SIMS is presented in the enclosures. We request that you review the enclosures and inform us of'1) significant issues that should be added (2) non-applicable issues that should be deleted, (3) either the date (month/year) each issue was completed/implemented or the projected date (month/year) the issue will be completed/implemented.

If you cannot respond to this request by September 15, 1987, let us know the date you will respond.

Sincerely, Mohan Thadani, Project Manager Project Directorate I-2 Division of Reactor Projects I/II cc: w/enclosures:

See next page

0

~ ~

Mr. Harold W. Keiser Susquehanna Steam Electric Station Pennsylvania Power & Light Company Units 1 &-2 CC:

Jay Silberg, Esq. Mr. W. H. Hirst, Manager Shaw, Pittman, Potts & Trowbridge Joint Generation 2300 N Street N.W. Projects Department Washington, D.C. 20037 Atlantic Electric P.O. Box 1500 Bryan A. Snapp, Esq. 1199 Black Ho~se Pike Assistant Corporate Counsel Pleasantville, New Jersey 08232 Pennsylvania Power & Light Company 2 North Ninth Street Regional Administrator, Region I Al 1 entown, Pennsyl vani a 18101 U.S. Nuclear Regulatory Coomission 631 Park Avenue Mr. E. A. Heckman King of Prussia, Pennsylvania 19406 Licensing Group Supervisor Pennsylvania Power & Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. Loren Plisco Resident Inspector P.O. Box 52 Shickshinny, Pennsylvania 18655 Mr. R. J. Benich Services Project Manager General Electric Company 1000 First Avenue King of Prussia, Pennsylvania 19406 Mr. Thomas M. Gerusky, Director Bureau of Radiation Protection Resources Commonwealth of Pennsylvania P. 0. Box 2063 Harrisburg, Pennsyl vania 17120 Robert W. Alder, Esquire Office of Attorney General P.O. Box 2357 Harrisburg, Pennsylvania 17120 Mr. Jesse C. Tilton, III Allegheny Elec. Coorperative, Inc.

212 Locust Street P.O. Box 1266 Harri sburg, Pennsyl vani a 17108-1266

PAGE 13}6 R-1216320-SPC 08/17/8?

SAFETY ISSUES MAN'AGEMENT SYSTEM PLANT DATA PLANT DOCKET TYPE NSSS SUPPLIER THERMAL CAPACITY LICENSEE OL STATE REGION ISSUE EXP 0~

IRA~i SUSQUEHANNA 1 05000387 BWR GE 3293 MWT PENNSYLVANIA POWER & LIGHT PA 1 07/82C 07/22 IMPO. IMPO. IMPL. VERIFY ISSUE MPA VER DOCKET VER APPLICABLE ISSUES INIT. COMP. COMP. COMPLET PRIORITY PRIORITY PRIORITY IF'RIORI~

M65353 SUSQUEHANNA 1 - INADEQUATE TORQUE ON HPC 05/87C 05/87C 50 REACTOR VESSEL LEVEL INSTRUMENTATION IN, N/A N/A N/A N/A 67.3.3 A-17 IMPROVED ACCIDENT MONITORING 04/83C 02/85C 00/87 75 (B-?6) B-76 ITEM 1. 1 - POST TRIP REVIEW; PROGRAM DES 11/83C 05/85C 00/83C 75 (B"77) B-77 ITEM 2.1 - EQUIPMENT CLASSIFICATION & VE 11/83C 03/84C 75 (B-78) B-78 ITEMS 3.1.1 & 3.1.2 -POST MAINTENANCE TE 11/83C 06/86C 00/83C 75 B-79) B-79 ITEM 3.1.3 - POST MAINTENANCE TESTING 11/83C 11/85C 00/83C 75 >B-85), B-85 SALEM ATWS 1.2 DATA CAPABILITY 11/84C 06/85C 03/84C

?5 iB"86) B-86 SALEM ATWS 2.2 S-R COMPONENTS 11/84C 03/84C 75 (8-87). B-87 SALEM ATWS 3.2. 1 & 3.2.2 S-R COMPONENTS 11/84C 06/86C 00/83C 75 (B-88) B-88 SALEM ATWS 3.2.3 T.S. S"R COMPONENTS 11/84C 11/85C 00/83C 75 (B-92)'5 B-92 SALEM ATWS 4.5.1 DIVERSE TRIP FEATURES 11/84C 06/86C 03/84C B-93 SALEM ATWS 4.5.2 & 4.5.3 TEST ALTERNATIV 11/84C 04/85C

'-10 (B-93)..'-36 (C-10) CONTROL OF HEAVY LOADS OVER SPENT FUEL P 04/83C 07/83C 00/82C A-36 (C-15) C-15 CONTROL OF HEAVY LOADS - PHASE II (FOLLO 05/83C 01/86C 00/82C B-56 D-19 DIESEL GENERATOR RELIABILITY 09/84C 09/85C 09/84C HF 1.1 SHIF T STAFF ING 10/83 01/84C 10/85C I.A.1.1.1 SHIFT TECHNICAL ADVISOR - ON DUTY C C 05/82C I.A.1.1.4 SHIFT TECHNICAL ADVISOR - DESCRIBE LONG C 05/82C C 05/82C

t PAGE 1&7 R"1216320"SPC 08/17/87 SAFETY ISSUES MANAGEMENT SYSTEM PLANT DATA PLANT DOCKET TYPE NSSS SUPPLIER THERMAL CAPACITY LICENSEE OL STATE REGION ISSUE EXPIRA~

0~

SUSQUEHANNA 1 05000387 BWR GE 3293 NWT PENNSYLVANIA +~& LIGHT PA 1 07/82C 07/22 VERIFY'RIORI~

INPO. IMPO. IMPL. VERIFY ISSUE MPA VER DOCKET APPLICABLE ISSUES INIT. COMP. COMP. COMPLET PRIORITY PRIORITY PRIORITY I.A.1.2 SHIFT SUPERVISOR RESPONSIBILITIES 08/82C I.A. 1.3. 1 F-02 SHIFT MANNING - LIMIT OVERTIME 08/82C I.A.1.3.2 F-02 SHIFT MANNING - MIN SHIFT CREW C 08/82C I.A.1.4 LONG-TERM UPGRADE OF OPERATIONS PERSONNE 04/83 04/83 I.A.2.1.1 IMMEDIATE UPGRADING OF RO & SRO TRAINING N/A I.A.2.1.4 F-03 IMMEDIATE UPGRADING OF RO & SRO TRAINING 05/82C I.A.2.3 ADMINISTRATION OF TRAINING PROGRAMS 05/82C I.A.2.7 ACCREDITATION OF TRAINING INSTITUTIONS 03/85 12/86 03/85 03/87 M I.A.3.1.3.A REVISE SCOPE & CRIT. FOR LIC. EXANS - SI N/A I.A.3.1.3.B REVISE SCOPE & CRIT. FOR LIC. EXAMS --. SI N/A I.B.1.2 EVALUATION OF ORGANIZATION & MANAGEMENT 08/82C I.C,l.l SHORT-TERM ACCIDENT & PROCEDURES REVIEW 08/82C I.C.1.2.B F-05 SHORT-TERM ACCID. & PROCEDURES REV. - IN 07/84C 09/85C I.C.1.3.B F-05 SHORT-TERM ACCID. & PROCEDURES REV. - TR 07/84C 09/85C I.C.2 SHIFT & RELIEF TURNOVER PROCEDURES C 08/82C I.C.3 SHIFT-SUPERVISOR RESPONSIBILITY 08/82C I.C.4 CONTROL-ROOM ACCESS 05/82C I.C.S F-06 FEEDBACK OF OPERATING EXPERIENCE 09/82C I.C.6 F-07 VERIFY CORRECT PERFORMANCE OF OPERATING 09/82C

PAGE 13'1 8 R-1216320-SPC 08/17/87 SAFETY ISSUES MANAGEMENT SYSTEM PLANT DATA PLANT DOCKET TYPE NSSS SUPPLIER THERMAL CAPACITY LICENSEE OL STATE REGION ISSUE EXPIRA~i O~

SUSQUEHANNA 1 05000387 BWR GE 3293 MWT PENNSYLVANIA POWER & LIGHT PA 1 07/82C VERIFY'RIORITY 07/22 IMPO. IMPO. IMPL. VERIFY ISSUE MPA VER DOCKET APPLICABLE ISSUES INIT. COMP. COMP. COMPLET PRIORITY PRIORITY PRIORI~

