Forwards Integrated Schedule Monthly Summary for Aug 1989, Reflecting Info as of Issuance Date of 890818
ML17347B372
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/11/1989
From: Goldberg J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-342, NUDOCS 8910170065
Download: ML17347B372 (7)


Text

ACCELERATED DI+GBUTJON DEMONS'TION SYSI'ZM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8910170065 DOC.DATE: 89/10/11 NOTARIZED: NO N FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit. 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION NOTES:'OCKET GOLDBERG,J.H.

RECIP.NAME

SUBJECT:

Florida Power & Light Co.

RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

Forwards integrated schedule monthly summary DISTRIBUTION CODE: AOOID TITLE: OR COPIES RECEIVED: LTR Submittal: General Distribution I ENCL for L

Aug 1989.

SIZE:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 1 PD2-2 PD 1 1 h EDISON,G 5 5' INTERNAL: NRR/DEST/ADS 7E 1 NRR/DEST/ESB 8D 1 1 NRR/DEST/ICSB NRR/DEST/RSB 8E NUDOCS-ABSTRACT 1

1 1

1 1

1 NRR/DEST/MTB 9H NRR/DOEA/TSB OCJJ Eg ll 1 1

1 1

1 0

OGC/HDS2 1 0 G FILE 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 R

I D

S h

NOIR 'I0 AIL <<KIDS>> BZ)ZZPIENIS:

PIEASE HELP US I0 iKDOCE HASTE! CGNZACZ 'THE DOQ3MEÃZ CONGEAL DESK, RXN Pl-37 (EXT. 20079) K) EIiBQNATE KKR NAME HEM DIPI%KEDTXQN LIBT8 FOR DO(XlMEHI'8 RXJ DCSERT NERD TOTAL NUMBER OF, COPIES REQUIRED: TTR Zf ENCL 19

P.O. Box 14000, Juno Beach, FL 33408-0420 OCTOSSR 1 1 1989 L-89-342 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Inte rated Schedule Monthl Summar t

Attached is the Summary Report of the Integrated Schedule generated for the month of August 1989. The schedules discussed in this report reflect information as of the issuance date of August 18, 1989. Updated information will be provided in subsequent reports.

The changes to the schedule discussed in this summary have been reviewed with the NRC Staff in accordance with the Integrated Schedule Plan.

Should there be any questions regarding this information, please contact us.

H. Goldberg Executive Vice President JHG/TCG/gp Attachment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 89'10170065 891011 PDR ADOCK 05000250 PDC R

an FPL Group company

3 II I i

P l

ll

TURKEY POINT UNITS 3 AND 4 AUGUST 1989 INTEGRATED SCHEDULE The August 1989 Integrated Schedule (IS) is based on the following refueling and maintenance outage schedules:

OUTAGE DESCRIPTION START FINISH NOTES Unit 3 Cycle 12 Refueling 02/15/90 05/30/90 Unit 3 Diesel Tie-In 01/15/9 1 06/3 0/9 1 Unit 3 Cycle 13 Refueling 01/01/92 04/15/92 Unit 3 Cycle 14 Refueling 10/01/93 12/03/93 Unit 4 Cycle 12 Refueling 01/15/91 06/30/91 Unit 4 Cycle 13 Refueling 10/01/92 12/03/92 Unit 4 Cycle 14 Refueling 04/01/94 06/03/94 1 Based on projections by Turkey Point Management 2 Estimated Changes to the Integrated Schedule since the last issue, July 1989, are summarized as follows:

NRC MODIF1CATIONS WITH FORECAST COMPLETION DATES BEYOND THEIR BASELINE SCHEDULE DATES MOD NRC NRC DATE UNIT DESCRIPTION CAT JUL 89 AUG 89 MAY 89 NOTES 700 C VITAL AREA BARRIERS NRR 8/1/90 11/21/90 9/30/90 792 S CONTROL RM LGTING EVAL NRR 4/3/90 5/10/90 3/24/90 1011 S CONTROL RM HFE ANNUNCTR NRR 3/5/90 4/12/90 2/6/90 1069 3 RX HEAD LIFT RIG LOAD NRR 11/16/90 . 8/16/90 8/5/90 CELL 1070 4 RX HEAD LIFT RIG LOAD NRR 3/1/91 5/15/91 8/5/90 CELL 1182 C SECURITY PERIMETER LGT NRR 3/21/91 3/21/91 6/30/90 1183 C PERIMETER FENCING & NRR 10/14/91 8/21/91 5/17/91 INTRUSION DETECTION 1184 C SECURITY ACCESS CONTROL/ NRR 10/21/91 8/21/91 11/11/90 CARD READER 1185 C SECURITY COMPUTER SYSTEM NRR 2/14/92 3/11/92 1/19/91

Page two NRC MODIFICATIONS WITH FORECAST COMPLETION DATES BEYOND THEIR BASELINE SCHEDULE DATES MOD NRC NRC DATE UNIT DESCRIPTION CAT JUL 89 AUG 89 MAY 89 NOTES 1291 C CONTROL RM RELABELING NRR 4/20/90 6/18/90 5/5/90 5 1292 S CONTROL RM DEMARCATION NRR 1/3/90 3/6/90 2/2/90 5 DOCUMENTATION 1293 3 CONTROL LD METERS-ADD NRR 6/18/90 8/16/90 5/25/90 UNITS/CHA SCALE 1294 4 CONTROL LD METERS-ADD NRR 6/18/90 8/17/90 5/25/90 UNITS/CHA SCALE 1297 3 NIS-ELIM. UNUSED SW NRR 10/1/90 11/12/90 8/18/90 POSITIONS 1298 4 NIS-ELIM. UNUSED SW NRR 10/3/90 11/12/90 8/18/90 POSITIONS 1312 S THERMAL STRESS PPG NRR 3/14/90 2/8/90 12/5/89 CONNECTED TO RCS 1325 S PROBABILITY RISK NRR 1/16/91 2/25/91 2/11/91 ASSESSMENT PROGRAM 610 C EDG START AIR SYS/QUAL I&E 7/17/89 7/26/89 6/24/89 1056 S PWR LOSS TO VITAL BUS I&E 3/7/90 4/19/90 2/5/90

'AT SALEM 2 1110 4 MOV FAILURE DUE TO I&E 7/6/89 8/17/89 6/11/89 IMPROPER SW SETTING 1313 3 SMALL BORE PIPING/ I&E 11/28/90 12/31/90 12/3/90 NCR DISPOSITION 1314 4 SMALL BORE PIPING/ I&E 11/30/90 12/31/90 12/3/90 NCR DISPOSITION The above status is based on baseline schedule dates established in the May 1989 Integrated Schedule Six-Month Report.

NOTES NOTE 1 The project completion dates for the security project items reflect in progress status. The schedules for completion of the security modifications were discussed with the NRC at, a meeting at the Turkey Point Plant on July 18, 1989 and at the NRC/FPL Management Meeting on September 19, 1989. The integrated schedule will be revised to reflect those dates.

Page three NOTE 2 Phase I is complete. Unit 3 inspections will be done during the 1990 outage.

NOTE 3 FPL is working toward a June 1991 completion date for the PRA Program, consistent with the two year interval between the issuance of the NRC guidelines (issued by the NRC on August 29, 1989) and program implementation as specified in Generic Letter 88-20.

NOTE 4 Partial SATS (System Acceptance Turnover Sheets) have been issued.

NOTE 5 The completion dates have been extended based on current progress, current approved increase in scope and/or engineering resource availability.

NRC COMMITTED MODIFICATIONS ADDED MOD UNIT DESCRIPTION NRC CAT NONE NRC COMMITTED MODIFICATIONS COMPLETED MOD UNIT DESCRIPTION NRC CAT NONE NRC COMMITTED MODIFICATIONS WITH CHANGED COMMITMENT CATEGORY MOD UNIT DESCRIPTION NRC CAT 25 ALT SHUTDOWN CAPABILITY APPENDIX R FPL 1258 MSIV SAFETY REL AIR ACCUM SYSTEM FPL These modifications have been changed to FPL category indicating that the remaining portion of work is not NRC committed.