Security Baseline Inspection Report 05000280/2022404 and 05000281/2022404
ML22292A245
Person / Time
Site: Surry  Dominion icon.png
Issue date: 10/19/2022
From: Gerald Mccoy
NRC/RGN-II/DRS/EB2
To: Stoddard D
Dominion Energy Co
References
IR 2022404
Download: ML22292A245 (3)


Text

October 19, 2022

Mr. Daniel Stoddard Sr. Vice President and Chief Nuclear Officer Dominion Energy Innsbrook Technical Center 5000 Dominion Blvd.

Glen Allen, VA 29060

(U)SUBJECT:

SURRY POWER STATION - SECURITY BASELINE INSPECTION REPORT 05000280/2022404 AND 05000281/2022404

(U)

Dear Mr. Stoddard:

(U)On September 2, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Surry Power Station. On September 6, 2022, the NRC inspectors discussed the results of this inspection with Mr. Fred Mladen, Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.

(U)Two findings of very low security significance (Green) are documented in this report. Two of these findings involved violations of NRC requirements. We are treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2 of the Enforcement Policy.

(U)A licensee-identified violation which was determined to be of very low security significance is documented in this report. We are treating this violation as a non-cited violation (NCV)

consistent with Section 2.3.2 of the Enforcement Policy.

(U)If you contest the violations or the significance or severity of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Surry Power Station.

(U)The following cross cutting aspects were assigned to findings using Inspection Manual Chapter 0310 Aspects Within Cross Cutting Areas: one [H.12] - Avoid Complacency and one

[H.8] - Procedure Adherence. 2 (U)If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Nuclear Security, and Incident Response; and the NRC Resident Inspector at Surry Power Station.

(U)This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

(U)The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Gerald J. McCoy, Chief Engineering Branch 2 Division of Reactor Safety

Docket Nos. 05000280 and 05000281 License Nos. DPR-32 and DPR-37

Enclosure:

As stated

cc w/o encl: Distribution via LISTSERV

ML22292A245 (Cover letter)

Entire Report:

X SUNSI Review Non-Sensitive X Sensitive Publicly Available X Non-Publicly Available OFFICE RII/DRS RII/DRS RII/DRS

NAME J. Montgomery D. Strickland G. McCoy

DATE 10/18/2022 10/18/2022 10/19/2022