Other: ML15327A213, ML16133A459, ML16133A499, ML17101A697, ML17207A165, ML17256A286, ML18212A032, ML18212A185, NL-16-138, Amendment 18 to License Renewal Application, NL-17-005, Actions Concerning License Renewal Commitments 41 and 42 in Response to LR-ISG-2016-01, Changes to Aging Management Guidance for Various Steam Generator Components., NL-17-019, Amendment to License Renewal Application - Reflecting Shortened License Renewal Terms, NL-17-157, Amendment 19 to License Renewal Application (LRA)
|
MONTHYEARML15344A4362015-12-10010 December 2015 Lr Hearing - (External_Sender) Draft Audit Plan Edits Project stage: Request ML15327A2132015-12-21021 December 2015 Plan for the Regulatory Audit of the Service Water Integrity and Fire Water System Aging Management Programs Pertaining to the Indian Point Nuclear Generating Unit Nos. 2 and 3 LRA Project stage: Other ML15351A2032015-12-30030 December 2015 Summary of Conference Call Held on December 9, 2015, Between the NRC and Entergy Nuclear Operations, Inc. Concerning the Draft Audit Plan for the Service Water Integrity and Fire Water System Aging Management Programs Project stage: Draft Other ML16133A4592016-06-15015 June 2016 Service Water and Fire Water Systems Aging Management Programs Audit Report for the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application Project stage: Other ML16133A4992016-06-21021 June 2016 Summary of Telephone Conference Call Held Between NRC and Entergy Concerning the Indian Point LRA Safety Review Project stage: Other ML16138A1942016-07-25025 July 2016 Request for Additional Information for the Review of License Renewal Application, Set 2016-01 Project stage: RAI ML16208A2772016-07-26026 July 2016 Lr Hearing - RAI Set 2016-01 Project stage: Request NL-16-122, Reply to Request for Additional Information for the Review of License Renewal Application, Set 2016-01 (CAC Nos. MD5407 and MD5408)2016-12-0202 December 2016 Reply to Request for Additional Information for the Review of License Renewal Application, Set 2016-01 (CAC Nos. MD5407 and MD5408) Project stage: Response to RAI NL-16-138, Amendment 18 to License Renewal Application2016-12-15015 December 2016 Amendment 18 to License Renewal Application Project stage: Other NL-17-005, Actions Concerning License Renewal Commitments 41 and 42 in Response to LR-ISG-2016-01, Changes to Aging Management Guidance for Various Steam Generator Components.2017-01-17017 January 2017 Actions Concerning License Renewal Commitments 41 and 42 in Response to LR-ISG-2016-01, Changes to Aging Management Guidance for Various Steam Generator Components. Project stage: Other NL-17-019, Amendment to License Renewal Application - Reflecting Shortened License Renewal Terms2017-02-0808 February 2017 Amendment to License Renewal Application - Reflecting Shortened License Renewal Terms Project stage: Other ML17046A2312017-03-0808 March 2017 Request for Additional Information for the Review of the Indian Point License Renewal - Set 2017-01 Project stage: RAI ML17082A3112017-04-11011 April 2017 Summary of Clarification Call with Entergy Regarding Follow-Up RAIs on ISG-2012-02 Project stage: RAI ML17088A3272017-04-19019 April 2017 Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-02 (CAC Nos. MD5407 and MD5408) Project stage: RAI ML17088A4052017-04-20020 April 2017 Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-3 (CAC Nos. MD5407 and MD5408) Project stage: RAI ML17101A6972017-04-25025 April 2017 License Renewal Clarification Call on Baffle Bolt Rai'S Project stage: Other NL-17-052, Reply to Request for Additional Information for the Review of the License Renewal Application, Set 2017-012017-05-0808 May 2017 Reply to Request for Additional Information for the Review of the License Renewal Application, Set 2017-01 Project stage: Response to RAI NL-17-053, Reply to Request for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-03 (CAC Nos. MD5407 and MD5408)2017-05-18018 May 2017 Reply to Request for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-03 (CAC Nos. MD5407 and MD5408) Project stage: Response to RAI NL-17-060, Reply to Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-02 (CAC Nos. MD5407 and MD5408)2017-05-19019 May 2017 Reply to Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-02 (CAC Nos. MD5407 and MD5408) Project stage: Response to RAI ML17128A3352017-05-23023 May 2017 Summary of Telephone Conference Call Between the NRC and Entergy Concerning RAIs Pertaining to IP2 and IP3 Project stage: RAI NL-17-061, Reply to Requests for Additional Information for the Review of the License Renewal Application RAI Set 2017-042017-05-24024 May 2017 Reply to Requests for Additional Information for the Review of the License Renewal Application RAI Set 2017-04 Project stage: Response to RAI NL-17-069, Reply to Requests for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application RAI Set 2017-05 (CAC Nos. MD5407 and MD5408)2017-06-0808 June 2017 Reply to Requests for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application RAI Set 2017-05 (CAC Nos. MD5407 and MD5408) Project stage: Response to RAI NL-17-074, Supplemental Information Regarding Reply to Request for Additional Information Set 2017-01 for the Review of the License Renewal Application (LRA)2017-06-27027 June 2017 Supplemental Information Regarding Reply to Request for Additional Information Set 2017-01 for the Review of the License Renewal Application (LRA) Project stage: Response to RAI ML17170A2862017-06-27027 June 2017 RAI Set 2017-06 Project stage: RAI ML17160A1652017-06-27027 June 2017 Summary of Telephone Conference Call Held on May 31,2017, Between the NRC and Entergy Nuclear Operations Inc. Concerning Requests for Additional Information Pertaining to the Indian Point, License Renewal Application (TAC Nos. MD5407/MD5408 Project stage: RAI NL-17-084, Reply to Requests for Additional Information for the Review of the License Renewal Application. Re RAI Set 2017-062017-07-27027 July 2017 Reply to Requests for Additional Information for the Review of the License Renewal Application. Re RAI Set 2017-06 Project stage: Response to RAI NL-17-092, Amended Response to Request for Additional Information Question RAI 3.3.2-17-IP3-1 Re License Renewal Application RAI Set 2017-052017-07-27027 July 2017 Amended Response to Request for Additional Information Question RAI 3.3.2-17-IP3-1 Re License Renewal Application RAI Set 2017-05 Project stage: Response to RAI ML17207A1652017-09-0101 September 2017 License Renewal Audit Plan Regarding the Service Water Integrity Program Project stage: Other ML17250A2442017-09-20020 September 2017 Audit Report for IP Swi - Aug 2017 Project stage: Acceptance