June 15, 2022
SUBJECT:
SURRY POWER STATION - INFORMATION REQUEST FOR THE CYBER-SECURITY BASELINE SECURITY INSPECTION, NOTIFICATION TO PERFORM INSPECTION 05000280/2022404; 05000281/2022404
Dear Mr. Stoddard:
On August 29, 2022, the U.S. Nuclear Regulatory Commission (NRC ) will begin a baseline inspection in accordance with Inspection Procedure (IP) 71130.1 0 Cyber-Security, Revision 0 at your Surry Power Station. The inspection will be performed t o evaluate and verify your ability to provide assurance that your digital computer and communicati on systems and networks associated with safety, security, or emergency preparedness (SS EP) functions are adequately protected against cyber attacks in accordance with the requirem ents of Title 10, Code of Federal Regulations (CFR), Part 73, Section 54, and the NRC approved Cyber Security Plan (CSP). The onsite portion of the inspection will take place dur ing the week of August 29, 2022.
Experience has shown that baseline inspections are extremely re source intensive, both for the NRC inspectors and the licensee staff. To minimize the inspecti on impact on the site and to ensure a productive inspection for both parties, we have enclos ed a request for documents needed for the inspection. These documents have been divided in to four groups.
The first group specifies information necessary to assist the i nspection team in choosing the focus areas (i.e., sample set) to be inspected by the cyberse curity IP. This information should be made available electronically no later than July 1, 2022. Th e inspection team will review this information and, by July 15, 2022, will request the specific it ems that should be provided for review.
The second group of additional requested documents will assist the inspection team in the evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture, and the areas of the licensees CSP selected for the cybersecur ity inspection.
This information will be requested for review in the regional o ffice prior to the inspection by August 15, 2022, as identified above. The third group of requested documents consists of those items that the inspection team will review, or need access to, during the inspection. Please have t his information available by the first day of the onsite inspection, August 29, 2022.
The fourth group of information is necessary to aid the inspect ion team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspe ction. It is important that all of these documents are up to date and complete in order to minimiz e the number of additional documents requested during the preparation and/or the onsite po rtions of the inspection.
The lead inspector for this inspection is David Strickland. We understand that our regulatory contact for this inspection is Maria Groshner of your organizat ion. If there are any questions about the inspection or the material requested, please contact the lead inspector at 404-997-4440 or via e-mail at David.Strickland@nrc.gov.
This letter does not contain new or amended information collect ion requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budg et, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not r equired to respond to, a request for information or an information collection requiremen t unless the requesting document displays a currently valid Office of Management and Budget cont rol number.
In accordance with 10 CFR 2.390, Public Inspections, Exemption s, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspec tion in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Docu ments Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA Philipp Braaten acting for/
Gerald McCoy, Branch Chief Engineering Branch 2 Division of Reactor Safety
Docket No.: 50-280, 50-281 License No.: DPR-32, DPR-37
Enclosure:
Surry Power Station Cyber-Security Inspection Document Request
cc w/encl: Distribution via LISTSERV
ML22168A027 x SUNSI x Non-Sensitive x Publicly Available Review Sensitive Non-Publicly Available
OFFICE RII/DRS/EB2 RII/DRS/EB2 NAME D. Strickland P. Braaten for G. McCoy DATE 6/15/2022 6/15/2022
Inspection Report: 05000325/2022404 and 05000324/2022404
Inspection Dates: August 29 - September 2, 2022
Inspection Procedure: IP 71130.10, Cyber-Security, Revision 0
NRC Inspectors: David Strickland, Lead 404-997-4440
David.Strickland@nrc.gov
Jonathan Montgomery 404-997-4880
Jonathan.Montgomery@nrc.gov
NRC Contractors: Casey Priester Balla Barro
Frederick.Priester@nrc.gov Balla.Barro@nrc.gov
Enclosure I. Information Requested for In-Office Preparation
The initial request for information (i.e., first RFI) concentra tes on providing the inspection team with the general information necessary to select appropria te components and CSP elements to develop a site-specific inspection plan. The first RFI is used to identify the list of critical systems and critical digital assets (CSs/CDAs) plus operational and management (O&M) security control portions of the CSP to be cho sen as the sample set required to be inspected by the cyber-security IP. The fir st RFIs requested information is specified below in Table RFI #1. The Table RFI # 1 information is requested to be provided to the regional office by July 1, 2022, or sooner, to facilitate the selection of the specific items that will be reviewed during th e onsite inspection weeks.
