Revision:2 Survey Area: LSA-05 Survey Unit: 02 FSS Field Loe:

Date/Time:

08/13/13 0630 08113113 0740 08/13/13 0830 08/13i13 1300 08/13/13 rs00 08lt3lt3 1745

==

Description:==

==

Description:==

Tile Barn Area Page Pl of I HDP-PR-FSS-701, Final Status Survey Plan Development APPENDIX P.6 FSS FIELD LOG Barn and Cistern Open Land Area Observation or Comment:

Technician Received our daily FSS briefing and safety briefing. M. Bresnahan SDJ / NJJ Covered the instructions for FSS in LSA 05-02, including GWS, Survey And soil sampling instruction Performed daily instrument source check for the 2221BB and2221DD and2360I. All meters successfully passed the source check. Assembled GWS packs and proceeded to LSA 05-02 area to prepare our daily work assignments.

Conducted Non-soil survey of Curb, Storm Drain and Drain Pipe using Using 2360I and smears. All readings documented on survey map. No Elevated areas were noted on the surfaces of the items surveyed. All surveys conducted in accordance with FSS Plan and Instructions for Survey area & Unit LSA 05-02. See Surveys 3063 C 130814, 3064 C 130814, 3065 C 130814, 3066 C 130814 for further information. N. Jordan performed GWS on area in 05-03 that was previously used as a load out area during excavation. one elevated area noted during walkover. Location was flagged and location stored in GPS for further investigation. Data was downloaded and sent to GIS for map processing and S. Price for data analysis. See survey 3051 C 130813 for further information.

Scraped and swept footer in LSA 05-02 in preparations for survey. painted One meter grids on footer in accordance with survey instructions.

Preparations made for isolation & control of LSA 05-03, including installing T-Posts and safety caps, repairs ofconstruction fence and general housekeeping of the area.

Performed post source check of all FSS meters. 2221meters passed successfully.

2360 "r' failed Beta three consecutive times. All Survey data from the non-soil Survey is null and void. will have to repeat the survey process another day.

END SDJ /NJJ house Non-FSS Field Log I of I

Page Pl of I HDP-PR-FSS-701, Final Status Survey Plan Development LSA-05 APPENDIX P-6 FSS FIELD LOG

==

Description:==

==

Description:==

Barns and Cistern Open Land Area Tile Bam Area Survey Area:

Survey Unit:

Rltqhl oboo FSS Field Loe:

Date/Time:

Observation or Comment:

-- ^tdrt fu", *rllw "#t"l 4 Zo #)

(ncast^kttt.Al [,co6,ans lrt.6 nq.

FSS Field r.[e I or-l

Revision:2 LSA-05 Page Pl of I Survey Area:

Survey Unit:

02 HDP-PR-FSS-701, Final Status Survey Plan Development APPENDIX P.6 FSS FIELD LOG

==

Description:==

==

Description:==

Bam and Cistern Open Land Area Tile Barn Area F'SS Field Loe:

Date/Time:

08lr4lt3 0630 08lt4lr3 0740 08/14l13 0830 Observation or Comment:

Technician Received our daily safety briefing covering hazards associated with GWS, SDJ / NJJ surveying and soil sampling.

Performed daily instrument source check for the 2221BB and222l DD and2360 L All meters successfully passed the source check and results annotated in daily source check log. Assembled GWS packs and proceeded to barn area access shack near LSA 05-02 area to prepare for our daily work assignments.

N. Jordan and S. Jenkins performed a repeat non-soil survey of footer area Within LSA 05-02. The survey performed on 8/13 was deemed void because the 2360 used failed post use source check. The non-soil of Curb, Storm Drain and Drain Pipe using using 23608 and D and smears. All readings documented on survey map. No elevated areas were noted on the surfaces of the items surveyed. All surveys conducted in accordance with FSS Plan and Instructions for survey area & Unit LSA 05-02.

See Surveys 3063 C 130814, 3064 C 130814, 3065 C 130814, 3066 C 130814 for further information.

08/14113 1300 Started GWS of LSA 05-02 using 2221meters BB and DD.