Review ML17191A4562017-09-20020 September 2017 06/08/2017 Telecon Summary Related to Indian Point License Renewal RAIs Associated with ISG-2016-01 Project stage: RAI ML17180A5032017-09-21021 September 2017 04/19/2017 Summary of Teleconference with Entergy Nuclear Operations, Inc., Concerning Request for Additional Information Pertaining to the Indian Point Unit Nos. 2 and 3 License Renewal Application Project stage: RAI ML17256A2862017-09-25025 September 2017 Summary of Telephone Call on 09/06/17, Between NRC and Entergy Concerning Next Steps from the Site Audit on 08/1-3/17 Project stage: Other NL-17-127, Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA) (CAC Nos. MD5407 and MD5408)2017-11-0808 November 2017 Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA) (CAC Nos. MD5407 and MD5408) Project stage: Supplement NL-17-155, Re-Submittal of Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA)2017-12-14014 December 2017 Re-Submittal of Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA) Project stage: Supplement NL-17-157, Amendment 19 to License Renewal Application (LRA)2017-12-14014 December 2017 Amendment 19 to License Renewal Application (LRA) Project stage: Other NL-17-161, Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Units 2 and 3 License Renewal Application (LRA) (CAC Nos. MD5407 and MD5408)2017-12-21021 December 2017 Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Units 2 and 3 License Renewal Application (LRA) (CAC Nos. MD5407 and MD5408) Project stage: Supplement NL-18-010, Supplemental Information Regarding the Review of the License Renewal Application2018-02-26026 February 2018 Supplemental Information Regarding the Review of the License Renewal Application Project stage: Supplement ML18107A7592018-04-30030 April 2018 NUREG-1437, Suppl. 38, Vol. 5, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 38 Regarding Indian Port Nuclear Generating Unit Nos. 2 and 3 Final. Project stage: Acceptance Review NL-18-030, Supplemental Information Associated with Amendment 19 to the License Renewal Application (LRA)2018-05-0808 May 2018 Supplemental Information Associated with Amendment 19 to the License Renewal Application (LRA) Project stage: Supplement NL-18-044, Supplemental Information Regarding the Review of the License Renewal Application2018-06-25025 June 2018 Supplemental Information Regarding the Review of the License Renewal Application Project stage: Supplement ML18200A3332018-08-0101 August 2018 NUREG-1930, Supp 3, Safety Evaluation Report Related to the License Renewal of Indian Point Nuclear Generating Plant, Units 2 and 3. Project stage: Approval ML18211A4842018-08-0707 August 2018 to NUREG-1930, Safety Evaluation Report Related to the License Renewal of Indian Point Nuclear Generating Plant, Units 2 and 3. Project stage: Approval ML18211A5842018-09-17017 September 2018 Issuance of Renewed Facility Operating License Nos. DPR 26 and DPR-64 for Indian Point Nuclear Generating Unit Nos. 2 and 3 (CAC Nos. MD5407 and MD5408) Project stage: Request ML18212A1882018-09-17017 September 2018 Renewed License Appendix C Project stage: Acceptance Review ML18212A1852018-09-17017 September 2018 Renewed Facility Operating License DPR-26, Technical Specifications, Appendix B Project stage: Other ML18212A1812018-09-17017 September 2018 Renewed Facility Operating License DPR-26, Technical Specifications, Appendix a Project stage: Acceptance Review ML18212A0322018-09-17017 September 2018 Records of Decision for the Indian Point Renewed Licenses Project stage: Other ML18211A5962018-09-17017 September 2018 Transmittal Letter - Issuance of Renewed Facility Operating License Nos. DPR-26 and DPR-64 for Indian Point Nuclear Generating Unit Nos. 2 and 3 (CAC Nos. MD5407 and MD5408) Project stage: Approval ML18211A5782018-09-17017 September 2018 Federal Register Notice - Announcing the Issuance of the Indian Point Renewed Licenses Project stage: Approval ML18213A1142018-09-17017 September 2018 Renewed Facility Operating License Project stage: Other 2017-04-25
[Table View] |
|
---|
Category:Letter type:NL
MONTHYEARNL-21-034, Notification of Expected Date of Transfer of Ownership of Nuclear Units to Holtec Indian Point 2, LLC and Holtec Indian Point 3, LLC; and Notification of Receipt of All Required Regulatory Approvals2021-05-26026 May 2021 Notification of Expected Date of Transfer of Ownership of Nuclear Units to Holtec Indian Point 2, LLC and Holtec Indian Point 3, LLC; and Notification of Receipt of All Required Regulatory Approvals NL-21-039, Response to Request for Additional Information - License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary2021-05-20020 May 2021 Response to Request for Additional Information - License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary NL-21-033, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2021-05-11011 May 2021 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel NL-21-032, Termination of Emergency Response Data System Feed to the U.S. Nuclear Regulatory Commission at Indian Point Energy Center2021-05-11011 May 2021 Termination of Emergency Response Data System Feed to the U.S. Nuclear Regulatory Commission at Indian Point Energy Center NL-21-005, Cancellation of Commitments Related to Beyond-Design-Basis External Events Seismic and Flooding Actions2021-05-11011 May 2021 Cancellation of Commitments Related to Beyond-Design-Basis External Events Seismic and Flooding Actions NL-21-030, Submittal of 2020 Annual Radiological Environmental Operating Report2021-05-0606 May 2021 Submittal of 2020 Annual Radiological Environmental Operating Report NL-21-027, Registration of Spent Fuel Cask Use2021-04-20020 April 2021 Registration of Spent Fuel Cask Use NL-21-021, Registration of Spent Fuel Cask Use2021-04-19019 April 2021 Registration of Spent Fuel Cask Use NL-21-017, Pre-Notice of Disbursement from Decommissioning Trusts2021-04-0808 April 2021 Pre-Notice of Disbursement from Decommissioning Trusts NL-21-010, Submittal of 2020 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report2021-02-17017 February 2021 Submittal of 2020 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report NL-21-006, Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement2021-02-10010 February 2021 Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement NL-21-014, Response to 2nd Round Request for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2021-01-26026 January 2021 Response to 2nd Round Request for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-082, Notice of Planned Transfer of Decommissioning Funds2020-12-14014 December 2020 Notice of Planned Transfer of Decommissioning Funds NL-20-081, Pre-Notice of Disbursement from Decommissioning Trusts2020-12-0909 December 2020 Pre-Notice of Disbursement from Decommissioning Trusts NL-20-080, Report in Accordance with 10 CFR 71.95(a) for Failure to Comply with Certificate of Compliance No. 71-93212020-11-19019 November 2020 Report in Accordance with 10 CFR 71.95(a) for Failure to Comply with Certificate of Compliance No. 71-9321 NL-20-079, (IP2 and IP3) - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-12012 November 2020 (IP2 and IP3) - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NL-20-077, Submittal of Quality Assurance Program Manual Revision 22020-11-0909 November 2020 Submittal of Quality Assurance Program Manual Revision 2 NL-20-078, Response to Requests for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-11-0909 November 2020 Response to Requests for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-076, Revision of Commitment Related to Nuclear Reactor Safeguards Interim Compensatory Measure - Section B.5.b Issue Regarding Spent Fuel Dispersal2020-11-0202 November 2020 Revision of Commitment Related to Nuclear Reactor Safeguards Interim Compensatory Measure - Section B.5.b Issue Regarding Spent Fuel Dispersal NL-20-069, One-time Scheduler Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency2020-10-0808 October 2020 One-time Scheduler Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency NL-20-070, Response to Requests for Additional Information, License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-10-0202 October 2020 Response to Requests for Additional Information, License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-067, Redacted Version of Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-09-16016 September 2020 Redacted Version of Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-064, 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments2020-09-0101 September 2020 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments NL-20-060, Status of Remaining Actions for Generic Letter 2004-022020-08-11011 August 2020 Status of Remaining Actions for Generic Letter 2004-02 NL-20-057, Cancellation of Commitment Related to Large Break LOCA Reanalysis2020-07-30030 July 2020 Cancellation of Commitment Related to Large Break LOCA Reanalysis NL-20-0851, 30-Day 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material2020-07-22022 July 2020 30-Day 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material NL-20-051, Submittal of Quality Assurance Program Manual, Revision 1 for the Indian Point Energy Center2020-07-0707 July 2020 Submittal of Quality Assurance Program Manual, Revision 1 for the Indian Point Energy Center NL-20-052, Unsatisfactory 10 CFR 26 Fitness-For-Duty Blind Performance Testing Results2020-07-0707 July 2020 Unsatisfactory 10 CFR 26 Fitness-For-Duty Blind Performance Testing Results NL-20-012, Application to Revise Provisional Operating License and Technical Specifications2020-06-30030 June 2020 Application to Revise Provisional Operating License and Technical Specifications NL-20-050, Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-06-24024 June 2020 Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-041, Registration of Unit 3 Spent Fuel Cask Use2020-05-13013 May 2020 Registration of Unit 3 Spent Fuel Cask Use NL-20-042, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2020-05-12012 May 2020 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel NL-20-033, Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2020-04-28028 April 2020 Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-20-038, Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-04-23023 April 2020 Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-035, Response to Request for Additional Information - Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic2020-04-16016 April 2020 Response to Request for Additional Information - Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic NL-20-034, Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic2020-04-13013 April 2020 Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic NL-20-021, Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-03-24024 March 2020 Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-020, Submittal of 2019 Annual Fitness for Duty Performance Data Report Update2020-02-26026 February 2020 Submittal of 2019 Annual Fitness for Duty Performance Data Report Update NL-20-015, Submittal of 2019 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report2020-02-10010 February 2020 Submittal of 2019 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report NL-20-008, Transmittal of Presentation Slides for Partially Closed Pre-Submittal Meeting to Discuss a Planned License Amendment Request to Replace the Fuel Handling Building Crane2020-01-0606 January 2020 Transmittal of Presentation Slides for Partially Closed Pre-Submittal Meeting to Discuss a Planned License Amendment Request to Replace the Fuel Handling Building Crane NL-19-094, 2018 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report2019-12-16016 December 2019 2018 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report NL-19-084, Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments2019-11-21021 November 2019 Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments NL-19-093, Proposed Technical Specifications (TS) Changes - Indian Point Nuclear Generating Unit 3 TS SR 3.7.7.2 and TS 3.7.6, Required Action A.12019-11-21021 November 2019 Proposed Technical Specifications (TS) Changes - Indian Point Nuclear Generating Unit 3 TS SR 3.7.7.2 and TS 3.7.6, Required Action A.1 NL-19-092, Request for Rescission of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2019-11-20020 November 2019 Request for Rescission of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) NL-19-043, Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.122019-10-22022 October 2019 Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.12 NL-19-073, Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2019-10-22022 October 2019 Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) NL-19-078, Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2019-10-22022 October 2019 Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-19-091, Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Cask Use2019-10-17017 October 2019 Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Cask Use NL-19-090, Registration of Unit 2 Spent Fuel Cask Use2019-10-0909 October 2019 Registration of Unit 2 Spent Fuel Cask Use NL-19-079, 50.59(d)(2) Summary Report of Changes, Tests and Experiments2019-09-26026 September 2019 50.59(d)(2) Summary Report of Changes, Tests and Experiments 2021-05-06