I.C.7.1 NSSS VENDOR REV. OF PROC - LOW POWER TES C C C 09/82C I.C.7.2 NSSS VENDOR REV. OF PROC - POWER ASCENSI C 09/82C I.C.8 PILOT MON OF SELECTED EMERGENCY PROC FOR C 08/82C I.D.2.1 F-09 PLANT-SAFETY PARAMETER DISPLAY CONSOLE 04/83C 07/84C N/A I.D.2.2 F-09 PLANT-SAFETY PARAMETER DISPLAY CONSOLE 04/83C . 07/84C 12/84C I.D.2.3 F-09 PLANT-SAFETY PARAMETER DISPLAY CONSOLE 04/83C 07/84C 12/84C I.G.1.3 TRAINING DURING LOW-POWER TESTING - TRAI C C C 09/82C II.B.1.2 F-10 REACTOR-COOLANT SYSTEM VENTS - INSTALL V 05/82C II.B.1.3 F-10 REACTOR-COOLANT SYSTEM VENTS - PROCEDURE . 05/82C II.B.2.2 PLANT SHIELDING - CORRECTIVE ACTIONS TO N/A II.B.2.3 F-11 PLANT SHIELDING - PLANT MODIFICATIONS (L 09/82C II.B.3.2 POSTACCIDENT SAMPLING " CORRECTIVE ACTIO N/A II.B.3.3 POSTACCIDENT SAMPLING - PROCEDURES II.B.3.4 F-12 POSTACCIDENT SAMPLING - PLANT MODIFICATI

'I.B.4.2.B F-13 TRAINING FOR MITIGATING CORE DAMAGE - CO C 06/82C II.D.1. 1 RELIEF & SAFETY VALVE TEST REQUIREMENTS 03/84C 05/86C 01/86C N/A II.D.1.2.A RELIEF & SAFETY VALVE TEST REQUIREMENTS 03/84C 05/86C 01/86C N/A II.D.1.2.B F-14 RELIEF & SAFETY VALVE TEST REQUIREMENTS 03/84C 05/86C 01/86C 08/82C, II.D.1.3 RELIEF & SAFETY VALVE TEST REQUIREMENTS 03/84C 05/86C 01/86C 05/82C

I PAGE 1319 R-1216320-SPC 08/17/87 SAFETY ISSUES MANAGEMENT SYSTEM PLANT DATA NSSS THERMAL OL CIRCE PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXP IRA~N SUSQUEHANNA 1 05000387 BWR GE 3293 MWT PENNSYLVANIA -POWER;8 LIGHT PA 1 07/82C 07/22 IMPO. IMPO. IMPL VERIFY ISSUE MPA VER DOCKET VER IF APPLICABLE ISSUES INIT. COMP. COMP COMPLET PRIORITY PRIORITY PRIORITY PRIOR II.D.3.1 VALVE POSITION INDICATION - INSTALL DIRE C 08/82C II.E.4.1.2 DEDICATED HYDROGEN PENETRATIONS - REVIEW 05/82C II.E.4. 1.3 F-18 DEDICATED HYDROGEN PENETRATION - INSTALL 05/82C II.E.4.2.1-4 CONTAIMENT ISOLATION DEPENDABILITY - IMP C 08/82C II.E.4.2.5.A CONTAINMENT ISOLAT. DEPENDABILITY - CNTM N/A II.E.4.2.5.B CONTAINMENT ISOLATION DEPENDABILITY - CN 08/82C II.E.4.2.6 F-19 CONTAINMENT ISOLATION DEPENDABILITY - CN 08/82C II.E.4.2.7 F"19 CONTAINMENT ISOLATION DEPENDABILITY - RA 08/82C II.F.1.1 F-20 ACCIDENT-MONITORING - PROCEDURES 04/84C II F

. . 1. 2.A F-20 ACCIDENT-MONITORING - NOBLE GAS MONITOR 06/84C II.F.1.2.B F"21 ACCIDENT.-MONITORING - IODINE/PARTICULATE II.F.1.2.C F"22 ACCIDENT-MONITORING - CONTAINMENT HIGH-R 06/84C II.F. 1.2.D F "23 ACCIDENT-MONITORING - CONTAINMENT PRESSU C 09/82C II.F.1.2.E F-24 ACCIDENT-MONITORING - CONTAINMENT WATER C 09/82C II.F .1.2.F F-25 ACCIDENT-MONITORING - CONTAINMENT HYDROG C 09/82C II.F.2.4 F-26 INSTRUMENTATION FOR DETECT. OF INADEQUAT 03/84C 02/85C 06/82C III.A.1. EMERGENCY PREPAREDNESS, SHORT TERM C'2/83C 05/82C FACILITIES - I 1-'II.A.1.2.

1 UPGRADE EMERGENCY SUPPORT III.A.1.2.3 UPGRADE EMER SUPPORT FACILITIES-MODS INC

~ ~

PAGE 1320 R-1216320-SPC 08/17/87 SAFETY ISSUES MANAGEMENT SYSTEM PLANT DATA NSSS THERMAL OL OW PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXPIRA~

SUSQUEHANNA 1 05000387 BWR GE 3293 MWT PENNSYLVANIA POWER & LIGHT PA 1 07/82C 07/22 IMPO. IMPO. IMPL. VERIFY ISSUE MPA VER DOCKET APPLICABLE ISSUES INIT. COMP. COMP. COMPLET PRIORITY PRIORITY PRIORI~

VERIFY'RIORITY III.A.2.2 F-68 UPGRADE PREPAREDNESS - METEROROLOGICAL D 07/85C 03/86C III.D.1.1.1 PRIMARY COOLANT OUTSIDE CONTAIMENT - LEA 09/82C III.D.3.3. 1 INPLANT RAD. MONIT. - PROVIDE MEANS TO D 09/82C III.D.3.3.2 F-69 INPLANT RADIATION MONIT. - MODIFICATIONS 09/82C III.D.3.4.1 F-70 CONTROL ROOM HABITABILITY- REVIEW 05/82C II.K.1.10 IE BULLETINS - OPERABILITY STATUS 08/82C II.K.1.22 IE BULLETINS - AUX. HEAT REM SYSTM, PROC 08/82C II.K.1.23 IE BULLETINS - RV LEVEL, PROCEDURES 08/82C II.K.1.5 IE BULLETINS - REVIEW ESF VALVES 08/82C II . K.3. 13. B F-43 FINAL RECOMMENDATIONS,B&0 TASK FORCE - H 08/82C II.K.3. 15 F-45 FINAL RECOMMENDATIONS,B&0 TASK FORCE - I 08/82C I I. K. 3. 16. B F-46 FINAL RECOM.,B&0 TASK FORCE - CHALLENGE 05/82C II.K. 3. 17 F-47 FINAL RECOMMENDATIONS,B&0 TASK FORCE - E N/A II.K.3.18.C F-48 FINAL RECOMMENDATIONS,B&0 TASK FORCE - A 06/85C II.K.3.21.B F-50 FINAL RECOMMENDATIONS, BE(0 TASK FORCE - R 05/82C

-II.K.3.22.A F-51 FINAL RECOMMENDATIONS,B&0 TASK FORCE - R 08/82C II.K.3.22.B F-51 FINAL RECOMMENDATIONS,B*0 TASK FORCE - R 08/82C II.K.3. 24 F-52 FINAL RECOMMENDATIONS,B&0 TASK FORCE - S 05/82C II.K.3.25.A FINAL RECOMMENDATIONS,B&0 TASK FORCE - P 07/84C

PAGE 1321 R-1216320-SPC 08/17/87 SAFETY ISSUES MANAGEMENT SYSTEM PLANT DATA PLANT DOCKET TYPE NSSS SUPPLIER THERMAL CAPACITY LICENSEE OL STATE REGION ISSUE EXPIRA~

0~

SUSQUEHANNA 1 05000387 BWR GE 3293 MWT PENNSYLVANIA -PGWEt>& LIGHT PA 1 07/82C 07/22 IMPO. IMPO. IMPL. VERIFY ISSUE MPA VER DOCKET APPLICABLE ISSUES INIT. COMP. COMP. COMPLET PRIORITY PRIORITY PRIORI~

VERIFY'RIORITY II.K.3.25.B F-53 FINAL RECOMMENDATIONS,B&0 TASK FORCE - P C 07/84C II.K.3.27- F-54 FINAL RECOMMENDATIONS,B&0 TASK FORCE - C C' C 08/82C II.K.3.28 F-55 FINAL RECOMMENDATIONS,B&0 TASK FORCE - Q C 06/82C II.K.3.30;B F-57 FINAL RECOMMENDATIONS,B&0 TASK FORCE - S C 06/82C .

