Updated Inspection Plan for Surry Power Station, Units 1 and 2, NRC Report 05000280/2019005 and 05000281/2019005
ML19239A007
Person / Time
Site: Surry  Dominion icon.png
Issue date: 08/27/2019
From: Bradley Davis
NRC/RGN-II, Division Reactor Projects II
To: Stoddard D
Virginia Electric & Power Co (VEPCO)
Reeder D
References
IR 2019005
Download: ML19239A007 (6)


Text

August 27, 2019

SUBJECT:

UPDATED INSPECTION PLAN FOR SURRY POWER STATION UNITS 1 AND 2, NRC REPORT 05000280/2019005 AND 05000281/2019005

Dear Mr. Stoddard:

The enclosed inspection plan lists the inspections scheduled through June 30, 2021 for Surry Power Station, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections), and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised.

The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4428 with any questions you have regarding this letter.

Sincerely,

/RA/

Bradley J. Davis, Chief Reactor Projects Branch 4 Division of Reactor Projects

Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37

Enclosure(s):

Inspection Plan

cc: Distribution via ListServ SUBJECT:

UPDATED INSPECTION PLAN FOR SURRY POWER STATION UNITS 1 AND 2, NRC REPORT 05000280/2019005 AND 05000281/2019005

DISTRIBUTION:

M. Kowal, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSurry Resource ROPassessment Resource

ADAMS Accession Number: ML19239A007 OFFICE RII:DRP RII:DRP RII:DRP

NAME JDodson DJackson BDavis

DATE 8/22/2019 8/22/2019 8/22/2019

OFFICIAL AGENCY RECORD

Enclosure

3