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARML23192A1002023-07-11011 July 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan and Emergency Action Level Scheme ML23103A2732023-04-25025 April 2023 Enclosuresponses to Q&A ML22308A2572022-11-0404 November 2022 Decommissioning International - Response to Request for Additional Information for the Proposed Amended IP2 Master Trust Agreement ML22132A1692022-05-12012 May 2022 Response to Requests for Additional Information Related to Exemption Request and License Amendment Request to Revise the Facility'S Emergency Plan ML22034A6032022-02-0303 February 2022 Response to Request for Additional Information - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E for Low-level Radioactive Waste Shipments ML22034A7882022-02-0303 February 2022 Response to Requests for Additional Information - Related to Post Shutdown Decommissioning Activities Report ML22003A1932022-01-0303 January 2022 Response to Requests for Additional Information - License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-21-039, Response to Request for Additional Information - License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary2021-05-20020 May 2021 Response to Request for Additional Information - License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary CNRO-2021-00002, Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-01-28028 January 2021 Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L NL-21-014, Response to 2nd Round Request for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2021-01-26026 January 2021 Response to 2nd Round Request for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-078, Response to Requests for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-11-0909 November 2020 Response to Requests for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-070, Response to Requests for Additional Information, License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-10-0202 October 2020 Response to Requests for Additional Information, License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device ML20220A6662020-08-0707 August 2020 Responses to NRC Requests for Additional Information (RAI) Re the Request for Indian Point Nuclear Generating Station Units 1, 2 & 3 NL-20-050, Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-06-24024 June 2020 Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline ML20122A1222020-05-27027 May 2020 Letter from Margaret M. Doane to Mr. Lemuel Srolovic, Chief, Environmental Protection Bureau, Office of the Ny Attorney General: Response to Office of Ny Attorney General Regarding Natural Gas Transmission Pipelines Near Indian Point Power ML20122A1052020-05-27027 May 2020 Letter from Margaret M. Doane to John B. Rhodes, Chair and Executive Officer, Ny State Public Service Commission: Response to Ny State Public Service Commission Regarding Natural Gas Transmission Pipelines Near Indian Point Nuclear Power Pl NL-20-035, Response to Request for Additional Information - Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic2020-04-16016 April 2020 Response to Request for Additional Information - Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic CNRO-2019-00030, Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary2019-12-30030 December 2019 Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary NL-19-023, Response to Request for Additional Information (RAI) - Proposed License Amendment Request Regarding Storage of Fresh and Spent Nuclear Fuel in the Spent Fuel Pool2019-06-0606 June 2019 Response to Request for Additional Information (RAI) - Proposed License Amendment Request Regarding Storage of Fresh and Spent Nuclear Fuel in the Spent Fuel Pool NL-18-045, IP3 ILRT RAI Responses2018-07-0303 July 2018 IP3 ILRT RAI Responses NL-18-045, Indian Point Nuclear Generating Unit 3 - Response to Request for Additional Information for Acceptance of License Amendment Request (LAR) for One-Time Extension of the Containment Type a Leak Rate Testing Frequency from 15 to 16 Years2018-07-0303 July 2018 Indian Point Nuclear Generating Unit 3 - Response to Request for Additional Information for Acceptance of License Amendment Request (LAR) for One-Time Extension of the Containment Type a Leak Rate Testing Frequency from 15 to 16 Years ML18193A4512018-07-0303 July 2018 Response to Request for Additional Information for Acceptance of License Amendment Request (LAR) for One-Time Extension of the Containment Type a Leak Rate Testing Frequency from 15 to 16 Years CNRO-2018-00021, Response to Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in the Spent Fuel Pools for Indian Point Energy Center, Unit 3 and Waterford 3 Steam Electric Station2018-05-30030 May 2018 Response to Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in the Spent Fuel Pools for Indian Point Energy Center, Unit 3 and Waterford 3 Steam Electric Station NL-17-161, Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Units 2 and 3 License Renewal Application (LRA) (CAC Nos. MD5407 and MD5408)2017-12-21021 December 2017 Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Units 2 and 3 License Renewal Application (LRA) (CAC Nos. MD5407 and MD5408) NL-17-127, Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA) (CAC Nos. MD5407 and MD5408)2017-11-0808 November 2017 Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA) (CAC Nos. MD5407 and MD5408) NL-17-142, Response to Request for Additional Information Regarding Request IP2-ISI-RR-20 for Relief from Examinations of Code Class 1 Component Welds with Less than Essentially 100% Coverage for Fourth Ten-Year Inservice Inspection..2017-11-0101 November 2017 Response to Request for Additional Information Regarding Request IP2-ISI-RR-20 for Relief from Examinations of Code Class 1 Component Welds with Less than Essentially 100% Coverage for Fourth Ten-Year Inservice Inspection.. ML17300A1742017-10-27027 October 2017 10/27/17 E-mail from M. Mirzai to R. Guzman Inter-Unit Transfer of Spent Fuel LAR - Updated Clarification Response Following Teleconference on October 19, 2017 ML17298B6472017-10-25025 October 2017 10/25/17 E-mail from M. Mirzai to R. Guzman Inter-Unit Transfer of Spent Fuel LAR - Clarification Response Following Teleconference on October 19, 2017 NL-17-115, Response to Request for Additional Information Re Inter-Unit Transfer of Spent Fuel, Attachments 1, 2, 3 (non-proprietary Version of Report HI-2094289, Rev. 9) and 7 Enclosed2017-10-0202 October 2017 Response to Request for Additional Information Re Inter-Unit Transfer of Spent Fuel, Attachments 1, 2, 3 (non-proprietary Version of Report HI-2094289, Rev. 9) and 7 Enclosed NL-17-109, Request for