IR 05000280/2021005

From kanterella
Jump to navigation Jump to search
Mid-Cycle Letter Revised Updated Inspection Plan for Surry Power Station, Units 1 and 2 (05000280/2021005 and 05000281/2021005)
ML21243A329
Person / Time
Site: Surry  Dominion icon.png
Issue date: 08/31/2021
From: Stewart Bailey
NRC/RGN-II/DRP/RPB4
To: Stoddard D
Virginia Electric & Power Co (VEPCO)
References
IR 2021005
Download: ML21243A329 (5)


Text

August 31, 2021

Mr. Daniel Senior Vice President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT: UPDATED INSPECTION PLAN FOR SURRY POWER STATION UNITS 1 AND 2 (05000280/2021005 AND 05000281/2021005 )

Dear Mr. Stoddard:

This letter is being reissued to revise incorrect inspection report numbers (05000280/2021001 and 05000281/2021001) in the subject line of the previously issued letter (ADAMS Assecion Number ML21239A010). The enclosed inspection plan lists the inspections scheduled through June 30, 2023, for Surry Power Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the February 1, 2021 memo, Calendar Year 2021 Inspection Guidance During COVID -19 Telework Restrictions (ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here:

https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID -19 PHE. NRC staff w ill contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling. The NRC will also be performing baseline inspections of licensee cyber security programs. The specific schedule and procedure to be used for these inspections is being developed by the NRC staff. The staff expects to communicate the schedule for these inspections to each utility separately.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 301-415-1321 with any questions you have regarding this letter.

Sincerely,

/RA/

Stewart N. Bailey, Chief Reactor Projects Branch 4 Division of Reactor Projects

Docket No. 05000280 and 05000281 License No. DPR-32 and DPR -37

Enclosure: Inspection Plan

cc Distribution via ListServ

D. Stoddard 3

SUBJECT: UPDATED INSPECTION PLAN FOR SURRY P OWER STATION UNITS 1 A ND 2 (05000280/2021005 AND 05000 281/2021005) - DATED A ugust 31, 2021

DISTRIBUTION:

M. Kowal, RII OE Ma il RidsNrrDro Resource RidsNrrPMSurry Resource ROPassessment Resource ROPreports R esource PUBLIC

ADAMS Accession Number:

OFFICE RII/DRP RII/DRP NAME J. Seat S. Bailey DATE 08/31/2021 08/31/2021 OFFICIAL RECORD COPY IP 22b Site Inspection Activity Plan Surry

09/01/2021 - 06/30/2023

Unit Start End Activity CAC Title Staff Count

TRIENNIAL FIRE PROTECTION INSPECTION 4

1, 2 9/20/2021 9/24/2021 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

1, 2 10/4/2021 10/8/2021 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

UNIT 2 IN-SERVICE INSPECTION + SG 1

2 11/1/2021 11/12/2021 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

EVALUATIONS OF CHANGES, TESTS AND EXPERIMENTS 3

1, 2 1/31/2022 2/4/2022 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments

MATERIAL CONTROL & ACCOUNTING 1

1, 2 3/1/2022 5/31/2022 IP 71130.11 000742 Material Control and Accounting (MC&A)

SECURITY BASELINE INSPECTION 1

1, 2 3/7/2022 3/11/2022 IP 71130.02 000734 Access Control

1, 2 3/7/2022 3/11/2022 IP 71151 001338 Performance Indicator Verification

10 CFR 50.69 IMPLEMENTATION INSPECTION 4

1, 2 6/6/2022 6/10/2022 IP 37060 000521 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection 1, 2 6/20/2022 6/24/2022 IP 37060 000521 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection

PROBLEM IDENTIFICATION & RESOLUTION INSPECTION 4

1, 2 7/11/2022 7/15/2022 IP 71152B 000747 Problem Identification and Resolution

1, 2 7/25/2022 7/29/2022 IP 71152B 000747 Problem Identification and Resolution

TARGET SET INSPECTION 2

1, 2 8/8/2022 8/12/2022 IP 71130.14 000743 Review of Power Reactor Target Sets

CYBER SECURITY INSPECTION 2

1, 2 8/29/2022 9/2/2022 IP 71130.10P 000741 Cyber Security

EMERGENCY PREPAREDNESS PROGRAM INSPECTION 2

1, 2 9/26/2022 9/30/2022 IP 71114.02 000717 Alert and Notification System Testing

1, 2 9/26/2022 9/30/2022 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

1, 2 9/26/2022 9/30/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1, 2 9/26/2022 9/30/2022 IP 71114.05 000720 Maintenance of Emergency Preparedness

1, 2 9/26/2022 9/30/2022 IP 71151 001397 Performance Indicator Verification

SECURITY BASELINE INSPECTION 3

1, 2 9/26/2022 9/30/2022 IP 71130.05 000737 Protective Strategy Evaluation

1, 2 9/26/2022 9/30/2022 IP 71130.09 001656 Security Plan Changes

RP OCCUPATIONAL RAD SAFETY INSPECTION 4

Prepared on 8/25/2021 11:53:46 AM 1 of 2 IP 22b Site Inspection Activity Plan

1, 2 10/17/2022 10/21/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

1, 2 10/17/2022 10/21/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

1, 2 10/17/2022 10/21/2022 IP 71124.04 000728 Occupational Dose Assessment

1, 2 10/17/2022 10/21/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation

1, 2 10/17/2022 10/21/2022 IP 71151 000746 Performance Indicator Verification

1, 2 11/14/2022 11/18/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

1, 2 11/14/2022 11/18/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

1, 2 11/14/2022 11/18/2022 IP 71124.04 000728 Occupational Dose Assessment

1, 2 11/14/2022 11/18/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation

1, 2 11/14/2022 11/18/2022 IP 71151 000746 Performance Indicator Verification

UNIT 1 IN-SERVICE INSPECTION +SG 2

1 10/24/2022 11/4/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

SECURITY BASELINE INSPECTION 3

1, 2 4/3/2023 4/7/2023 IP 71130.02 000734 Access Control

1, 2 4/3/2023 4/7/2023 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

1, 2 4/3/2023 4/7/2023 IP 71130.07 000739 Security Training

1, 2 4/3/2023 4/7/2023 IP 71130.09 001656 Security Plan Changes

1, 2 4/3/2023 4/7/2023 IP 71151 001338 Performance Indicator Verification

UNIT 2 IN-SERVICE INSPECTION +SG 2

2 5/8/2023 5/12/2023 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP OCCUPATIONAL RADIATION SAFETY AND TRANSPORTATION BASELINE 2

1, 2 5/8/2023 5/12/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

1, 2 5/8/2023 5/12/2023 IP 71124.02 000726 Occupational ALARA Planning and Controls

1, 2 5/8/2023 5/12/2023 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 1, 2 5/8/2023 5/12/2023 IP 71151 000746 Performance Indicator Verification

Prepared on 8/25/2021 11:53:46 AM 2 of 2