ML16244A126

From kanterella
Jump to navigation Jump to search
Mid-Cycle Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Report 05000280,281/2016005
ML16244A126
Person / Time
Site: Surry  Dominion icon.png
Issue date: 08/31/2016
From: Steven Rose
Division Reactor Projects II
To: Heacock D
Virginia Electric & Power Co (VEPCO)
References
IR 2016005
Download: ML16244A126 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 August 31, 2016 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Dominion Nuclear Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - NRC INSPECTION REPORT 05000280, 281/2016005

Dear Mr. Heacock:

On August 10, 2016, the Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Surry Power Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015, through June 30, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Surry Power Station, Units 1 and 2, were operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined that the performance at Surry Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection schedule of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

Additionally, the NRC plans on conducting non-ROP baseline inspections which include two Operating License Initial Examinations and Temporary Instruction 2515/191, Revision 1, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans.

D. Heacock 2 The NRC staff received the Surry Power Station, Units 1 and 2, Final Compliance letter for Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The NRC staff issued the Surry Power Station, Units 1 and 2, Safety Evaluation on August 4, 2016, and will confirm full implementation of the orders mentioned above by performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.

In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, Operating Reactor Assessment Program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4609 with any questions you may have regarding this letter.

Sincerely,

/RA/

Steven D. Rose, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37

Enclosure:

Surry Inspection / Activity Plan (09/01/2016 - 06/30/2018) cc Distribution via ListServ

ML16244A126 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE BDB2 SON via email SDR2 NAME BBishop SNinh SRose DATE 8/30/2016 8/30/2016 8/30/2016 E-MAIL COPY? YES NO YES NO YES NO D. Heacock 2 Letter to David A Heacock from Steven D. Rose dated August 31, 2016

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - NRC INSPECTION REPORT 05000280, 281/2016005 DISTRIBUTION:

D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSurry Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 3 Surry 08/31/2016 07:01:09 Inspection / Activity Plan Report 22 09/01/2016 - 06/30/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL EXAM - INITIAL LICENSE EXAM 3 1 09/19/2016 09/30/2016 V23477 SURRY SEPTEMBER 2016 INITIAL EXAM AT POWER FACILITIES ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 10/24/2016 10/28/2016 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL INSPECTION WEEK 1 2 1, 2 10/31/2016 11/04/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/31/2016 11/04/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 10/31/2016 11/04/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/31/2016 11/04/2016 IP 71124.04 Occupational Dose Assessment 1, 2 10/31/2016 11/04/2016 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 10/31/2016 11/04/2016 IP 71151 Performance Indicator Verification SGISI - UNIT 1 SG IN-SERVICE INSPECTION 1 1 10/31/2016 11/04/2016 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL INSPECTION WEEK 2 3 1, 2 11/28/2016 12/02/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 11/28/2016 12/02/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 11/28/2016 12/02/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 11/28/2016 12/02/2016 IP 71124.04 Occupational Dose Assessment 1, 2 11/28/2016 12/02/2016 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 11/28/2016 12/02/2016 IP 71151 Performance Indicator Verification OL RQ - REQUAL INSPECTION 2 1, 2 01/23/2017 01/27/2017 IP 7111111B Licensed Operator Requalification Program PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2 01/30/2017 02/03/2017 IP 71152B Problem Identification and Resolution 1, 2 02/13/2017 02/17/2017 IP 71152B Problem Identification and Resolution TI-191 - MITIGATING STRATEGIES 4 1, 2 03/13/2017 03/17/2017 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 ISI - UNIT 2 IN-SERVICE INSPECTION & RVH EXAM 1 2 05/15/2017 05/19/2017 IP 7111108P Inservice Inspection Activities - PWR RP - RAD HAZARDS AND TRANSPORTATION 2 1, 2 05/15/2017 05/19/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 05/15/2017 05/19/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 3 Surry 08/31/2016 07:01:09 Inspection / Activity Plan Report 22 09/01/2016 - 06/30/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site SGISI - UNIT 2 SG IN-SERVICE INSPECTION 1 2 05/22/2017 05/26/2017 IP 7111108P Inservice Inspection Activities - PWR EP - EXERCISE INSPECTION 3 1, 2 07/24/2017 07/28/2017 IP 7111401 Exercise Evaluation 1, 2 07/24/2017 07/28/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 07/24/2017 07/28/2017 IP 7111408 Exercise Evaluation - Scenario Review 1, 2 07/24/2017 07/28/2017 IP 71151 Performance Indicator Verification CDBI - COMPONENT DESIGN BASIS INSPECTION 7 1, 2 07/24/2017 07/28/2017 IP 7111121 Component Design Bases Inspection 1, 2 08/14/2017 08/18/2017 IP 7111121 Component Design Bases Inspection 1, 2 08/28/2017 09/01/2017 IP 7111121 Component Design Bases Inspection 1, 2 09/18/2017 09/22/2017 IP 7111121 Component Design Bases Inspection HS - TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 08/07/2017 08/11/2017 IP 7111107T Heat Sink Performance OL EXAM - INITIAL LICENSE EXAM PREP 3 1 10/02/2017 10/06/2017 V23502 SURRY OCTOBER 2017 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL LICENSE EXAM 3 1 10/30/2017 11/17/2017 V23502 SURRY OCTOBER 2017 INITIAL EXAM AT POWER FACILITIES RP - RP PUBLIC BASELINE INSPECTION 2 1, 2 11/27/2017 12/01/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 11/27/2017 12/01/2017 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 11/27/2017 12/01/2017 IP 71151 Performance Indicator Verification TFPI - TRIENNIAL FIRE PROTECTION INSPECTION 5 1, 2 02/26/2018 03/01/2018 IP 7111105T Fire Protection [Triennial]

1, 2 03/12/2018 03/16/2018 IP 7111105T Fire Protection [Triennial]

EP - EP PROGRAM INSPECTION 3 1, 2 04/09/2018 04/13/2018 IP 7111402 Alert and Notification System Testing 1, 2 04/09/2018 04/13/2018 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 04/09/2018 04/13/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 04/09/2018 04/13/2018 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 04/09/2018 04/13/2018 IP 71151 Performance Indicator Verification ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 04/30/2018 05/04/2018 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 3 of 3 Surry 08/31/2016 07:01:09 Inspection / Activity Plan Report 22 09/01/2016 - 06/30/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site SGISI - UNIT 1 SG IN-SERVICE INSPECTION 1 1 05/07/2018 05/11/2018 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure