Forwards Integrated Schedule Monthly Summary Rept for Sept 1989.Integrated Schedule Based on Listed Refueling & Maint Outage Schedules
ML17347B408
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/09/1989
From: Harris K
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-380, NUDOCS 8911150086
Download: ML17347B408 (8)


Text

ACCELERATED ISTBZBUTION DEMONSTFMTION SYSTEM t

gO REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8911150086 DOC.DATE: 89/11/09 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION HARRIS,K.N. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

~

SUBJECT:

Forwards integrated schedule monthly summary rept for Sept 1989.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 1 PD2-2 PD 1 1' EDISON,G 5 5 INTERNAL: NRR/DEST/ADS 7E 1 1 NRR/DEST/ESB 8D 1 NRR/DEST/ICSB 1 1 NRR/DEST/MTB 9H 1 1 NRR/DEST/RSB 8E 1 1 NRR/DOEA/TSB 11 1 1 NUDOCS-ABSTRACT 1 1 OC 1 0 OGC/HDS2 1 0 REG FILE 1 1 RES/DSIR/EIB 1 1 EXTERNAL:. LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACI'HE DOCUMENT CONTROL DESK ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 19

~y P.O.Box14000,Juno Baach,FL 33408-0420 L-89-380 goy 09 1989 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Inte rated Schedule Monthl Summar Attached is the Summary Report of the Integrated Schedule generated for the month of September 1989. The schedules discussed in this report reflect information as of the issuance date of September 15; 1989. Updated information will be provided in subsequent reports. The changes to the schedule discussed in this summary have been reviewed with the NRC Staff in accordance with the Integrated Schedule Plan.

Should there be any questions regarding this information, please contact us.

Very truly yours, Vice resident Turkey Point Plant Nuclear IKNH/TCG/gp Attachment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant C

Pool 8%i.il500S6 89ii09 05000250 DR ADOCK PDC an FPL Group company

tl I

TURKEY POINT UNITS 3 AND 4 SEPTEMBER 1989 INTEGRATED SCHEDULE The September 1989 Integrated Schedule (IS) is based on the following refueling and maintenance outage schedules:

OUTAGE DESCRIPTION START FINISH NOTES Unit 3 Cycle 12 Refueling 02/15/90 05/30/90 Unit 3 Diesel Tie-In 01/15/91 06/30/91 Unit 3 Cycle 13 Refueling 01/01/92 04/15/92 Unit 3 Cycle 14 Refueling 10/01/93 12/03/93 Unit 4 Cycle 12 Refueling 01/15/91 06/30/91 Unit 4 Cycle 13 Refueling 10/01/92 12/03/92 Unit 4 Cycle 14 Refueling 04/01/94 06/03/94 1 Based on projections by Turkey Point Management 2 Estimated Changes to the Integrated Schedule since the last issue, August 1989, are summarized as follows:

NRC MODIFICATIONS WITH FORECAST COMPLETION DATES BEYOND THEIR BASELINE SCHEDULE DATES BASELINE MOD NRC NRC DATE UNIT DESCRIPTION CAT AUG 89 SEPT 89 MAY 89 NOTES 569 4 NORM CTMT CLRS CTRL SW'S NRR 11/22/89 3/20/90 1/16/90 700 C VITAL AREA BARRIERS NRR 11/21/90 1/9/91 9/30/90 792 S CONTROL RM LGTING EVAL NRR 5/10/90 8/15/90 3/24/90 1011 S CONTROL RM HFE ANNUNCTR NRR 4/12/90 7/3/90 2/6/90 1069 3 RX HEAD LIFT RIG LOAD NRR 8/16/90 12/3/90 8/5/90 CELL 1070 4 RX HEAD LIFT RIG LOAD NRR 5/15/91 12/5/90 8/5/90 CELL 1183 C PERIMETER FENCING & NRR 8/21/91 8/6/91 5/17/91 1 INTRUSION DETECTION 1184 C SECURITY ACCESS CONTROL/ NRR 8/21/91 7/11/91 11/11/90 1 CARD READER 1185 C SECURITY COMPUTER SYSTEM NRR 3/11/92 2/3/92 1/19/91 - 1

Page two NRC MODIFICATIONS WITH FORECAST COMPLETION DATES BEYOND THEIR BASELINE SCHEDULE DATES BASELINE MOD NRC NRC DATE UNIT DESCRIPTION CAT AUG 89 SEPT 89 MAY 89 NOTES 1290 C CNTL RM OP DES PHONE NRR 11/26/90 1/16/91 12/4/90 REACH RESOLUTION 1291 C CONTROL RM RELABELING NRR 6/18/90 9/26/9 0 5/5/90 1292 S CONTROL RM DEMARCATION NRR 3/6/90 6/26/90 2/2/90 DOCUMENTATION 1293 3 CONTROL LD METERS-ADD NRR 8/16/90 10/16/89 5/25/90 UNITS/CHA SCALE 1294 4 CONTROL LD METERS-ADD NRR 8/17/90 10/16/90 5/25/90 UNITS/CHA SCALE 1297 3 NIS-ELIM. UNUSED SW NRR 11/12/90 1/14/91 8/18/90 POSITIONS 1298 4 NIS-ELIM. UNUSED SW NRR ll/12/90 1/14/91 8/18/90 POSITIONS 1312 S THERMAL STRESS PPG NRR 2/8/90 7/5/91 12/5/89 CONNECTED TO RCS 1325 S PROBABILITY RISK NRR 2/25/91 3/11/91 2/11/91 ASSESSMENT PROGRAM 610 C EDG START AIR SYS/QUAL I&E 7/26/89 8/23/89 6/24/89 1056 S PWR LOSS TO VITAL BUS I&E 8/19/90 7/3/90 2/5/90 AT SALEM 2 1110 4 MOV FAILURE DUE TO I&E 8/17/89 9/14/89 6/11/89 IMPROPER SW SETTING 1313 3 SMALL BORE PIPING/ I&E 12/31/90 3/13/91 12/3/90 NCR DISPOSITION 1314 4 SMALL BORE PIPING/ I&E 12/31/90 3/19/91 12/3/90 NCR DISPOSITION 1320 C FLOOD PROT EDG FUEL OIL I&E 3/13/90 2/4/91 5/30/90 XFER PUMPS The above status is based on baseline schedule dates established in the May 1989 Integrated Schedule Six-Month Report.

Page three NOTES NOTE 1 The project completion dates for the security project items reflect in progress status. The schedules for completion of the security modifications were discussed with the NRC at a meeting at the Turkey Point Plant on=July 18, 1989 and at the.

NRC/FPL Management Meeting on September 19, 1989. The integrated schedule will be revised to reflect those dates.

NOTE 2 Phase I is complete. Unit 3 inspections will be done during the 1990 outage.

NOTE 3 FPL is working toward a June 1991 completion date for the PRA Program, consistent with the two year interval between the issuance of the NRC guidelines (issued by the NRC on August 29, 1989) and program implementation as specified in Generic Letter 88-20.

NOTE 4 Partial SATS (System Acceptance Turnover Sheets) have been issued.

NOTE 5 The completion dates have been extended based on current progress, current approved increase in scope and/or engineering resource availability.

NRC COMMITTED MODIFICATIONS ADDED MOD UNIT DESCRIPTION NRC CAT 1301 CLOSED CIRCUIT TV SECURITY SYSTEM NRC COMMITTED MODIFICATIONS COMPLETED MOD UNIT DESCRIPTION NRC CAT NONE

4 II JE

'e

\4