Forwards Integrated Schedule Monthly Summary for Jul 1988, Including New Outage Completion Date for Unit 4 - Cycle 12
ML17345A292
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/21/1988
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
L-88-315, NUDOCS 8807260417
Download: ML17345A292 (8)


Text

P C CELZ RATED Dl SIylBUTION SYPH'ZM r DEMONSTRATION REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8807260417 DOC.DATE: 88/07/21 NOTARIZED: NO DOCKET g FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light. C 05000251 AUTH. NAME AUTHOR AFFILIATION CONWAY,W.F. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards intergrated schedule monthly summary for July,1988.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ( ENCL I SIZE:

TITLE: OR Submittal: General Distribution NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 0 PD2-2 PD 5 5 EDISON,G 1 1 INTERNAL: ARM/DAF/LFMB 1 0 NRR/DEST/ADS 7E 1 1 NRR/DEST/CEB 8H 1 1 NRR/DEST/ESB 8D 1 1 NRR/DEST/MTB 9H NRR/DOEA/TSB NUD ABSTRACT ll 1 1

1 1

1 1

NRR/DEST/RSB 8E NRR/PMAS/ILRB12 OGC 15-B-18 1

1 1

1 1

0 EG 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR NSIC 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 19

'i~4p~ttjr ti .j: ~ t~

tjj,ci l,j>

'jj;jt)S "S' Cj

'I

\

I

%J.g> ccv4 !t jn,jg j4Vf)( E It "j'"~js4 ja" 0'gf'jh

't CC II i P jn ic v vr C & ~

t t '

~

j LI+<+ + j.jt f j fl j

V t 't n

I1 t

'pt

~ I t /

jUj>F34 +g jn>1tf g>F/tlA j,"I

": crier%,(j')" it ft n >,'j I/!i~/>)/l,r j /It,f 't',

' rrt Ccc ~

I ~ g, j,tf t,"'I, g n

~ cr 1, I,

fr it IC n it E '.)if tj tt<</ I. PF v)'r,t ~ j n>> 'j j j Ip ter>/' VC/t) t I I

, Ui,t U,

,nr t ji tn/E, V - ~

C' D tti n..

/ C P ,jh'ljt ccct ~

h EE I' tn, l4 ~ II I Ci i'

P. O. B 1000, JUNO BEACH, FL 33408-0420

~ebs~

~JUQY. 2 1 1988 L-88-315 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Inte rated Schedule Monthl Summar Attached is the Summary Report of the Integrated Schedule generated for the month of July, 1988. The schedules discussed in this report reflect information as of the issuance date of June 28, 1988, which includes a new outage completion date for Unit 4 Cycle 12. Updated information will be provided in subsequent reports. The changes to the schedules discussed in this summary have been reviewed with members of the NRC Staff in accordance with the Integrated Schedule Plan. FPL will issue the next 6-month Integrated Schedule Report following the November 1988 schedule.

Very truly yours, W. . Con ay Senior Vice President-Nuclear WFC/RG/gp Attachment cc: Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point .Plant RGISM.JUL 8072>

8807260417 85000250 ADOCK 0 an FPL Group company t.DR @DC R

a -5

'T h

II g

XNFORMATXON ON NRC MODXFXCATXONS SCHEDULE A ITEMS MOD 14 CONTROL ROOM HABITABILITYHVAC The NRC commitment was met on June 13, 1988 which was within the 45 day LCO. This LCO was a one-time technical specification change to allow tie-in of this HVAC MOD. The status of the MOD will change from COFO to FPL for the completion of the following four system enhancements identified during the installation and testing of this MOD.

These are:

1) Replace one switch from a type that has a spring return to a switch without a spring return. This may prevent a false actuation signal.
2) Replace the type of cable connectors used from a solder to crimp type connector.
3) Provide a method to actuate the trip relay for monthly system testing.
4) Replacement of one radiation monitor cable due to high resistance.

MOD 565 4 RHR INSTALL UPGRADED 10" GLOBE VALVE The NRC commitment date has been extended to the end of the Unit 4 Cycle 13 outage (November 19, 1990) per teleconference with the NRC. This discussion was then documented by letter L-88-306, dated July 22, 1988. This was necessary to accommodate schedule revisions which currently do not support activity completion by the upcoming Unit 4 outage end.

The commitment dates for the following outage conforming order MODs have been rescheduled in accordance with the new Unit 4 Cycle 12 outage completion date of December 31, 1988 MOD 268 4 MSIV OPERATOR BACKUP N2 SYSTEM MOD 335 4 DELETE'CRDM CLR'FANS,AUTOSTART MOD 385 4 S.I. MINX'RECIRC. VALVE REPLACE MOD 428 4 PZR HEATER AC POWER CONTROL MOD 511 C IDENT EXTRANEOUS IA X-CONNECTIONS MOD 513 3 XNSTALL WYE STRAINERS ON XA SYSTEM MOD 576 C EDG AIR START MOTORS UPGRADE MOD 1040 4 PAID QC WD (ARM PRM NCC) I/CTMT MOD 1043 4 SM PP WD FNCT I/C (ARM PRM NCC)

MOD 1045 3 SM PP WD FNCT I/C (ARM PRM NCC)

MOD 1047 4 INSTALL WYE STRAXNERS ON XA SYSTEM MOD 1048 4 REPLACE RPS TEST SELECTOR SWITCH MOD 8966 P4T11.21 U4 SAF ENGR GROUP FXNAL REPORT MOD 8968 P4T11.22 U4 DRAWING FOLLOWUP RGISM.JUL

C f

t b

SCHEDULE B ITEMS MOD 132/1001 C EXISTING ttAtt/<tBit EDG IDLE START/STOP The commitment category has been changed from NRR to FPL based upon a safety analysis that concluded this was a system enhancement and not required by Generic Letter 84-15.

The commitment dates for the following outage NRR or I&E MOD have been rescheduled in accordance with the new Unit 4-Cycle 12 outage completion date of December 31, 1988:

MOD 610 C EDG START >tGii AIR SYSTEM/ADD AIR DRYER MOD 1110 4 MOV FAIL DUE TO IMPROPER SW SET "G" MOD 1253 4 REDUCTION IN 4KV BKR VOLTAGE DROP MOD 1276 C CHANGE MET TOWER DATA TO 15 MINUTE AVERAGE This is a new I&E modification in response to an inspection report (88-1) violation. The commitment date was calculated in accordance with current procedure (schedule finish + 60 days) .