II.K.3 30. C FINAL RECOMMENDATIONS,B&0 TASK FORCE - S C 09/82C II.K.3 31 F-58 FINAL RECOMMENDATIONS,B&0 TASK FORCE - C C 05/82C II.K.3 44 F-59 FINAL RECOM.,B&0 TASK FORCE - EVAL. TRAN C 05/82C II.K.3.45, F-60 FINAL RECOM.,B&0 TASK FORCE - MANUAL DEP C 05/82C M48743 SUSQUEHANNA 1 - PROPOSED AMENDMENT 1 TO 08/82C 06/84C M48878 SUSQUEHANNA 1 - CHANGE TO DIESEL GENERAT 09/82C 06/84C M49137 SUSQUEHANNA 1 - MOLDED CASE CIRCUIT BREA 10/82C 10/84C M49256 SUSQUEHANNA 1 - SAMPLE TEST OF PROTECTIV 12/82C 06/84C M49595 SUSQUEHANNA 1 - REVISION 6 TO EMERGENCY 01/83C 10/83C M49596 SUSQUEHANNA 1 - REVISION 31 TO FSAR 01/83C 06/85C M49597 SUSQUEHANNA 1 - REVISION 32 TO FSAR 01/83C 11/84C M49642 SUSQUEHANNA 1 - EXPAND POWER/FLOW MAP OP 02/83C 11/83C M49914 SUSQUEHANNA 1 FIRE DETECTION INSTRUMEN 03/83C 11/83C M51508 SUSQUEHANNA 1 REACTOR VESSEL MATERIAL 05/83C 05/87C M51716 SUSQUEHANNA 1 - SIMULATED LOSS OF OFFSIT 05/83C 05/84C

PAGE 1322 R-1216320-SPC 08/17/87 SAFETY ISSUES MANAGEMENT SYSTEM PLANT DATA NSSS THERMAL OL OM PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXPIRA~

SUSQUEHANNA 1 05000387 BWR GE 3293 MWT PENNSYLVANIA POWER

  • LIGHT PA 1 07/82C 07/22 IMPO. IMPO. IMPL. VERIFY ISSUE MPA VER DOCKET VERIFY'RIORI~

APPLICABLE ISSUES INIT. COMP . COMP. COMPLET PRIORITY PRIORITY PRIORITY M51958 SUSQUEHANNA 1 - LICENSE AMENDMENT TO INC 06/83C 05/84C M51980 SUSQUEHANNA 1 - PROPOSED TRANSCO PIPELIN 07/83C 04/84C M51982 SUSQUEHANNA 1 - INSERVICE INSPECTION PRO 06/83C 01/87C M51983 SUSQUEHANNA 1 - COMMON ELECTRICAL POWER 07/83C 05/84C M52048 SUSQUEHANNA 1 - MAIN STEAM LINE RADIATIO 07/83C 04/86C M52150 SUSQUEHANNA 1 - FIRE HOSE STATIONS 08/83C 12/83C M52151 SUSQUEHANNA 1 " MONTHLY GRAB SAMPLES 08/83C 12/83C M52495 SUSQUEHANNA 1 - SNUBBER INSERVICE VISUAL 10/83C 05/84C M52496 -SUSQUEHANNA 1 - PRIMARY CONTAINMENT ISOL 10/83C 11/83C M52585 SUSQUEHANNA 1 - ESW PUMP LOAD SEQUENCE T 10/83C 12/83C M52586 SUSQUEHANNA 1 ULTIMATE HEAT SINK T/S 4 10/83C 05/84C M52717 SUSQUEHANNA 1 PRIMARY CONTAINMENT ISOL 11/83C 05/84C M53232 SUSQUEHANNA- 1 - SRV INPLANT TEST 11/83C 03/84C M53323 SUSQUEHANNA-1 L/C 2.C.28 (B) TMI ITEM 12/83C 05/84C M53324 SUSQUEHANNA-1 REPORTING REQUIREMENTS L/ 12/83C 11/85C M53325 SUSQUEHANNA-1 STANDBY GAS TREATMENT SY 12/83C 03/84C M53564 SUSQUEHANNA 1 - REVISION 7 TO EMERGENCY 02/84C 06/84C M54 157 SUSQUEHANNA 1 - EMERGENCY PLANNING EXERC 01/84C 03/84C M54614 SUSQUEHANNA 1 - HIGH ENERGY LINE BREAKS . 09/83C 05/84C

~ 0 PAGE 13Z3 R-1216320-SPC 08/17/87 SAFETY ISSUES MANAGEMENT SYSTEM PLANT DATA PLANT NSSS 'HERMAL OL OW DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXPIRA N SUSQUEHANNA 1 05000387 BWR GE 3293 MWT PENNSYLVANIA -POWER;& LIGHT PA 1 07/82C 07/22 IMPO. IMPO. IMPL. VERIFY ISSUE MPA VER DOCKET VER IF YW APPLICABLE ISSUES INIT. COMP. COMP. COMPLET PRIORITY PRIORITY PRIORITY PRIORI~

M54633 SUSQUEHANNA 1 - EXEMPTION FROM STATE AND 01/84C 04/84C M54755 SUSQUEHANNA-1 - SPRAY POND OPERATING LIM 04/84C 11/84C M54949 SUSQUEHANNA 1 - PHYSICAL SECURITY PLAN 05/84C 04/85C M54967 SUSQUEHANNA-1 FEEDWATER BYPASS LEAKAGE 05/84C 12/84C M55021 SUSQUEHANNA 1 " THERMAL HYDRAULIC STABIL 05/84C 10/84C M55088 SUSQUEHANNA 1 - EXEMPTION TO GENERAL DES 05/84C 09/84C M55124 SUSQUEHANNA 1 - SPECIAL REPORTING REQUIR 05/84C 11/84C M55125 SUSQUEHANNA 1 - ADMIN CHANGES TO TECH SP 05/84C 11/84C M55 126 SUSQUEHANNA J. - DEFINITIONS - PROPOSED A 05/84C 04/85C M55127 SUSQUEHANNA 1 - SAFETY LIMITS AND LIMITI 05/84C 04/85C M55128 SUSQUEHANNA 1 - REACTIVITY CONTROL SYSTE 05/84C 04/85C M55129 SUSQUEHANNA 1 - INSTRUMENTATION - PROPOS 05/84C 04/85C M55130 SUSQUEHANNA 1 - REACTOR COOLANT SYSTEM- 05/84C 04/85C M55131 SUSQUEHANNA 1 - EMERGENCY CORE COOLING S 05/84C 04/85C M55132 SUSQUEHANNA 1 - CONTAINMENT SYSTEMS - PR 05/84C 04/85C M55 133 SUSQUEHANNA 1 - PLANT SYSTEMS - PROPOSED 05/84C 04/85C M55134 SUSQUEHANNA 1 - ELECTRICAL POWER SYSTEMS 05/84C 04/85C M55135 SUSQUEHANNA 1 - REFUELING OPERATIONS - P 05/84C 04/85C M55 136 SUSQUEHANNA 1 - SPECIAL TEST EXCEPTIONS 05/84C 04/85C

~ ~

PAGE 1324 R-1216320-SPC 08/17/87 SAFETY ISSUES MANAGEMENT SYSTEM PLANT DATA PLANT NSSS SUPPLIER THERMAL OL EXPIRA~

OM SUSQUEHANNA 1 DOCKET 05000387 TYPE BWR GE '293 CAPACITY MWT LICENSEE PENNSYLVANIA POWER 8 LIGHT STATE REGION ISSUE PA 1 07/82C 07/22 IMPO. IMPO. IMPL. VERIFY ISSUE MPA VER DOCKET VERIFY APPLICABLE ISSUES INIT. COMP. COMP. COMPLET PRIORITY PRIORITY PRIORITY PRIORI~

M55 137 SUSQUEHANNA 1 - RADIOACTIVE EFFLUENTS 05/84C 04/85C M55138 SUSQUEHANNA 1 - RADIOLOGICAL ENVIRONMENT 05/84C 04/85C M55 139 SUSQUEHANNA 1 - DESIGN FEATURES " PROPOS 05/84C 03/85C M55424 SUSQUEHANNA 1 - CHUGGING LOADS FOLLOWUP 07/84C 05/85C M55664 SUSQUEHANNA 1 - REVIEW SER INPUTS PER DL 09/84C 10/84C M55777 SUSQUEHANNA 1 - IN-VESSEL FUEL RACK 09/84C 02/85C M55779 SUSQUEHANNA 1 - EMERGENCY SERVICE WATER 09/84C 12/85C M55 801 SUSQUEHANNA 1 - CONTAINMENT PURGE VALVES 09/84C 04/85C M55803 SUSQUEHANNA 1 " MCPR OPERATIONAL LIMIT 09/84C 04/85C M55804 SUSQUEHANNA 1 - 300 START TEST FOR FIFTH 09/84C 11/84C M55823 SUSQUEHANNA 1 - REACTOR RECIRC PUMP OVER 09/84C 04/85C M55922 SUSQUEHANNA 1 - RELOCATION OF DRYWELL AT 09/84C 04/85C M55923 SUSQUEHANNA 1 - PERMANENT RADIATION MONI 09/84C 01/85C M56039 SUSQUEHANNA 1 - 480 VOLT SWING BUSSES 10/84C 07/85C M56058 SUSQUEHANNA 1 - HEPA FILTERS AND CHARCOA 09/84C 05/85C M56068 SUSQUEHANNA 1 - SDV.VENT AND DRAIN VALVE 10/84C 10/84C M56069 SUSFQUEHANNA 1 - BWR SCRAM SOLENOID VALV 10/84C 02/87C M56229 SUSQUEHANNA 1 - CLOSURE OF LICENSE CONDI 10/84C 04/85C M56230 SUSQUEHANNA 1 - REGULATORY GUIDE 1.97 RE 10/84C 04/85C

PAGE 1325 I

R-1216320-SPC 08/17/87 SAFETY ISSUES MANAGEMENT SYSTEM PLANT DATA NSSS THERMAL OL 0 PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXP IRA~

SUSQUEHANNA 1 05000387 BWR GE 3293 MWT PENNSYLVANIA +f%ER;Ec LIGHT PA 1 07/82C 07/22 IHPO. IMPO. IHPL. VERIFY ISSUE MPA VER DOCKET VER IF APPLICABLE ISSUES INIT. COMP. COMP. COMPLET PRIORITY PRIORITY PRIORITY PRIORI~

H56322 SUSQUEHANNA STEAM ELECTRIC STATION UNIT1 10/84C 04/85C M56362 SUSQUEHANNA UNIT 1 - MODIFICATIONS TO SU 11/84C 04/85C H56367 SUSQUEHANNA UNIT - SPDS CONFIRMATORY ITE 08/84C 08/84C M56399 SUSQUEHANNA 1 - L.C. 2.A/2.B.(2) 11/84C 12/85C M56430 SUSQUEHANNA 1 - CORE DAMAGE ESTIMATION 11/84C 10/85C H56531 SUSQUEHANNA UNIT 1 - 125 VOLT BATTERIES 12/84C 02/85C H56585 SUSQUEHANNA 1 - FW BYPASS LEAKAGE 12/84C 08/85C M56702 SUSQUEHANNA UNIT 1 - RELOAD PACKAGE: 01/85C 04/85C M56756 SUSQUEHANNA 1 - IST 12/84C M56760 SUSQUEHANNA 1 - INSTALLATION OF 5TH DIES 12/84C 12/85C M56824 SUSQUEHANNA 1 - EMERGENCY DIESEL GEN. RE 02/85C 04/85C M56830 SUSQUEHANNA 1 - ENVIRONMENTAL QUALIFICAT 01/85C 03/85C M56831 SUSQUEHANNA 1 - FIRE PROTECTION REPORT R 01/85C 06/85C M56889 SUSQUEHANNA 1 -L.C. 2.C.(28)(D)(I) INADE 02/85C 04/85C M56957 SUSQUEHANNA 1 PROP 65 ORGANIZATION STR 02/85C 05/85C M56958 SUSQUEHANNA 1 - PROPOSED AMEND 62 CONTAI 01/85C 05/85C M56959 SUSQUEHANNA 1 - PROPOSED 61 ADS MODS 01/85C 05/85C H56S61 SUSQUEHANNA 1 - PROPOSED 63 ADHINISTRATI 02/85C 05/85C M57045 SUSQUEHANNA 1 - TESTABLE SPECTACLE FLANG 10/84C 05/85C

PAGE 1326 R-1216320-SPC 08/17/87 SAFETY ISSUES MANAGEMENT SYSTEM PLANT DATA NSSS THERMAL OL OW PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXPIRAVP8H SUSQUEHANNA 1 05000387 - BWR GE 3293 MWT PENNSYLVANIA POWER

  • LIGHT PA 1 07/82C 07/22 IMPO. IMPO. IMPL. VERIFY ISSUE MPA VER DOCKET VERIFY APPLICABLE ISSUES INIT. COMP. COMP. COMPLET PRIORITY PRIORITY PRIORITY PRIOR IT M57 179 FIRE PROTECTION AUDIT W/REGION I SUPPORT 03/85C 09/85C M57327 SUSQUEHANNA 1 - FUEL LOADING CHAMBERS 04/85C 04/85C M57669 SUSQUEHANNA 1 - SINGLE LOOP OPERATION 04/85C 04/86C M57858 SUSFQUEHANNA 1 - CHUGGING LOADS 06/85C 06/86C M57859 SUSFQUEHANNA 1 - CHUGGING LOADS 06/85C 09/85C M57981 SUSQUEHANNA 1 CLOSURE OF L.C.2. (.126) 06/85C 03/86C M57982 SUSQUEHANNA 1 CLOSURE OF L.C. 2.C.(27) 06/85C 03/86C M57984 SUSQUEHANNA 1 CLOSURE OF L.C. 2.C.(32) 06/85C 02/87C M57986 SUSQUEHANNA 1 CLOSURE OF L.C. 2.C.(23) 06/85C 02/87C M57987 SUSQUEHANNA 1 CLOSURE OF L.C. 2.C. (16) 05/85C 03/86C M57988 SUSQUEHANNA 1 CLOSURE OF L.C. 2.C.(17) 05/85C 03/86C M57989 SUSQUEHANNA 1 CLOSURE OF L.C. 2.C.(24) 05/85C 03/86C M57990 SUSQUEHANNA 1 OBSURE OF L.C. 2.C.(31) 04/85C 03/86C M57991 SUSQUEHANNA 1 PROCEDURES GENERATION PA 05/85C 10/85C M57992 SUSQUEHANNA 1 PROCEDURES GENERATION PA 05/85C 10/85C M59392 SUSQUEHANNA 1 SPRAY POND VALVES 07/85C 11/85C M59393 SUSQUEHANNA 2 SPRAY POND VALVES 07/85C 11/85C M59475 SUSQUEHANNA 1 TECH. SPEC. INTERPRETATI 08/85C 12/85C M59595 SUSQUEHANNA 1 NITROGEN MAKE-UP SYSTEM 08/85C 10/85C

~ e ~'

PAGE 1327 R-1216320-SPC 08/17/87 SAFETY ISSUES MANAGEMENT SYSTEM PLANT DATA PLANT DOCKET TYPE NSSS SUPPLIER THERMAL CAPACITY LICENSEE OL STATE REGION ISSUE 0~

EXPIRA~

SUSQUEHANNA 1 05000387 BWR GE 3293 MWT PENNSYLVANIA WOW~A LIGHT PA 1 07/82C 07/22 IMPO. IMPO. IMPL. VERIFY ISSUE MPA VER DOCKET VERIF~

