IR 05000280/2021002

From kanterella
Jump to navigation Jump to search
Integrated Inspection Report 05000280/2021002 and 05000281/2021002
ML21225A248
Person / Time
Site: Surry  Dominion icon.png
Issue date: 08/12/2021
From: Stewart Bailey
NRC/RGN-II
To: Stoddard D
Virginia Electric & Power Co (VEPCO)
T Francis
References
IR 2021002
Download: ML21225A248 (22)


Text

August 12, 2021

SUBJECT:

SURRY POWER STATION - INTEGRATED INSPECTION REPORT 05000280/2021002 AND 05000281/2021002

Dear Mr. Stoddard:

On June 30, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Surry Power Station. On July 22, 2021, the NRC inspectors discussed the results of this inspection with Mr. Doug Lawrence, Surry Site Vice President, and other members of your staff.

The results of this inspection are documented in the enclosed report.

One finding of very low safety significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; and the NRC Resident Inspector at Surry Power Station.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; and the NRC Resident Inspector at Surry Power Station. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Stewart N. Bailey, Chief Reactor Projects Branch 4 Division of Reactor Projects

Docket Nos. 05000280 and 05000281 License Nos. DPR-32 and DPR-37

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000280 and 05000281

License Numbers:

DPR-32 and DPR-37

Report Numbers:

05000280/2021002 and 05000281/2021002

Enterprise Identifier: I-2021-002-0027

Licensee:

Virginia Electric and Power Company

Facility:

Surry Power Station

Location:

Surry, VA

Inspection Dates:

April 1, 2021 to June 30, 2021

Inspectors:

L. McKown, Senior Resident Inspector

B. Towne, Resident Inspector

A. Butcavage, Reactor Inspector

S. Downey, Senior Reactor Inspector

B. Kellner, Senior Health Physicist

J. Rivera, Health Physicist

Approved By:

Stewart N. Bailey, Chief

Reactor Projects Branch 4

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Surry Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

Transient Combustibles Stored in Restricted Area Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000280/2021002-01 Open/Closed

[P.3] -

Resolution 71152 NRC inspectors identified a finding of very low safety significance (Green) and an associated non-cited violation (NCV) of License Condition 3.I, Fire Protection, associated with Dominion Energys failure to implement and maintain in effect the provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report (UFSAR), which resulted in transient combustible conditions adverse to fire protection including storage within a restricted or combustion free zone.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 began the inspection period at rated thermal power. On April 13, 2021, Unit 1 began coast down from rated thermal power to 80 percent and performed shut down, on April 25, 2021, for entry into a scheduled refueling outage. On May 31, 2021, Unit 1 achieved criticality following the outage returning to rated thermal power on June 4, 2021.

Unit 2 operated at or near rated thermal power for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), resident and regional inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, the resident inspectors performed periodic site visits each week, increasing the amount of time on site as local COVID-19 conditions permitted.

As part of their onsite activities, resident inspectors conducted plant status activities as described in IMC 2515, Appendix D; observed risk significant activities; and completed on site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 1 containment closure alignment on April 27, 2021.
(2) Unit 1 inside recirculation spray partial system alignment on May 12, 2021.

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) Unit 1 residual heat removal system alignment during refueling operations on May 20, 2021.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Unit 1 emergency switchgear room, on April 1, 2021.

(2)

  1. 1 emergency diesel generator (EDG) room during maintenance window, on May 5, 2021.
(3) Unit 1 safeguards building all levels, on May 6, 2021.
(4) Auxiliary Building, 13' elevation, on May 10, 2021.
(5) Unit 1 containment all levels, on May 24, 2021.

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 03.01) (2 Samples)

The inspectors evaluated internal flooding mitigation protections in the:

(1) Unit 1 turbine building associated with service water to bearing cooling and recirculation spray piping degradation at isolation valves 1-SW-MOV-103B, 101C, and 101D, on May 12, 2021.
(2) Unit 1 turbine building following an uncontrolled water event from a fire sprinkler pipe during maintenance which sprayed down in the vicinity of the condensate pumps on June 1, 2021.