08ll4ll3 1630 GWS data was downloaded and sent to GIS for map processing and S. Price For data analysis. All GWS conducted in accordance with FSS Plan and Instructions for Survey arca & Unit LSA 05-02. See survey 3060 C 130814, 3062 C 130814 for further information.

08ll4ll3 1730 Performed post source check of all FSS meters. All meters passed post source check successfully.

END SDJ / NJJ Westin Class 3 FSS Field Log I of I

Revision: 2 LSA-05 Page Pl of2 HDP-PR-FSS-701, Final Status Survey Plan Development APPENDIX P.6 FSS FIELD LOG Survey Area:

Survey Unit:

==

Description:==

==

Description:==

Tile Barn Area Barn and Cistern Open Land Area 02 FSS Field Loe:

Date/Time: Observation or Comment:

08/15/13 0630 Received our daily FSS briefing and safety briefing.

08ll5ll3 0645 Performed daily instrument source check for the 2221BB and222l DD and2360I. All meters successfully passed the source check. Proceeded to LSA 05-02 area to continue GWS and start systematic soil sampling efforts.

08ll5ll3 0715 Proceeded to barn area and continued GWS of LSA 05-02.

08ll5ll3 0720 Dump trucks arrived at bam area to deliver clean backfill soil for LSA 05-01 FSS operations. Work in LSA 05-02 was halted to provide job coverage for dump truck delivery in 05-01. N. Jordan assigned to cover dump truck operations.

08/15/13 0830 S. Jenkins and S. Price began investigationatlocalized elevated area that was found during walkover of 05-03 former soil load out area. Bounding investigation samples were taken. See survey 3081 C 130815 for sample information. Soil was hand excavated at highest reading locations and spoils were moved to 05-01 using a wheelbarrow.

08/15/13 0845 N. Jordan began GWS of area parallel with State Highway P across the northern section of LSA 05-02. Created GPS file LSA_0502_BB_081513.

See survey 3165 C 130815 for more information.

08/15/13 1030 N. Jordan finished a portion of the GWS and began painting other portions of LSA 05-02 in preparation for further GWS.

Technician SDJ / NJJ FSS Field Log I ofJ

Revision: 2 HDP-PR-F'SS-701, Final Status Survey Plan Development APPENDIX P-6 FSS FIELD LOG Date/Time: Observation or Comment:

08/15/13 1300 N. Jordan continued with GWS in LSA 05-02. S. Jenkins & S. Price began Flagging systematic soil sample locations within LSA 05-02 using GPS.

The following sample locations were flagged for systematic sampling.

Sample lD Eastins Northine 1050247PRS00 826664_3 8547 84.4 1050248PES00 826664.3 864784.4 1050249PRS00 826637.4 864757.5 1050250PES00 826637.4 864757.5 1050251 PRS00 826674.1 864747.7 1050252PES00 826674.1 864747.7 1050253PES00 826710.8 864737.8 1050254PES00 826647.2 864720.8 1050255PES00 826683.9 864711.0 1050256PRS00 826620.4 864693.9 1050257PES00 826620.4 864693.9 1050258PES00 826657.1 864684.1 1050259PRQ00 826693.8 864674.2 1050259PRS00 826693.8 864674.2 1050260PES00 826693.8 864674.2 1050261 PRS00 826593.5 864667.0 1050262PES00 826593.5 864667.0 1050263PES00 826630.2 864657.2 1050264PRS00 826666.9 864647.4 1050265PES00 826666.9 864647.4 PageP2 of2 Technician SDJ / NJJ 08ltslt3 1730 08/15/13 1800 Sample L050258PES00 had to be offset one foot south to avoid the concrete footer located in the center of LSA 05-02. The new coordinates are N-864683.t 4, E-826658.29.

N. Jordan finished portions of the GWS of LSA 05-02 and created GPS File LSA_0502_BB_081513_02. See survey 3132 C 130815 for more information.

Performed post source check of all FSS meters. All meters passed post source check successfully.