APPLICABLE ISSUES INIT. COMP. COMP. COMPLET PRIORITY PRIORITY PRIORITY PRIORI~

M59647 SUSQUEHANNA 1 - FIRE PROTECTION REPORT 09/85C M60098 SUSQUEHANNA 1 - DRYWELL COOLING FANS 10/85C 03/87C M60208 SUSQUEHANNA 1 - MCC (74/28) 11/85C 03/86C M60210 SUSQUEHANNA 1 - ZONE III RAD MONITORS 11/85C 02/86C M60322 SUSQUEHANNA 1 - TECH. SPEC. INTERPRETATI 12/85C 02/86C M60435 SUSQUEHANNA 1 " ADS MODS PROP (75/29) 12/85C M60437 SUSQUEHANNA 1 - PROPOSED (76/31) ADMIN C 12/85C 04/87C M60440 SUSQUEHANNA 1 - TMI ITEM I.C. 1.2A 01/86C 02/87C M60443 SUSQUEHANNA 1 - TMI ITEM I.C. 1.3A 01/86C 02/87C M60444 SUSQUEHANNA 1 - TMI ITEM III.D.l. 1 01/86C 02/87C M60626 SUSQUEHANNA 1 - CYCLES 3 RELOAD 01/86C 04/86C M60642 SUSQUEHANNA 1 - CODE "N" STAMPING 09/85C 05/86C M60923 SUSQUEHANNA 1 - FIFTH DIESEL 02/86C 06/87C M6 1097 SUSQUEHANNA 1 - (81/34) - DRYWELL COOLIN 03/86C 03/87C M61322 SUSQUEHANNA 1 - DG RELIABILITY TECH. SPE 04/86C 09/86C M61333 SUSQUEHANNA 1 - DIESEL RELIABILITY TECH. 04/86C 09/86C M61454 SUSQUEHANNA 1 - CHANNEL FUNCTIONAL TESTI 04/86C 02/87C M6 1563 SUSQUEHANNA 1 - SECONDARY CNTMT (84/37) 05/86C 08/86C M62012 SUSQUEHANNA 1 - SALP 07/86C 01/87C

~g PAGE 1328 R-1216320-SPC 08/17/87 SAF ETY ISSUES MANAGEMENT SYSTEM PLANT DATA NSSS THERMAL OL PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXPIRA ON SUSQUEHANNA 1 05000387 BWR GE 3293 MWT PENNSYLVANIA POWER & LIGHT PA 1 07/82C 07/~

IMPO. IMPO. IMPL. VERIFY ISSUE MPA VER DOCKET VERIF~

APPLICABLE ISSUES INIT. COMP. COMP. COMPLET PRIORITY PRIORITY PRIORITY PRIORITY M62960 SUSQUEHANNA 1 - JET IMPINGEMENT ON CONTA 09/86C M M63446 SUSQUEHANNA 1 - EXEMPTION FROM GDC-4 10/86C 10/86C M63448 SUSQUEHANNA 1 - DEGRADED VOLTAGE PROTECT 09/86C 07/87C M63450 SUSQUEHANNA 1 - PHYSICAL SECURITY PLAN C 10/86C 03/87C 03/87C M64390 SUSQUEHANNA 1 - EXTENSION OF MPLHGR LIMI 12/86C 05/87C M64391 SUSQUEHANNA 1 - CONTAINMENT ISOLATION & 12/86C M64694 SUSQUEHANNA 1 - ADMINISTRATIVE CHANGES 8 08/86C 09/87 M65020 SUSQUEHANNA 1 - PUMP TRIP BYPASS ON TURB 02/87C 07/87C M65022 -SUSQUEHANNA 1 - HISTORICAL PRESERVATION 03/87C M65024 SUSQUEHANNA 1 - POST ACCIDENT ALTERNATIV 02/87C M65026 SUSQUEHANNA 1 - ONE TIME RELIEF FROM LEA 02/87C M65157 SUSQUEHANNA 1 - SODIUM PENTABORATE CONC. 04/87C 09/87 M65159 SUSQUEHANNA.1 - FUNCTIONAL TESTING OF SN 04/87C 09/87 M65165 SUSQUEHANNA 1 - NEW ACTION STATEMENT FOR 04/87C M65167 SUSQUEHANNA 1 - SGTS HI-RAD INST. SURV. 04/87C M65169 SUSQUEHANNA 1 - SDV VENT/DRAIN VALVE SUR 04/87C 09/87 M65171 SUSQUEHANNA 1 - REVIEW OF REPORT FOR COR 04/87C 02/88 M65635 SUSQUEHANNA 1 " OVERCURRENT PROTECTIVE D 06/87C M65636 SUSQUEHANNA 1 - RELOAD 06/87C

I PAGE 1529 R-1216320-SPC 08/17/87 SAFETY ISSUES MANAGEMENT SYSTEM PLANT DATA NSSS THERMAL OL PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXPIRA ON SUSQUEHANNA 1 05000387 BWR GE 3293 MWT PENNSYLVANIA +OWER 8 LIGHT PA 1 07/82C 07/2 IMPO. IMPO. IMPL. VERIFY ISSUE MPA VER DOCKET VER IF APPLICABLE ISSUES INIT. COMP. COMP. COMPLET PRIORITY PRIORITY PRIORITY PRIORIT M65644 SUSQUEHANNA 1 - COMMON MODE FAILURE POTE 06/87C M65646 SUSQUEHANNA 1 " BATTERY LOAD PROFILE INC 06/87C MPA-A-18 A-18 TECH SPECS AFFECTED BY 50.72 AND 50.73 ( 09/84C 11/84C 11/84C MPA-A-20 A-20 10 CFR 50.62 OPERATING REACTOR REVIEWS 04/86C 09/87 00/87 MPA-F-08 F-08 I.D.1.1 DETAILED CONTROL ROOM DESIGN REV 04/83C 00/82C MPA-F -7 1 F-71 I.D.1.2 DETAILED CONTROL ROOM REVIEW tFO 10/84C 12/86C NMSS-2 ACCESS AUTHORIZATION 02/87 12/87 04/88 NMSS-3 MISC AMEND CONCERN PHYSICAL PROTECTION 0 07/86 10/86 /87 NMSS-4 SEARCHES OF INDIVIDUALS AT POWER REACTOR 07/86 10/86 /87 NMSS-5 REPORTING REQUIREMENTS FOR SAFEGUARDS EV /86 /86 /87 NMSS-7 NRR-3 REQUIREMENTS FOR CRIMINAL HISTORY CHECKS SEVERE ACCIDENT POLICY IMPLEMENTATION ON 09/87

/87 /87

/89

/88 0

PAGE 1330 R-1216320-SPC 08/17/87 SAFETY ISSUES MANAGEMENT SYSTEM PLANT DATA NSSS THERMAL OL PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXPIRATION SUSQUEHANNA 2 05000388 BWR GE 3293 MWT PENN SYLVANIA POWER & LIGHT PA 1 06/84C 03/~

APPLICABLE ISSUES IMPO.

INIT.

IMPO.

COMP.

IMPL.

COMP.

VERIFY ISSUE COMPLET PRIORITY MPA VER DOCKET PRIORITY PRIORITY VER IF~

PRIORITY 50 REACTOR VESSEL LEVEL INSTRUMENTATION IN N/A N/A N/A N/A 75 (8-76) 8-76 ITEM 1.1 - POST TRIP REVIEW; PROGRAM DES 04/85C 05/85C 00/83C 75 (8-77) 8-77 ITEM 2.1 - EQUIPMENT CLASSIFICATION & VE 03/84C 03/84C 75 (8-78) 8-78 ITEMS 3. 1. 1 & 3. 1.2 -POST MAINTENANCE TE 11/83C 06/86C 00/83C 75 (8-79) 8-79 ITEM 3. 1.3 - POST MAINTENANCE TESTING 11/83C 11/85C 00/83C 75 (8-85) 8-85 SALEM ATWS 1.2 DATA CAPABILITY 04/85C 06/85C 03/84C 75 (8-87) 8-87 SALEM ATWS 3.2. 1 & 3.2.2 S-R COMPONENTS 05/85C 06/86C 00/83C 75 (8-88) 8-88 SALEM ATWS 3.2.3 T.S. S-R COMPONENTS 05/85C 11/85C 00/83C 75 (8-92) 8-"-2 SALEM ATWS 4.5.1 DIVERSE TRIP FEATURES 11/83C 06/86C 03/84C 75 (8-93) 8-93 SALEM ATWS 4.5.2 & 4.5.3 TEST ALTERNATIV 03/84C 04/85C 8-56 D-19 DIESEL GENERATOR RELIABILITY 09/84C 09/85C 09/84C HF 1.1 SHIFT STAFFING 10/83 01/84C 10/85C I.A.1.1.1 ~ SHIFT TECHNICAL ADVISOR - ON DUTY C C 06/83C I.A.1.1.4 SHIFT TECHNICAL ADVISOR. - DESCRIBE LONG C 06/83C C 06/83C I.A.1.2 SHIFT SUPERVISOR RESPONSIBILITIES C 06/83C I.A.1.3. 1 F-02 SHIFT. MANNING - LIMIT OVERTIME C C C 06/83C I.A.1.3.2 F-02 SHIFT MANNING - MIN SHIFT CREW C C C 06/83C I.A.1.4 LONG-TERN UPGRADE OF OPERATIONS PERSONNE 04/83 04/83 I.A.2.1. 1 IMMEDIATE UPGRADING OF RO & SRO TRAINING C N/A

