Advises That Util Performing Flow Tests to Demonstrate Conditions Described in NRC Bulletin 88-008, Piping Connected to RCS Unlikely at Facilities.Util Will Decide What Addl Actions Needed by 890430
ML17345A617
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/30/1988
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
IEB-88-008, IEB-88-8, L-88-558, NUDOCS 8901090130
Download: ML17345A617 (2)


Text

ACCELERATED D)STQBUTlON DEMON STRZ W SY~gg 4

I REGULATORY INFORMA, ".ON DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8901090130 DOC.DATE: 88/12/30 NOTARIZED: NO DOCKET I

FACIL
50-250 Turkey Point Plant, Unit 3, Flor' Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida ower and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION CONWAY,W.F. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

1 DISTRIBUTION CODE: IE16D COPIES RECEIVED:LTR g ENCL ~ SIZE:

TITLE: Bulletin Response 88-08 Thermal Stress in Piping to RCS.

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR EN CL ID CODE/NAME LTTR ENCL PD2-2 LA 1 PD2-2 PD EDISON,G ~

1 INTERNAL: AEOD/DOA 1 AEOD/DSP/TPAB 1 NRR HARTZMAN,M 1 NRR HUM,M 1 NRR REEVES,E.A'. 1 NRR RIVENBARK,G 1 NRR/DEST/ADE 8H NRR/DEST/MEB 9H NRR/DOEA/GCB 11 1

1 1

NRR/DEST/ADS 7E.

NRR/DOEA/EAB NRR/DREP/EPB 10 ll 1 1

1 NRR S/ILRB12 1 NUDOCS-ABSTRACT 1 EG,L 02 1 RES/DSIR/EIB 1 ILE 01 1 EXTERNAL: LPDR NRC PDR NSIC h

NVZE IO ALL>>RIDS<<RECIPIENZS:

PLEASE HELP US 'IO 'REDUCE WASTE CXKIACT THE DOI SKKZ CONTROL DESK I ~

ROOM Pl-37 (EXT. 20079) TO ELDQZATE YOUR NAME FRQH DISTIGMTZIGN LISTS PDR DOCUMENIS YOU DON'T NEED)

TOTAL NUMBER OF COPIES REQUIRED: LTTR 23 ENCL

P.O. Box 14000, Juno Beach, FL 33408.0420 L-88-558 U. S. Nuclear Regulatory Commission OECEM5Elt 3 0 198S Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Thermal Stresses in Piping Connected to Reactor Coolant S stems NRC Bulletin 88-08, "Thermal Stresses in Piping Connected to Reactor Coolant Systems", issued June 22, 1988, and supplemented on June 24, 1988 and August 4, 1988, requested that licensees (1). review their reactor coolant systems to identify any connected, unisolated piping that could be subjected to temperature distributions which would result in unacceptable thermal stresses and (2) take action where such piping is identified to ensure'hat the piping will not be subjected to unacceptable thermal stresses.

By letter L-88-436 dated October 14, 1988, Florida Power & Light Company (FPL) provided the results of our review for Turkey Point Units 3 and 4, and a plan and schedule for completing the non-destructive examination required by the-bulletin.

To provide additional assurance that the piping identified in our October 14, 1988 letter will not be subjected to unacceptable thermal stresses, FPL is having flow tests. performed to demonstrate that the conditions described in Bulletin 88-08 are unlikely at Turkey Point Units 3 and 4. These flow tests will model the geometry and temperature differences for the flow paths identified, and determine if significant stratification will occur. This testing is expected to be completed by March 1989. At that, time FPL will decide what additional actions need to be taken in response to this issue. We will inform you of those actions by April 30; 1989 you have any questions, 'hould please contact us.

Very truly yours, cg.C 5

+~ F. Mway W.

7'enior Vice President - Nuclear WFC/TCG/gp cc: Malcolm L. Ernst, Acting Regional Administrator, Region II, USNRC Resident Inspector, USNRC, Turkey Point Plant 'enior an FPL Group company 89Oiv9v130 8.-:) 2=:0 PDI=; ADCiCK 05000250 9 'DC