END SDJ /NJJ FSS Field Log 3 of ?-

Revision: 2 Survey Area: LSA-05 Survey Unit: 02 FSS Field Loe:

Date/Time:

08/16/13 0630 08/16/13 0700 Page Pl of2 HDP-PR-FSS-701, Final Status Survey Plan Development APPENDIX P.6 FSS FIELD LOG

==

Description:==

==

Description:==

Barn and Cistern Open Land Area Tile Bam Area Observation or Comment:

Received our daily FSS briefing and safety briefing.

Performed daily instrument source check for the 2221BB and222l DD and2360I. All meters successfully passed the source check. Proceeded to LSA 05-02 area to continue GWS and systematic soil sampling efforts.

Arrived at barns area and began GWS in remaining area of LSA 05-02.

Created the following GPS files: LSA_0502_081613_BB and LSA_0502_081613_DD. See surveys 3133 C 130816 and3146 C 130816 for more information.

Performed biased soil sampling from 0 - 0.5'at the following locations in LSA 05-02.

L050266PUB00 N-864671.6 E-826587.6 L050267PUB00 N-864678.0 E-826s9r.5 L050268PUB00 N-864686.1 E-826s93.9 See survey 3382 C 130816 Technician SDJ / NJJ 08/16/13 0800 08/16/13 I 130 08l16l13 1230 Established soil sample processing area within exclusion zone and began Systematic soil sampling efforts within LSA 05-02 with the support of Tim Deichman and Dennis Young from the Operations department.

The following locations were sampled to the specified depths:

Sample lD Start Depth Easting Northing 1050247PRS0O O 4

826664.3 8s47 U.4 8/76/2073 105O2/I8PES0O 4 4.5 8266il.3 854784.4 8/16/2073 1050249PRS0O O 4

826637.4 8647s7.s 8/76/2073 10s02s0PES00 4 4.s 826637.4 8647s7.s 8/76/2OL3 10s02ssPEs00 0 0.s 826683.9 8647rt.O 8/16/2OL3 r.0s02s8PES00 0 0.s 8266s7.L 864584.1 8/L6/2OL3 L050259PRQ0O 0 3.s 826693 8 8@674.3 8/L6/2OL3 10so2s9PRS00 0 3.5 826693.8 8&674.3 8/L6/2OL3 1050250PES00 3.5 4 826693.8 86674.3 8/L6/2O73 1050263PES00 0 0.s 826630.2 8@6s7.2 8/76/2013 1050264PRS0O 0 1

825565.9 8UU7.4 8/76/2Ot3 10s026sPES0O 1 1.s 826666.9 8&647.4 8/16/2OL3 See survey 3306 C 130816 for more information.

use Non-Class 3 FSS Field Log I of

Revision:2 PageP2 of2 HDP-PR-FSS-701, Final Status Survey Plan Development APPENDIX P.6 FSS FIELD LOG DatelTime: Observation or Comment:

Technician 08l16113 1700 Delivered samples to the cage in 230 warehouse to secure over the weekend.

08116113 1740 Performed post FSS instrument source checks. All instruments passed post Check successfully.

SDJ / NJJ END SDJ / NJJ FSS Field Log 7 of L use No

Revision: 2 Survey Area: LSA-05 Survey Unit: 02 Page Pl of1 HDP-PR-FSS-701, Final Status Survey Plan Development APPENDIX P.6 F'SS FIELD LOG

==

Description:==

==

Description:==

Tile Barn Area Barn and Cistern Open Land Area FSS Field Loe:

Date/Time: Observation or Comment:

08ll9ll3 0630 Received our daily FSS briefing and safety briefing.

08ll9ll3 0700 Performed daily instrument source check for all FSS instruments.

All meters successfully passed the source check. Proceeded to LSA 05-02 area to continue GWS and systematic soil sampling efforts.