0 ~

PAGE 1331 R-'1216320"SPC 08/17/87 SAFETY ISSUES MANAGEMENT SYSTEM PLANT DATA NSSS THERMAL OL PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE 'REGION ISSUE EXPIRATION SUSQUEHANNA 2 05000388 BWR GE 3293 MWT PENN SYLVANIA,-POW~& LIGHT PA 1 06/84C 03/

IMPO. IHPO. IHPL. VERIFY ISSUE MPA VER DOCKET VERIFY APPLICABLE ISSUES INIT. COMP. COMP. COMPLET PRIORITY PRIORITY PRIORITY PRIORITY I.A.2.1.4 F-03 IMMEDIATE UPGRADING OF RO & SRO TRAINING 08/83C I.A.2.7 ACCREDITATION OF TRAINING INSTITUTIONS 03/85 12/86 03/85 03/87 I.A.3.1.3.A REVISE SCOPE & CRIT, FOR LIC. EXAMS - SI C N/A I.A.3. 1,3.B REVISE SCOPE & CRIT. FOR LIC. EXAMS - SI N/A I.B.1.2 EVALUATION OF ORGANIZATION & MANAGEMENT 06/83C I.C.1.1 SHORT-TERN ACCIDENT & PROCEDURES REVIEW 08/83C I.C.1.2.B F-05 SHORT-TERM ACCID. & PROCEDURES REV. - IN 07/84C 09/85C I.C.1.3.B F-05 SHORT-TERM ACCID. & PROCEDURES REV. - TR 07/84C 09/85C I.C.2 SHIFT & RELIEF TURNOVER PROCEDURES C 06/83C I.C.3 SHIFT-SUPERVISOR RESPONSIBIL1TY 06/83C I.C.4 CONTROL-ROOM ACCESS C 06/83C I.C.S F-06 FEEDBACK OF OPERATING KXPKRIENCE 06/83C I.C.6 F-07 VERIFY CORRECT PERFORMANCK OF OPERATING 11/83C I.C.7.1 NSSS VENDOR REV. OF PROC - LOW POWER TES 08/83C I.C.7.2 NSSS VENDOR REV. OF PROC - POWER ASCENSI 08/83C I.C.8 PILOT MON OF SELECTED EMERGENCY PROC FOR 08/83C I.D.2.1 F-09 PLANT-SAFETY PARAMETER DISPLAY CONSOLE - N/A N/A N/A N/A I.D.2.2 F-09 PLANT-SAFETY PARAMETER DISPLAY CONSOLE C 12/84C I.D.2.3 F-09 PLANT-SAFETY PARAMETER DISPLAY CONSOLE 12/84C

PAGE 1332 R-1216320-SPC 08/17/87 SAF ETY ISSUES MANAGEMENT SYSTEM PLANT DATA NSSS THERMAL OL PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXPIR ON SUSQUEHANNA 2 05000388 BWR GE 3293 MWT PENNSYLVANIA POWER & LIGHT PA 1 06/84C 03/24 IMPO. IMPO. IMPL. VERIFY ISSUE MPA VER DOCKET VER IF APPLICABLE ISSUES INIT. COMP. COMP. COMPLET PRIORITY PRIORITY PRIORITY PRIORI I.G.1.3 TRAINING DURING LOW-POWER TESTING " TRAI 06/85C II.B.1.2 F-10 REACTOR-COOLANT SYSTEM VENTS .- INSTALL V 08/83C II.B.1.3 F-10 REACTOR-COOLANT SYSTEM VENTS - PROCEDURE 08/83C II.B.2.2 PLANT SHIELDING " CORRECTIVE ACTIONS TO N/A II.B.2.3 F-11 PLANT SHIELDING - PLANT MODIFICATIONS (L 08/83C II.B.3.2 POSTACCIDENT SAMPLING - CORRECTIVE ACTIO N/A II.B.3.3 POSTACCIDENT SAMPLING - PROCEDURES II.B.3.4 F-12 POSTACCIDENT SAMPLING - PLANT MODIFICATI II.B.4.2.B F-13 TRAINING FOR MITIGATING CORE DAMAGE - CO 11/83C II.D.1.1 RELIEF & SAFETY VALVE TEST REQUIREMENTS 03/84C 02/87 01/86C N/A II.D.1.2.A RELIEF & SAFETY VALVE TEST REQUIREMENTS 03/84C 02/87 01/86C N/A II.D. 1. 2. B F-14 RELIEF & SAFETY VALVE TEST REQUIREMENTS 03/84C 05/86C 01/86C N/A II.D.1.3 RELIEF & SAFETY VALVE TEST REQUIREMENTS 03/84C 02/87 01/86C N/A II.D.3.1 VALVE POSITION INDICATION - INSTALL D'IRE C" 08/83C II.E. 4. 1.2 DEDICATED HYDROGEN PENETRATIONS - REVIEW C '8/83C

-II.E.4.1.3 F-18 DEDICATED HYDROGEN PENETRATION -- INSTALL C 08/83C II.E.4.2.1-4 CONTAIMENT ISOLATION DEPENDABILITY '- IMP 04/84C II.E.4.2.5.A CONTAINMENT I SOLAT .'EPENDABILITY - CNTM N/A II.E.4.2.5.B CONTAINMENT ISOLATION DEPENDABILITY - CN 04/84C

PAGE 1333 R-1216320-SPC 08/17/87 SAFETY ISSUES MANAGEMENT SYSTEM PLANT DATA NSSS THERMAL PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXPIRATION SUSQUEHANNA 2 05000388 BWR GE 3293 MWT PENNSYLVANIA ~WHATS LIGHT PA 1 06/84C 03/~

.APPLICABLE ISSUES IMPO.

INIT.

IMPO.

COMP.

IMPL.

COMP.

VERIFY ISSUE COMPLET PRIORITY MPA VER DOCKET PRIORITY PRIORITY VER IF~

PRIORITY II.E.4.2.6 F-19 CONTAINMENT ISOLATION DEPENDABILITY - CN C C C 04/84C II.E.4.2.7 F-19 CONTAINMENT ISOLATION DEPENDABILITY - RA C C 04/84C II.F.1.1 F-20 ACCIDENT-MONITORING - PROCEDURES 04/84C II.F.1.2.A F-20 ACCIDENT-MONITORING - NOBLE GAS MONITOR C 06/84C II.F.1.2.B F-21 ACCIDENT-MONITORING - IODINE/PARTICULATE II.F.1.2.C F-22 ACCIDENT-MONITORING - CONTAINMENT HIGH-R C 06/84C II.F.1.2.D F-23 ACCIDENT-MONITORING - CONTAINMENT PRESSU C 09/85C II.F.1.2.E F-24 ACCIDENT-MONITORING - CONTAINMENT WATER C 09/85C II.F.1.2.F F-25 ACCIDENT-MONITORING - CONTAINMENT HYDROG C 09/85C I!.F.2.4 INSTRUMENTATION FOR DETECT. OF INADEQUAT C 11/83C III .A. 1. 2. 1 III.A.1. 2.3 UPGRADE EMERGENCY SUPPORT UPGRADE EMER SUPPORT FACILITIES "

FACILITIES"MODS INC I

~ '