The inspection team will examine the returned documentation fro m the first RFI and identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more focused follow-up request to develop the second RFI. The inspec tion team will submit the specific systems and equipment list to your staff by July 1 5, 2022, which will identify the specific systems and equipment that will be utilized to eva luate the CSs/CDAs, defensive architecture, and the areas of the licensees CSP sel ected for the cyber-security inspection. We request that the additional information provided from the second RFI be made available to the regional office prior to the inspe ction by August 15, 2022.
The required Table RFI 1 information shall be provided electron ically to the lead inspector by July 1, 2022. If a compact disk (CD) is provided, please provide four copies (one for each inspector/contactor). The preferred file f ormat for all lists is a searchable Excel spreadsheet file. These files should be indexe d and hyper-linked to facilitate ease of use. If you have any questions regarding thi s information, please call the inspection team leader as soon as possible.
Table RFI #1
Request: IP Ref
A list of all Identified Critical Systems and Critical Digital Assets,-
1 highlight/note any. additions, deletions, reclassifications du e to new Overall guidance from white papers, changes to NEI 10-04, 13-10, etc. s ince the last cyber security inspection.
2 A list of EP and Security onsite and offsite digital communicat ion systems Overall
3 Network Topology Diagrams to include information and data flow for critical systems in levels 2, 3 and 4 (If available) Overall
4 Ongoing Monitoring and Assessment program documentation 03.01( a)
5 The most recent effectiveness analysis of the Cyber Security P rogram 03.01(b)
Table RFI #1
Request: IP Ref
6 Vulnerability screening/assessment and scan program documentat ion 03.01(c)
Cyber Security Incident response documentation, including incid ent detection, response, and recovery documentation as well as 03.02(a)
7 contingency plan development, implementation and including any and program documentation that requires testing of security boundar y 03.04(b)
device functionality
8 Device Access and Key Control documentation 03.02(c)
9 Password/Authenticator documentation 03.02(c)
10 User Account/Credential documentation 03.02(d)
11 Portable Media and Mobile Device control documentation, includi ng kiosk security control assessment/documentation 03.02(e)
Design change/ modification program documentation and a List of all 12 design changes completed since the last cyber security inspecti on, 03.03(a)
including either a summary of the design change or the 50.59 documentation for the change.
03.03(a)
13 Supply Chain Management documentation including any security impact analysis for new acquisitions, (b) and (c)
Configuration Management documentation including any security 03.03(a)
14 impact analysis performed due to configuration changes since th e last and (b)
inspection
15 Cyber Security Plan and any 50.54(p) analysis to support change s to the plan since the last inspection 03.04(a)
16 Cyber Security Metrics tracked (if applicable) 03.06 (b)
17 Provide documentation describing any cyber security changes to the access authorization program since the last cyber security insp ection. Overall
18 Provide a list of all procedures and policies provided to the N RC with their descriptive name and associated number (if available) Overall
19 Performance testing report (if applicable) 03.06 (a)
In addition to the above information please provide the followi ng:
(1) Electronic copy of the UFSAR and technical specifications.
(2) Name(s) and phone numbers for the regulatory and technical cont acts.
(3) Current management and engineering organizational charts.
Based on this information, the inspection team will identify an d select specific systems and equipment (e.g., CSs/CDAs) from the information requested b y Table RFI #1 and submit a list of specific systems and equipment to your staff b y July 15, 2022 for the second RFI (i.e., RFI #2).