Technician SDJ/NJJ/JH 08ll9ll3 0730 N. Jordan performed GWS around sump area of LSA 05-02. See survey 3134 C 130819 for more information. Finished systematic soil sampling in LSA 05-02. Samples taken at the following locations and depths:

Sample lD Start Depth Easting Northing 1050251pRS00 0.0' 1.0' 82667 4.7 864747.7 1050252pES00 1.0' 1.5', 826674.7 864747,7 1050253pES00 0.0' 0.5' 8267L0.8 864737.8 1050254pES00 0.0' 0.5' 826547.2 864720.8 1050256pRS00 0.0' 0.5, 826620.4 854693.9 1050257pES00 0.5', 1.0', 825620.4 804693.9 1050261pRS00 0.0' 2.0' 826593.5 864667.1, 1050262pES00 2.0' 2.5' 826593.5 864667.1 See survey 3307 C 130819 for more information 08/19/13 1300 Began the GWS of LSA 05-03. Installed a snow fence boundary between LSA 05-02 and 05-03.

08/19/13 1600 Performed biased sampling from 0 - 0.5'at the following locations in In LSA 05-03 based on GWS data:

L050323PUB00 N-864823.34 E-826718.36 L050324PUB00 N-864891.74 E-826783.77 L05032spuB00 N-864907.21 E-826827.64 See survey 3336 C 130819 for more information.

08/19/13 1800 Performed post source check of all FSS meters. All meters passed post source check successfully.

END SDJ / NJJ / JH FSS Field rog I of I uali Record Westi use Non Class 3

Revision: 2 LSA-05 Page Pl of2 HDP-PR-FSS-701, Final Status Survey Plan Development APPENDIX P.6 FSS FIELD LOG Survey Area:

Survey Unit:

02 &03

==

Description:==

==

Description:==

Tile Bam Area Barn and Cistern Open Land Area FSS Field Los:

Date/Time:

08120113 0630 08120113 0700 081201t3 07t5 08120113 0730 08/20113 1000 Observation or Comment:

Received our daily FSS briefing and safety briefing.

Performed daily instrument source check for all FSS instruments.

All meters successfully passed the source check.

N. Jordan completed documentation of recent surveys. Gathered necessary equipment for field support.

Began job coverage at the barns area in support of ECC work in LSA 05-01, GWS and sample point flagging within LSA 05-03 and LSA 05-02 sump area GWS.

N. Jordan completed GWS of Sump Area within LSA 05-02. See survey 3164 C 130820 for more information.

Technician SDJA{JJIJAH 08/20113 I100 S. Jenkins and N. Jordan completed survey of interior of the storm water basin located in LSA 05-02. See survey 3162 C 130820 for more information.

08120113 1300 S. Jenkins pulled biased soil sample in the bottom of the Sump Area in LSA 05-02 at the following location:

L050269PUB00 N-864673.01 E-826687.s3.

See survey 3335 C 130820 for more information.

08120113 1455 Performed biased sampling at the following location in LSA 05-03 sidewall:

L050326PUB00 N-864825.94 E-826699.56 ualit Record Westin FSS Field Log I of I

Revision: 2 Date/Time:

HDP-PR-FSS-701, Final Status Survey Plan Development APPENDIX P-6 FSS FIELD LOG Observation or Comment:

08120113 1520 Performed systematic soil sampling of the following locations within LSA 05-03 with support from the Operations department:

PageP2 of2 Technician SDJAIJJiJAH Sample lD 1050301 PRS00 1050302PES00 1050303PRS00 1050304PEQ00 1050304PES00 1050305PRS00 1050306PES00 1050307PRS00 1050308PES00 Start 0.0' 2.0' 0.0' 1.5' 1.5' 0.0' 4.5' 0.0' 3.0' End 2.0' 2.s',

1.5' 2.0' 2.0' 4.5' 5.0' 3.0' 3.5' Easting 826747.6 826747.6 826706.5 826706.5 826706.5 826777.6 826777.6 826736.6 826736.6 Northing 864773.6 864773.6 864784.6 864784.6 864784.6 864803.5 864803.6 864814.6 864814.5 08120113 1730 Completed equipment decontamination and clean-up of sample processing atea.

08/20113 1800 Secured all samples within the sample cage. Performed post source check of all FSS meters. All meters passed post source check successfully.

END SDJATJJ/JAH Class 3 FSS Field Log /oL-