III.A.2.2 F-68 UPGRADE PREPAREDNESS - METEROROLOGICAL D III.D.1.1.1 PRIMARY COOLANT OUTSIDE CONTAIMENT - LEA C 03/84C ZII.D.3.3.1 INPLANT RAD. MONIT. - PROVIDE MEANS TO D C 03/84C ZII.D.3.3.2 F-69 INPLANT RADIATION MONIT. - MODIFICATIONS C 03/84C II . K. 1. 10 ZE BULLETINS - OPERABILITY STATUS C 11/83C ZI.K.1.22 IE BULLETINS - AUX. HEAT REM SYSTM, PROC C 08/83C II.K.1.23 IE BULLETINS - RV LEVEL, PROCEDURES C 01/84C

PAGE 1334 R-1216320-SPC 08/17/li7 SAFETY Z S S U E S MANAGEMENT SYSTEM PLANT DATA NSSS THERMAL PLANT DOCKET TYPE SUPPLIER CAPACITYNIT. LICENSEE STATE REGION ISSUE EXPIRATION SUSQUEHANNA 2 05000388 BWR GE 3293 MWT PENNSYLVANIA POWER & LIGHT PA 1 06/84C 03/~

IMPO. IMPO. IMPL. VERIFY ISSUE MPA VER DOCKET VERIF~

APPLICABLE ISSUES I -

COMP . COMP. COMPLET PRIORITY PRIORITY PRIORITY PRIORITY I!.K.1.5 IE BULLETINS - REVIEW ESF VALVES C 05/84C II.K. 3. 13. B F-43 FINAl. RECOMMENDATIONS,B&0 TASK FORCE - H C 08/83C II.K.3.15 F-45 FINAL RECOMMENDATIONS,B&0 TASK FORCE - I C 08/83C II.K.3. 16. B F-46 FINAL RECOM.,B&0 TASK FORCE - CHALLENGE C 08/83C II.K.3.17 F-47 F'ZNAL RECOMMENDATIONS,B&0 TASK FORCE - E N/A ZZ.K.3.18.C F-48 FINAL RECOMMENDATIONS,B&0 TASK FORCE - A C 05/84C II.K.3. 21. B F-50 FINAL RECOMMENDATIONS,B&0 TASK FORCE - R C 01/84C II.K.3.22.A F-51 FINAL RECOMMENDATIONS,B&0 TASK FORCE - R C 08/83C II.K.3.22.B F-51 FINAL RECOMMENDATIONS,B&0 TASK FORCE " R C . 08/83C II.K.3.24 F-52 FINAL RECOMMENDATIONS,B&0 TASK FORCE - S C 08/83C II.K.3.25.A FINAL RECOMMENDATIONS,B&0 TASK FORCE - P C 07/84C II.K.3.25.B F-53 FINAL RECOMMENDATIONS,B&0 TASK FORCE - P C 08/83C II.K.3.27 f-54 FINAL RECOMMENDATIONS,B&0 TASK FORCE - C C 05/84C II.K.3.28 F-55 FINAL RECOMMENDATIONS,B&0 TASK FORCE - Q C -5/84C M54612 SUSQUEHANNA 2 - COMMON El.ECTRICAL POWER 02/84C 05/84C M54613 SUSQUEHANNA 2 - HIGH ENERGY LINE BREAKS 04/84C 05/84C M54634 SUSQUEHANNA 2 - EXEMPTION FROM STATE AND 01/84C 04/84C M54754 SUSQUEHANNA - VHS HEAT LOAD 04/84C 11/84C M54756 SUSQUEHANNA-2 - NZTROGEN MAKEUP SYSTEM 04/84C 10/84C

I PAGE 1335 R-1/$ 5320-SPC 08/17'/8Z

'31 SAFETY ISSUES MANAGEMENT SYSTEM PLANT DATA PLANT 4(

DOCKET P'APACITY NSSS SUPPLIER THERMAL LICENSEE OL STATE REGION ISSUE EXPIRA N SUSQUEHANNA 2 05000388 QWR. GE 3293 MWT PENNSYLVANIA -POWH>4 LIGHT PA 1 06/84C 03/24 IMPO. IMPO. IMPL. VERIFY ISSUE MPA VER DOCKET VER IF APPLICABLE ISSUES INIT.. COMP. COMP. COMPLET PRIORITY PRIORITY PRIORITY PRIORI M54765 SUSQUEHANNA. 2 INITIAL TEST PROGRAM,. 04/84C 05/84C M M54950 SUSQUEHANNA 2 - PHYSICAL SECURITY PLAN 05/84C 12/84C M5496$ SUSQUEHANNA 2 - FEEDWATER BYPASS LEAKAGE 05/84C 12/84C M)5022 SUSQUEHANNA 2 - THERMAL HYDRAULIC STABIL 05/84C 10/84C M55089 SUSQUEHANNA 2 - EXEMPTION'O GENERALbDES 05/84C 09/84C M55665 SUSQUEHANNA 2 - REVIEW SER.INPUTS PER DL 09/84C 10/84C M55778 SUSQUEHANNA 2 - IN-VESSEL FUEL RACK" . 09/84C 01/85C M55780 SUSQUEHANNA 2 - EMERGEN Y SERVICE-WATER 09/84C 02/85C M55802 SUSQUEHANNA 2 - MCPR OPFRATIONAL LIMIT 09/84C 04/85C M55985 SUSQUEHANNA 2 - ESW MOTOR 'OPERATED VAlVE 09/84C 09/85C M56040 SUSQUEHANNA 2 - 480 VOt.g SWING BUSSES 10/84C 07/85C M56059 SUSQUEHANNA 2 - HEPA FILTERS AND CHARCOA 09/84C 04/85C N-N56323 SUSQUEHANNA UNIT 2 - CTNT INERTING 11/84C 12/84C 0P; M56324 ('USQUEHANNA 2 --ASME CLASS E CODE CASE 11/84C 12/84C

  • A' (

.P r' M56431 SUSQUEHANNA 2 - CORE DAMAGE ESTIMATION 11/84C 10/85C

~ ~

M56532 SUSQUEHANNA UNIT 2 - 125 VOLT BATTERIES 12/84C 02/85C M56586 SUSQUEHANNA 2 - FW BYPASS LEAKAGE 12/84C '8/85C M56757 SUSQUEHANNA 2 - IST 12/84C M56761 SUSQUEHANNA 2 - INSTALLATION OF 5TH DIES 12/84C 12/85C

e e 4 PAGE 13'36 R-1216320-SPC 08/17/87 S A F E T Y  : S S U E S MANAGEMENT S Y S T E N PLANT DATA NSSS THERMAL OL PLAN'1 DOCKET -"'i.-'UPPLIER CAPACITY LICFNSEE STATE REGION ISSUE EXP IRA N SUSQUEHANNA 2 '.~~'.ipb)M 88 PMP GE 3293 NWT PENNSYLVANIA o", ~

Ec LIGHT Pk 1 06/> tC 03/24 IMPO ricPO IN~ VERIF~ ISSUE NP4; VER DOCKET VER IF APPLICABLa i.=SUES INIT.