II. Additional Information Requested to be Available Prior to I nspection.
As stated in Section I above, the inspection team will examine the returned documentation requested from Table RFI #1 and submit the list o f specific systems and equipment to your staff by July 15, 2022 for the second RFI (i.e., RFI #2). The second RFI will request additional information required to evaluate th e CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected for the cyber-security inspection. The additional information requested for the specif ic systems and equipment is identified in Table RFI #2. All requested information shall follow the guidance document referenced above
The Table RFI 2 information shall be provided electronically to the lead inspector by August 15, 2022. If a compact disk (CD) is provided, please provide four copies (one for each inspector/contactor). The preferred file format for al l lists is a searchable Excel spreadsheet file. These files should be indexed and hyper-linke d to facilitate ease of use. If you have any questions regarding this information, plea se call the inspection team leader as soon as possible. If you have any questions rega rding this information, please call the inspection team leader as soon as possible.
Table RFI #2
Request Items
For the system(s) chosen for inspection provide:
1 Ongoing Monitoring and Assessment activity performed on the system(s) 03.01(a)
2 All Security Control Assessments for the selected system(s) 03.01(a)
All vulnerability screenings/assessments associated with or sca ns 3 performed on the selected system(s) since the last cyber securi ty 03.01(c)
inspection
Table RFI #2
Request Items
Documentation (including configuration files and rules sets) fo r Network-based Intrusion Detection/Protection Systems (NIDS/NIPS ),
4 Host-based Intrusion Detection Systems (HIDS), and Security 03.02(b)
Information and Event Management (SIEM) systems for system(s)
chosen for inspection)
Documentation (including configuration files and rule sets) for intra-5 security level firewalls and boundary devices used to protect t he 03.02(c)
selected system(s)
6 Copies of all periodic reviews of the access authorization list for the selected systems since the last inspection 03.02(d)
7 Baseline configuration data sheets for the selected CDAs 03.03( a)
8 Documentation on any changes, including Security Impact Analyses, performed on the selected system(s) since the last inspection 03.03(b)
9 Copies of the purchase order documentation for any new equipmen t purchased for the selected systems since the last inspection 03.03(c)
03.02(a)
10 Copies of any cyber security drills performed since the last inspection, along with any reports or assessments generated.
03.04(b)
Copy of the individual recovery plan(s) for the selected system(s) 03.02(a)
11 including documentation of the results the last time the backup s 03.04(b)
were executed.
Corrective actions taken as a result of cyber security incident s/issues 12 to include previous NRC violations and Licensee Identified Viol ations 03.05 since the last cyber security inspection
III. Information Requested to be Available on First Day of Ins pection
For the specific systems and equipment identified in Section II above, provide the following RFI (i.e., Table 1ST Week Onsite) electronically by August 29, 2022, the first day of the inspection.
Table 1ST Week Onsite
Request: Items
1 Any cyber security event reports submitted in accordance with 1 0 CFR 73.77 since the last cyber security inspection 03.04(a)
Table 1ST Week Onsite
Request: Items
Updated Copies of corrective actions taken as a result of cyber 2 security incidents/issues, to include previous NRC violations and 03.05 Licensee Identified Violations since the last cyber security inspection, as well as vulnerability-related corrective actions
In addition to the above information please provide the followi ng:
(1) Copies of the following documents do not need to be solely avai lable to the inspection team as long as the inspectors have easy and unrestr ained access to them.
a. Updated Final Safety Analysis Report, if not previously provide d;
b. Original FSAR Volumes;
c. Original SER and Supplements;
d. FSAR Question and Answers;
e. Quality Assurance Plan;
f. Technical Specifications, if not previously provided;
g. Latest IPE/PRA Report; and
(2) Vendor Manuals, Assessment and Corrective Actions:
a. The most recent Cyber-Security Quality Assurance (QA) audit and /or self-assessment; and
b. Corrective action documents (e.g., condition reports, including status of corrective actions) generate as a result of the most recent Cyb er-Security Quality Assurance (QA) audit and/or self-assessment.
IV. Information Requested To Be Provided Throughout the I nspection
(1) Copies of any corrective action documents generated as a result of the inspection teams questions or queries during the inspection.
(2) Copies of the list of questions submitted by the inspection tea m members and the status/resolution of the information requested (provided da ily during the inspection to each inspection team member).
If you have any questions regarding the information requested, please contact the inspection team leader
6