SUBJECT:

SURRY POWER STATION - SECURITY BASELINE INSPECTION REPORT 05000280/2023401 AND 05000281/2023401

Dear Daniel G. Stoddard:

On April 6, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Surry Power Station and discussed the results of this inspection with David Wilson and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000280 and 05000281 License Nos. DPR-32 and DPR-37

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000280 and 05000281

License Numbers:

DPR-32 and DPR-37

Report Numbers:

05000280/2023401 and 05000281/2023401

Enterprise Identifier:

I-2023-401-0026

Licensee:

Virginia Electric and Power Company

Facility:

Surry Power Station

Location:

Surry, VA

Inspection Dates:

April 03, 2023, to April 06, 2023

Inspectors:

J. Brown, Senior Physical Security Inspector

A. Richardson, Physical Security Inspector

J. Wallo, Senior Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Surry Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1) Tier I: All Requirements

Tier II: 8 Requirements 02.06 a-d, 02.07 a, 02.08 a, b. e

Tier III: 1 Requirement 02.09

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment testing and maintenance program. The following elements were evaluated from this IP dated August 23, 2018.

Equipment Performance, Testing, and Maintenance (1 Sample)

(1)

Equipment Performance, Testing, and Maintenance (1 Sample)

Tier I: All Requirements

Tier II: 02.09 a, b, 02.11 d, 02.13 a Tier III: 02.15 b, c

71130.07 - Security Training

The inspectors evaluated the security training program through completion of the following

procedure elements: Security Training

(1) Tier I: All Requirements

Tier II: 02.05 a, b, c, 02.06 a, b, 02.07 a

Tier III: 02.10, 02.11 a, 02.12 a, 02.13 a, b

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Security Plan Changes (1 Partial)

(1)

(Partial)

The opportunity to apply this procedure was not available in accordance with IMC 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54 p

(2) since the last performance of this IP.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) February 1, 2022, through February 1,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On April 6, 2023, the inspectors presented the security baseline inspection results to David Wilson and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CR 1183251

10/19/2021

CR 1183866

10/26/2021

CR 1211118

10/24/2022

Corrective Action

Documents

Resulting from

Inspection

CR 1223500

04/06/2023

Procedures

SY-AA-119

Protected Area Control

Revision 4

71130.02

Self-Assessments

PIR #1217811

Self-Assessment

CR1174338

CR1179712

CR1201160

CR1216512

CR1218128

CR1218977

Corrective Action

Documents

CR1218983

Corrective Action

Documents

Resulting from

Inspection

CR1223431

Various IDS and Security Equipment's Testing Documents

Miscellaneous

Various Weapons Accountability Documents

SY-AA-116

Maintenance, Testing, and Calibration

Revision 6

Procedures

SY-AA-120

Operability Testing

Revision 12

WO38204224460

Security Diesel Undervoltage Test

04/07/2022

WO38204297533

CAS Inverter Battery Checks

2/21/2023

WO38204297534

CAS Inverter Battery Checks

10/19/2023

71130.04

Work Orders

WO38204302099

Security Diesel Generator Test

2/08/2023

CR1202206

Corrective Action

Documents

CR1209576

SY-AA-TR-101

Nuclear Security Training Program

Revision 16

71130.07

Procedures

SY-AA-TR-107

Systematic Approach to Training Overview

Revision 7

71151

Procedures

SY-AA-126

Regulatory Assessment Performance Indicator Data Reporting

Revision 2