'MP. C~!~. COMPLE- oRIOR ITY PRIORITY PRIORITY PRIORI N56823 SUSQUEHANNA 2 - ENERt5ENG>'IESEL GEN. RE 02/85C ~~!85C M56829 SUSQUEHANNA 2 - ENVIRON>i~".'NTAL QUALIFICAT 01/85C 03/85C N56832 SUSQUEHANNA 2 FIRE (5/01'ECTION REPORT R 01/85C 06/85C N56890 SUSQUEHANNA 2 - L.C:t2LC. (12) (E) INADEQU 02/85C 04/85C N56956 SUSQUEHANNA 2 - PROPV18 ORGANIZATION STR 02/85C 05/85C N56960 SUSQUEHANNA 2 - PROPOSED, 15 ADS MODS 01/85C 05/85C M56964 SUSQUEHANNA 2 " PROPOSED 16 RCIC TRIP FU 02/85C 07/85C N56865 SUSQUEHANNA 2 - PROPOSED. 17 ADMINISTRATI 03/85C 05/85C M57046 SUSQUEHANNA 2 - TESTABLE SPECTACLE FLANG 10/84C 05/85C N57 102 SUSQUEHANNP ISI PROGRAM 02/85C 02/87C M57180 FIRE PROT".ON AUDIT W/REGION I SUPPORT 03/85C 09/85C N57328 SUSQUEHANNA 2 - FUEL LOADING CHAMBERS 04/85C D9/85C M57670 SUSQUEHANNA 2 - SINGLE LOOP OPERATION 04/85( 04/86C M57983 SUSQUEHANNA L - CLOSURE OF- L:C. 2 .C.(27 ) 06/85( -f'3/86C N57985 SUSQUEHANNA j. - CLOSURE OF L.C. 2.C.(32) 06/85C 03/86C N59476 SUSQUEHAH15:-. . - TECH. SPEC. INTERPRETATI 08/85C 12/84C M59648 SUSQUEHANNA 2 - FIRE PROTECTION REPORT 09/85C N59687 SUSQUEHANNA 2 - SPPCIAL REPORTING REQUIR 07/85C 10/85C N59833 SUSQUEHANNA 2 - DELETE L.C. 2.C.(4)/PROP 09/85C 02/86C

/

PAGE 133.7 R- 1216320-SPC C 08/17/87 SAFETY ISSUES MANAGEMENT SYSTEM PLANT DATA NSSS THERMAL OL PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXPIRA N SUSQUEHANNA 2 05)0. F88 BWR GE 32S3 HWT PENNSYLVANIA ~WHG'* LIGHT PA 1 "06/84C 03/24 IMPO. IMPO. IMPL. VERIFY ISSUE MPA VER DOCKET VER IF APPLICABLE ISSUES INIT. COMP. COMP. COMPLET PRIORITY PRIORITY PRIORITY PRIORI M60120 SUSQUEHANNA 2 - BREAKER NODS/25 10/85C 04/86C M60209 SUSQUEHANNA 2 - MCC (74/28) 11/85C 03/86C M60211 SUSQUEHANNA 2 - ZONE III RAD MONITORS 11/85C 02/86C M60323 SUSQUEHANNA 2 - TECH. SPEC. INTERPRETATI 12/85C 04/86C M60436 SUSQUEHANNA 2 - ADS MODS PROP (75/29) 12/85C M60438 SUSQUEHANNA 2 - PROPOSED (76/31) ADMIN C 12/85C 04/87C N60439 SUSQUEHANNA 2 - MSIV SETPOINT CHANGE ON 12/85C 04/86C N60441 SUSQUEHANNA 2 - TNI ITEM I.C.1.2A 01/86C 02/87C M60442 SUSQUEHANNA 2 " TMI ITEM I.C. 1. 3. A 01/86C 02/87C M60445 SUSQUEHANNA 2 - TMI ITEN III.D.1.1 01/86C 02/87C M60924 SUSQUEHANNA 2 - FIFTH DIESEL 02/86C 06/87C M610S8 SUSQUEHANNA 2 - (81/34) - DRYWELL COOLIN 03/86C 06/87C N6 1315 SUSQUEHANNA 2 - ISOL. VLV IN RWCW(35) 04/86C 07/86C N61323 SUSQUEHANNA 2 - DG RELIABILITY TECH. SPE 04/86C 09/86C M6 1334 SUSQUEHANNA 2 - DIESEL RELIABILITY TECH. 04/86C 09/86C M61455 SUSQUEHANNA 2 - CHANNEL FUNCTIONAL TESTI 04/86C 02/87C M61564 SUSQUEHANNA 2 - SECONDARY CNTNT (84/37) 05/86C 08/86C M61764 SUSQUEHANNA 2 - RELOAD 06/86C 10/86C M61815 SUSQUEHANNA 2 - MSIV HIGH RAD SETPOINT 06/86C 04/87C

~ ~

R-1216320-SPC M62013 M62235 M62961 PLANT SUSQUEHANNA 2 DOCKET 05000388 SAFETY APPLICABLE ISSUES SUSUEHANNA 2 NA-1: AMEND SUSQUEHANNA 2 LIC TYPE BWR SALP GE ISSUES MANAGEMENT SYSTEM NSSS SUPPLIER 3293 TO EXTEND DURATION OF F PLANT DATA THERMAL CAPACITY MWT IMPO.

INIT.

07/86C 08/86C

- JET IMPINGEMENT ON CONTA 09/86C

- EXEMPTION FROM GDC-4 IMPO.

COMP.

01/87C LICENSEE PENNSYLVANIA POWER & LIGHT IMPL.

COMP.

VERIFY

'L ISSUE COMPLET PRIORITY STATE REGION ISSUE PA MPA VER 1 06/84C DOCKET PRIORITY PRIORITY PAGE VERIF

$ 338 08/17/87 EXPIRA 03/24 PRIORI N

M63447 SUSQUEHANNA 2 10/86C M63449 SUSQUEHANNA 2 - DEGRADED VOLTAGE PROTECT 09/86C 07/87C M63451 SUSQUEHANNA 2 - PHYSICAL SECURITY PLAN C 10/86C 03/87C M64695 SUSQUEHANNA 2 - ADMINISTRATIVE CHANGES 8 08/86C 09/87 M65021 SUSQUEHANNA 2 - PUMP TRIP BYPASS ON TURB 02/87C 07/87C M65023 SUSQUEHANNA 2 - HISTORICAL PRESERVATION 03/87C M65025 SUSQUEHANNA 2 " POST ACCIDENT ALTERNATIV 02/87C M65110 SUSQUEHANNA 2 " EMERGENCY TECH. SPEC. CH 04/87C 04/87C M65158 SUSQUEHANNA 2 - SODIUM PENTABORATE CONC. 04/87C 09/87 M65160 SUSQUEHANNA 2 - FUNCTIONAL TESTING OF SN 04/87C 09/87 M65166 SUSQUEHANNA 2 - NEW ACTION STATEMENT FOR 04/87C M65168 SUSQUEHANNA 2 - SGTS HI-RAD INST. SURV. 04/87C M65170 SUSQUEHANNA 2 SDV VENT/DRAIN VALVE SUR 04/87C 09/87 M65172 SUSQUEHANNA 2 REVIEW OF REPORT FOR COR 04/87C 02/88 M65645 SUSQUEHANNA 2 - COMMON MODE FAILURE POTE 06/87C M65682 SUSQUEHANNA 2 - OVERCURRENT PROTECTIVE D 06/87C

PAGE 1339 R-1216320-SPC SAFETY ISSUES MANAGEMENT SYSTEM 08/if/87 PLANT DATA NSSS THERMAL OL PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXPIRATION SUSQUEHANNA 2 05000388 BWR GE 3293 MWT PENNSYLVANIA VOWER'& LIGHT PA 1 06/84C 03/~

APPLICABLE ISSUES IMPO.

INIT.

IMPO.

COMP.

IMPL.

COMP.

VERIFY ISSUE COMPLET PRIORITY MPA VER DOCKET PRIORITY PRIORITY VER IF~

PRIORITY M65 818 SUSQUEHANNA UNIT 2 - SINGLE LOOP OPERATI 06/87C M65838 SUSQUEHANNA 2 - BATTERY LOAD PROFILE INC 06/87C A-18 TECH SPECS AFFECTED BY 50.72 AND 50.73 ( 09/84C 11/84C 04/84C H MPA-A-.20 A-20 10 CFR 50.62 OPERATING REACTOR REVIEWS 06/84C 09/87 00/88 F-08 I.D.1.1 DETAILED CONTROL ROOM DESIGN REV 03/84C 00/82C MPA-F -71 F"71 I.D.1.2 DETAILED CONTROL ROOM REVIEW (FO 10/84C 12/86 NMSS-2 ACCESS AUTHORIZATION 02/87 12/87 04/88 /89 H NMSS-3 MISC AMEND CONCERN PHYSICAL PROTECTION 0 07/86 10/86 /87 /87 H NMSS-4 SEARCHES OF INDIVIDUALS AT POWER REACTOR 07/86 10/86 /87 /87 H NMSS-5 REPORTING REQUIREMENTS FOR SAFEGUARDS EV /86 /86 /87 /87 H NMSS-7 REQUIREMENTS FOR CRIMINAL HISTORY CHECKS /87 /87 /88 /88 H NRR-3 SEVERE ACCIDENT POLICY IMPLEMENTATION ON 09/87 /89 /89 H

l ee