Additional Information for Proposed License Amendment Regarding the Connection of Non-Seismic Boric Acid Recovery System to the Refueling Water Storage Tank Entergy Nuclear Operations, Inc. Indian Point Nuclear Generating, Unit2017-08-17017 August 2017 Request for Additional Information for Proposed License Amendment Regarding the Connection of Non-Seismic Boric Acid Recovery System to the Refueling Water Storage Tank Entergy Nuclear Operations, Inc. Indian Point Nuclear Generating, Unit NL-17-102, Response to Request for Additional Information Regarding Inter-Unit Transfer of Spent Fuel2017-08-16016 August 2017 Response to Request for Additional Information Regarding Inter-Unit Transfer of Spent Fuel NL-17-092, Amended Response to Request for Additional Information Question RAI 3.3.2-17-IP3-1 Re License Renewal Application RAI Set 2017-052017-07-27027 July 2017 Amended Response to Request for Additional Information Question RAI 3.3.2-17-IP3-1 Re License Renewal Application RAI Set 2017-05 NL-17-084, Reply to Requests for Additional Information for the Review of the License Renewal Application. Re RAI Set 2017-062017-07-27027 July 2017 Reply to Requests for Additional Information for the Review of the License Renewal Application. Re RAI Set 2017-06 NL-17-074, Supplemental Information Regarding Reply to Request for Additional Information Set 2017-01 for the Review of the License Renewal Application (LRA)2017-06-27027 June 2017 Supplemental Information Regarding Reply to Request for Additional Information Set 2017-01 for the Review of the License Renewal Application (LRA) NL-17-069, Reply to Requests for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application RAI Set 2017-05 (CAC Nos. MD5407 and MD5408)2017-06-0808 June 2017 Reply to Requests for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application RAI Set 2017-05 (CAC Nos. MD5407 and MD5408) NL-17-070, Additional Information for the Review of the Plants License Renewal Application (LRA) Regarding the Containment Leak Rate Program2017-05-31031 May 2017 Additional Information for the Review of the Plants License Renewal Application (LRA) Regarding the Containment Leak Rate Program NL-17-061, Reply to Requests for Additional Information for the Review of the License Renewal Application RAI Set 2017-042017-05-24024 May 2017 Reply to Requests for Additional Information for the Review of the License Renewal Application RAI Set 2017-04 NL-17-060, Reply to Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-02 (CAC Nos. MD5407 and MD5408)2017-05-19019 May 2017 Reply to Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-02 (CAC Nos. MD5407 and MD5408) NL-17-053, Reply to Request for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-03 (CAC Nos. MD5407 and MD5408)2017-05-18018 May 2017 Reply to Request for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-03 (CAC Nos. MD5407 and MD5408) NL-17-052, Reply to Request for Additional Information for the Review of the License Renewal Application, Set 2017-012017-05-0808 May 2017 Reply to Request for Additional Information for the Review of the License Renewal Application, Set 2017-01 NL-17-044, Response to Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Amendment of Inter-Unit Transfer of Spent Fuel2017-04-19019 April 2017 Response to Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Amendment of Inter-Unit Transfer of Spent Fuel NL-17-039, Updated Response to Request for Additional Information for the Review of License Renewal Application Environmental Review-Severe Accident Mitigation Alternatives Based on a Reduced Renewal Period2017-03-31031 March 2017 Updated Response to Request for Additional Information for the Review of License Renewal Application Environmental Review-Severe Accident Mitigation Alternatives Based on a Reduced Renewal Period ML17096A2122017-03-23023 March 2017 Entergy Engineering Report No. IP-RPT-16-00078, Indian Point RAI CLI-16-07 SAMA Cost-Benefit Sensitivities Rev. 1 (March 23, 2017) NL-17-002, Response to Request for Additional Information for Review of the License Renewal Application Environmental Review - Severe Accident Mitigation Alternatives2017-02-0101 February 2017 Response to Request for Additional Information for Review of the License Renewal Application Environmental Review - Severe Accident Mitigation Alternatives NL-17-013, Response to Request for Additional Information Regarding Relief Request IP3-ISl-RR-09, Alternative to the Depth Sizing Qualification Requirement2017-01-26026 January 2017 Response to Request for Additional Information Regarding Relief Request IP3-ISl-RR-09, Alternative to the Depth Sizing Qualification Requirement NL-17-005, Actions Concerning License Renewal Commitments 41 and 42 in Response to LR-ISG-2016-01, Changes to Aging Management Guidance for Various Steam Generator Components.2017-01-17017 January 2017 Actions Concerning License Renewal Commitments 41 and 42 in Response to LR-ISG-2016-01, Changes to Aging Management Guidance for Various Steam Generator Components. NL-17-002, Indian Point Nuclear Generating, Units 2 and 3, IP-RPT-16-00077, RAI CLI-16-07 MACCS2 Sensitivities, Rev. 0 (Jan. 4, 2017)2017-01-0404 January 2017 Indian Point Nuclear Generating, Units 2 and 3, IP-RPT-16-00077, RAI CLI-16-07 MACCS2 Sensitivities, Rev. 0 (Jan. 4, 2017) ML17096A2112017-01-0404 January 2017 Entergy Engineering Report No. IP-RPT-16-00077, Indian Point RAI CLI-16-07 MACCS2 Sensitivities, Rev. 0 (Jan 4, 2017) ML17040A4352017-01-0404 January 2017 IP-RPT-16-00078, RAI CLI-16-07 SAMA Cost-Benefit Sensitivities, Rev. 0 (Jan. 4, 2017) ML17040A4342017-01-0404 January 2017 IP-RPT-16-00077, RAI CLI-16-07 MACCS2 Sensitivities, Rev. 0 (Jan. 4, 2017) 2023-07-11
[Table view] |
Text
- =-=* Entergx Entergy Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB P.O. Box249 Buchanan, NY 10511-0249 Tel (914) 254 6700 Anthony J Vitale Site Vice President NL-17-061 May 24, 2017 U.S. Nuclear Regulatory Commission Document Control Desk 11545 Rockville Pike, TWFN-2 F1 Rockville, MD 20852-2738
SUBJECT:
Reply to Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI SET 2017-04 (CAC Nos. MD5407 and MD5408)
Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64
REFERENCES:
- 1) NRG letter dated April 25, 2017, "Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI SET 2017-04 (CAC Nos. MD5407 and MD5408)," (ML17103A418)
Dear Sir or Madam:
Entergy Nuclear Operations, Inc. (Entergy) is providing in Attachment 1, the additional information requested by the U.S. Nuclear Regulatory Commission (NRG) pertaining to the review of the License Renewal Application (LRA) for Indian Point Energy Center (IPEC) Unit Nos. 2 and 3 (Reference 1).
Revised Section 6.2 of the Reactor Vessel Internals (RVI) Inspection Plan is provided in .
If you have any questions, or require additional information, please contact Mr. Robert Walpole at 914-254-6710.
I declare under penalty of perjury that the foregoing is true and correct. Executed on MrJ.y JL/ , 2011.
Sincerely,
)
AJV/gd
NL-17-061 Docket Nos. 50-247 and 50-286 Page 2 of 2 Attachments:
- 1. Reply to NRC Request for Additional Information Regarding the License Renewal Application
- 2. Revised Section 6.2, Reactor Vessel Internals (RVI) Inspection Plan cc: Mr. Daniel H. Dorman, Regional Administrator, NRC Region I Mr. Sherwin E. Turk, NRC Office of General Counsel, Special Counsel Mr. William Burton, NRC Senior Project Manager, Division of License Renewal Mr. Richard V. Guzman, NRR Senior Project Manager Ms. Bridget Frymire, New York State DepartrtJent of Public Service Mr. John B. Rhodes, President and CEO NYSERDA NRC Resident Inspector's Office
ATTACHMENT 1 to NL-17-061 REPLY TO NRC REQUEST FOR ADDITIONAL INFORMATION REGARDING THE LICENSE RENEWAL APPLICATION ENTERGY NUCLEAR OPERATIONS, INC.
INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 & 3 DOCKET NOS. 50-247 AND 50-286
NL-17-061 Attachment 1 Page 1 of 4 Section 54.21 (a)(3) of Title 10 of the Code of Federal Regulations (1 O CFR) requires the applicant to demonstrate that the effects of aging for structures and components will be adequately managed so that the intended function(s) will be maintained consistent with the current licensing basis for the period of extended operation. As described in the SRP-LR, an applicant may demonstrate compliance with 10 CFR 54.21 (a)(3) by referencing the GALL Report and when evaluation of the matter in the GALL Report applies to the plant.
RAI 3.0.3.3.9-1 Section 6.2 of the revised Reactor Vessel Internals (RVI) Inspection Plan for Indian Point, Unit Nos. 2 and 3 (IP2 and IP3) lists five specific actions to be taken with regard to baffle-former bolts (BFBs). The third and fourth item state:
- 3. Entergy will also perform general visual inspection to identify anomalies in the baffle structure at IP2 and IP3 during each subsequent refueling outage.
- 4. Entergy will perform an ultrasonic test (UT) inspection of inservice replaced (new) bolts if the general visual inspections performed in accordance with paragraph 3, above identify degraded new bolts.
For replacement BFBs, based on Items 3 and 4, UT examination will not be performed during future refueling outages unless a general visual examination of the baffle structure reveals anomalies. The staff is concerned because the applicant did not provide sufficient detail about these general visual examinations for the staff to determine whether the visual examinations would be capable of detecting degraded replacement BFBs. The applicant also did not specify the timing for the UT examination of replacement bolts if the visual examination reveals degraded replacement BFBs. The staff therefore requests the following information:
RAI 3.0.3.3.9-1. Request a Describe the examination coverage and method (e.g. VT-1, VT-3) of the general visual inspection of the baffle structure discussed in Item 3.
Response
Entergy will perform a VT-3 of the baffle assembly, including the baffle plates, the edge bolts and the replacement baffle former bolts during each subsequent refueling outage.
RAI 3.0.3.3.9-1. Request b Clarify what is meant by "anomalies." What conditions observed during the visual examination would trigger a UT examination of replacement BFBs?
NL-17-061 Attachment 1 Page 2 of 4
Response
The VT-3 examination discussed in the response to RAI 3.0.3.3.9-1, Request a will be capable of detecting baffle bolt anomalies similar to those previously detected at other Westinghouse four-loop downflow plants (i.e. Tier 1a plants as defined in Westinghouse NSAL 16-1). Examples of baffle bolt anomalies include missing or protruding bolt heads, missing or protruding lock bars, cracked lock bar welds, or other signs of bolt damage or unthreading. For the replacement baffle former bolts, the anomalies include deformed, protruding or cracked locking cups, damaged, protruding or cracked bolt heads and/or other signs of bolt unthreading. Identification of these anomalies on the replacement baffle bolts would trigger a UT examination of the replacement bolts during the same refueling outage.
RAI 3.0.3.3.9-1. Request c Justify that the general visual inspection will be capable of detecting any and all visually degraded replacement BFBs.
Response
The general vis,Ual inspection is intended to identify the baffle assembly anomalies described above. The general visual inspection is not intended to identify cracking located below the replacement bolt head. UT inspections performed every 10 years will be capable of detecting bolt cracking below the head. A 10-year UT inspection interval is appropriate for the replacement bolts based on the aging management program specified in the EPRI Technical Report MRP-227-A, "Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines" (MRP). Baffle bolt degradation is caused primarily by neutron fluence accrued.during plant operation. MRP-227-A and the corresponding MRP baffle bolt interim guidance specify the first baffle bolt inspection between 25 and 35 EFPY and subsequent re-inspections at a frequency based on a plant-specific evaluation of at least once per 10 years. Although neither the MRP-227-A nor the MRP interim guidance provide re-inspection frequencies for new replacement baffle bolts, adopting a UT inspection interval not to exceed 10 years for new replacement bolts is
- conservative because of the improved features of the replacement bolts and the fact that they have not been exposed to sufficient neutron fluence to cause significant radiation damage. If the MRP under NEI 03-08 issues. re-inspection guidance for replacement bolts,
- Entergy will apply that new MRP guidance for re-inspection of IP2 and IP3 replacement bolts.
RAI 3.0.3.3.9-1. Request d If the general visual examination reveals degraded replacement BFBs, when will the UT examination of the replacement bolts be performed? Justify the timing of this examination, if not performed during the same refueling outage as the discovery of the degraded replacement BFBs.
NL-17-061 Attachment 1 Page 3 of 4
Response
Entergy will perform volumetric examination of the replacement bolts during the same refueling outage in which the general visual inspection identifies degraded replacement bolts.
RAI 3.0.3.3.9-2 Operating experience from D.C. Cook, Unit 2, during Fall, 2016 suggests that replacement BFBs and baffle-edge bolts may be susceptible to degradation if a large number of clustered original degraded bolts are present near the replacement bolts.
The staff therefore requests the following information:
If clustering of degraded original BFBs is found at IP2 or IP3 during future refueling outages:
RAI 3.0.3.3.9-2. Request a Will UT examination be performed on replacement BFBs installed during previous outages? If so, describe the scope and schedule of these examinations.
Response
The operating experience (OE) from other Tier 1a plants indicates that if clusters of failed original bolts are not replaced in a timely manner they could result in failure of adjacent replacement bolts after several cycles of operation. Because both IP2 and IP3 have performed a 100% UT examination of all original bolts and have replaced all degraded bolts plus additional re-enforcing bolts, Entergy does not believe that the above referenced OE directly applies to IP2 or IP3. If clusters of failed original bolts are observed during future examinations, Entergy procedures require entering the condition into the Indian Point Corrective Action Program. An evaluation would determine if UT examination of the adjacent replacement bolts is warranted. If this evaluation indicates that the clusters could have resulted in damage to replacement bolts (i.e. an overstress condition), then a UT examination of the replacement bolts will be performed during the same refueling outage.
Additionally, if the MRP under NEI 03-08 issues new guidance addressing the impact of clusters of failed original bolts on replacement bolts, then Entergy will apply that new MRP guidance. ,
RAI 3.0.3.3.9-2. Request b Will baffle-edge bolts be examined? If so, describe the method, scope and schedule of these
NL-17-061 Attachment 1 Page 4 of 4
Response
As described in the response to RAI 3.0.3.3.9-1, Request a, the edge bolts will be examined during the general visual inspection of the baffle assembly during each future refueling outage. If degraded edge bolts are identified, the .Indian Point Corrective Action Program requires that they be evaluated to determine if any corrective actions are necessary prior to returning them to service. Because edge bolts are not credited in the structural analyses of the baffle assembly, a volumetric examination of the edge bolts is not necessary. If the MRP under NEI 03-08 issues guidance addressing edge bolts, then Entergy will apply the MRP guidance for the IP2 and IP3 edge bolts.
RAI 3.0.3.3.9-2. Request c If the UT examination of replacement BFBs and examination of edge bolts will not be performed if clustered degraded original bolts are found, justify not performing these examinations.
Response
As described in the response to RAI 3.0.3.3.9-2, Request a, if clusters of degraded original bolts are found adjacent to replacement bolts and there is no visual evidence of degraded replacement bolts, Entergy will evaluate the potential impact of the failed bolts on the adjacent replacement bolts. if this evaluation concludes that the failed bolts could have resulted in damage (i.e. an overstress condition) to adjacent replacement bolts, then a UT examination will be performed on the replacement bolts. As stated above, because edge bolts are not credited in the structural analysis of the baffle assembly, a volumetric examination of the edge bolts is not necessary. Additionally, if the MRP under NEI 03-08 issues guidance addressing this condition, Entergy will apply the guidance for IP2 and IP3.
Summarv
- shows the revisions to the five specific actions related to baffle-former bolts identified in Section 6.2 of the revised Reactor Vessel Internals (RVI) Inspection Plan for IP2 and IP3.
ATTACHMENT 2 to NL-17-061 REVISED SECTION 6.2 REACTOR VESSEL INTERNALS (RVI) INSPECTION PLAN Changes are shown as strikethroughs for deletions and underlines for additions ENTERGY NUCLEAR OPERATIONS, INC.
INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 & 3 DOCKET NOS. 50-247 AND 50-286 I
NL-17-061 Attachment 2 Page 1 of 2 6.0 OPERATINGON EXPERIENCE AND ADDITIONAL CONSIDERATIONS 6.1 Internal and External Operating Experience Operating experience related to degradation of reactor internal components covered in this program will be reviewed on a periodic basis. This review will include both domestic and international experience and will be documented in accordance with the Entergy operating experience process. Worldwide operating experience through 2009 is summarized in Reference 5. Results of reactor internal components inspected in accordance with MRP-227 will be summarized in the biannual MRP Inspection Data Survey, MRP-219 [7].
6.2 Spring 2016 Operating Experience In the spring of 2016, during IP2 outage 2R22, ultrasonic (UT) and/or visual inspections of all 832 baffle former bolts (bolts) were performed in accordance with the NRC approved guidelines in MRP-227-A. Visual inspection of the baffle plates and bolts identified 31 degraded bolts. The UT inspections identified indications on 182 bolts and also determined that 14 bolt locations were not testable. The locations that were not testable were conservatively assumed to possess bolts that failed to meet the acceptance criteria. As a result of the inspection findings, all 227 bolts (31+182+14) with actual and assumed indications were replaced. An additional 51 bolts were replaced to reduce the probability of future failures as well as minimize the probability of clusters of failed bolts. Therefore, during 2R22, a total of 278 bolts (227+51) were replaced.
As a result of the IP2 inspection findings and other industry Operating Experience (OE) indicating a significant number of failed bolts at other similarly-designed PWR plants, the IPEC PWR Vessel Internals Program is being revised. In view of the 2R22 inspection findings, Entergy arranged for the fractographic examination of eight baffle former bolts removed from the IP2 baffle structure during the Spring 2016 outage at Westinghouse Electric Company's hot cell laboratory in Churchill, PA. The results of those fractographic examinations are documented in Westinghouse Report MCOE-TR-16-18, Revision 0, "Fractography of Indian Point Unit 2 Baffle Former Bolts" (Nov. 30, 2016).
Industry-sponsored metallurgical analysis and materials property testing of additional baffle former bolt specimens from IP2 and other PWRs is still in progress.
Based on as-found conditions and current industry knowledge, including the results of the fractographic examinations of the eight IP2 baffle former bolts discussed in Westinghouse Report MCOE-TR-16-18, IPEC concludes that performing a volurrietric examination (i.e., UT) of the required original bolts during each refueling outage, and replacing those bolts found to be degraded until none of the remaining original bolts is required to be credited for the baffle structure to be capable of performing its intended safety function, is a reasonable and acceptable approach. Accordingly, IPEC plans to take the actions specified in paragraphs 1-5 below. These actions are subject to possible revision per the OE program based on the results of ongoing and planned future testing of baffle former bolt specimens from IP2 and other PWR plants. Any findings that result from the following actions will be input to the Corrective Action Program.
NL-17-061 Attachment 2 Page 2 of 2
- 1. The IP3 baffle bolt inspections that were previously scheduled to be performed in 3R20 (Spring 2019) will be performed in 3R19 (Spring 2017). Visual and UT inspections on 100% of all accessible baffle former bolts, and a visual inspection of the baffle-edge bolts and baffle former assembly, will be performed in 3R19.
- 2. Entergy will perform a UT inspection of 100% of the original bolts at IP2 and IP3 during each of the subsequent refueling outages if any of the original bolts are required to remain structurally capable of carrying their design load to ensure structural integrity of the baffle structure during all design conditions.
- 3. Entergy will also perform a general visual inspection (VT-3) to identify anomalies in of the baffle structure at IP2 and IP3 during each subsequent refueling outage. The inspection will cover the baffle plates. the edge bolts and the replaced baffle former bolts. For the edge bolts. the inspection will be capable of detecting missing or protruding bolt heads. missing or protruding lock bars. cracked lock bar welds. or other signs of bolt damage or unthreading. For the replacement baffle former bolts. the inspection will be capable of identifying deformed. protruding or cracked locking cups.
damaged. protruding or cracked bolt heads and other signs of bolt damage or unthreading.
- 4. Entergy will perform a UT inspection of inservice replaced (new) bolts during the same refueling outage if the general visual inspections performed in accordance with paragraph 3 above identify degraded ReW replaced bolts.
- 5. If clusters of failed original bolts are observed during future examinations. an evaluation will determine if UT examination of the adjacent replacement bolts is warranted. If this evaluation indicates that the clusters could have resulted in damage to replacement bolts (i.e. an overstress condition). then Entergy will perform a UT examination of the replacement bolts during the same refueling outage.
§. Entergy will replace all bolts with indications that are needed to remain structurally capable of carrying their design load to ensure structural integrity of the baffle structure during all design conditions. Additional "good" or anti-cluster bolts will also be replaced to ensure that sufficient margin is maintained to accommodate the same failure rate until the next inspection as the failure rate identified during the current refueling outage. This margin will ensure compliance with the intent of the guidelines provided in WCAP-17096, Revision 2, "Reactor Internals Acceptance Criteria Methodology and Data Requirements."
NL-17-061 Attachment 1 Page 4 of 4
Response
!
As described in the response to RAI 3.0.3.3.9-1, Request a, the edge bolts will be examined during the general visual inspection of the baffle assembly during each future refueling outage. If degraded edge bolts are identified, the Indian Point Corrective Action Program requires that they be evaluated to determine if any corrective actions are necessary prior to returning them to service. Because edge bolts are not credited in the structural analyses of the baffle assembly, a volumetric examination of the edge bolts is not necessary. If the MRP under NEI 03-08 issues guidance addressing edge bolts, then Entergy will apply the MRP guidance for the IP2 and IP3 edge bolts.
RAI 3.0.3.3.9-2. Request c If the UT examination of replacement BFBs and examination of edge bolts will not be performed if clustered degraded original bolts are found, justify not performing these examinations.
Response
As described in the response to RAI 3.0.3.3.9-2, Request a, if clusters of degraded original bolts are found adjacent to replacement bolts and there is no visual evidence of degraded replacement bolts, Entergy will evaluate the potential impact of the failed bolts on the adjacent replacement bolts. If this evaluation concludes that the failed bolts could have resulted in damage (i.e. an overstress condition) to adjacent replacement bolts, then a UT examination will be performed on the replacement bolts. As stated above, because edge bolts are not credited in the structural analysis of the baffle assembly, a volumetric examination of the edge bolts is not necessary. Additionally, if the MRP under NEI 03-08 issues guidance addressing this condition, Entergy will apply the guidance for IP2 and IP3.
Summary shows the revisions to the five specific actions related to baffle-former bolts identified in Section 6.2 of the revised Reactor Vessel Internals (RVI) Inspection Plan for IP2 and IP3.