71111.08P - Inservice Inspection Activities (PWR) PWR Inservice Inspection Activities Sample (IP Section 03.01)

(1) The inspectors evaluated pressurized-water reactor non-destructive testing by reviewing the following examinations from May 3 to June 18, 2021:

1. Eddy Current Examination

a. Steam Generator C - ET for tubes R6C61, R7C56, R9C61, R10C56, R10C59, R10C60

2. Liquid Penetrant Examination

a. Weld 1-05A, Valve to pipe weld, ASME Class 1. This included a review of associated welding activities.

b. Weld 1-06A, Valve to pipe weld, ASME Class 1. This included a review of associated welding activities.

3. Magnetic Particle Examination

a. Weld 1-01, Reactor Pressure Vessel (RPV) head to flange weld, ASME Class 1 b. Weld 2-10, Nozzle to vessel weld, ASME Class 2

4. Ultrasonic Examination

a. Weld 1-A02, RHR heat exchanger circumferential shell weld, ASME Class 2 b. Weld 2-10, Nozzle to vessel weld, ASME Class 2 c. Weld CRD-54, Control rod drive housing weld, ASME Class 1

5. Visual Examination

a. Bare metal visual examination of RPV head surface and penetrations, ASME Class 1 b. Secondary side visual examination of steam generators A, B, and C

The Inspectors evaluated the licensees boric acid control program performance.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during Unit 1 startup and criticality following scheduled refueling on May 31, 2021.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) Inspectors observed and evaluated licensed operator performance in the simulator for Unit 1 fuel cycle 31 startup and criticality just-in-time (JIT) training, on May 10, 2021.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (2 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Main steam safety valve leakage and obsolescence issues, on May 17, 2021.
(2) Unit 1 'A' low head safety injection recirculation check valve, on May 27, 2021.

Quality Control (IP Section 03.02) (1 Sample)

The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following SSC remains capable of performing its intended function:

(1) Unit 1 'B' motor driven auxiliary feed water pump discharge check valve, on April 23, 2021.

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Elevated shutdown risk for reactor vessel head lift and restoration of vessel cavity level, on May 1, 2021.
(2) Unit 1 solid plant operations, with 'A' low head safety injection train out of service, while filling and venting safety injection accumulators using 'B' train of low head safety injection on May 27, 2021.

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) CR1171119, Unit 1 service water to 'D' recirculation spray heat exchanger vent line leakage, on April 28, 2021.
(2) CR1172169, Unit 1 'C' safety valve nozzle nonconformance, on May 12, 2021.
(3) CR1171685, 'B' charging pump in IST alert, on May 13, 2021.
(4) CR1173055, Unit 1 high rod control cluster assembly drag profile at location B-08, on May 18, 2021.
(5) CR1173688, 1-SI-61 Unit 1 'A' low head safety injection recirculation check valve leakage, on May 26, 2021.

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (2 Samples)

The inspectors evaluated the following temporary or permanent modifications:

(1) Freeze seals in support of Unit 1 chemical volume control system non-regenerative heat exchanger and seal water heat exchanger cooling water relief valve maintenance, on May 6, 2021.
(2) Unit 1 service water to bearing cooling and recirculation spray flange inspection remediation and modification in turbine building associated with adverse conditions at SW-MOV-103B, 101C, and 101D, on May 20, 2021.

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (7 Samples)

The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:

(1) Unit 1 low level intake structure vacuum priming air compressors following multiple failures, on April 19, 2021.
(2) Unit 1 fuel building upender return to service testing following hoist failure, CR1171627, on May 4, 2021.
(3) Unit 1 service water to recirculation spray 'D' repairs under word orders (WOs) 38204238652 and 38204238638, on May 5, 2021.
(4) Unit 1 'A' motor driven auxiliary feedwater pump following refueling outage planned maintenance window under WOs 38203875553 and 38204210306, on May 10, 2021.
(5) Unit 1 'B' charging pump following balance ring adjustment for elevated vibrations under WO 38103610535, on May 11, 2021 (6)1-OPT-EG-009 OTO1, return to service of #1 EDG following Turbo Charger Replacement, on May 14, 2021.

(7)1-OPT-SI-14, test of safety injection check valves to reactor coolant system cold legs following repair of 1-SI-61 U1 'A' low head safety injection recirculation check valve, on May 27, 2021.

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated Unit 1 refueling outage 1R30 activities from April 24, to May 31, 2021.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1)2-OPT-CS-002, Unit 2 Containment Spray Pump Quarterly Surveillances, on April 15, 2021.

(2)1-OPT-ZZ-001, ESF Actuation with Undervoltage and Degraded Voltage - 1H bus, on April 27, 2021.

(3)1-EPT-0106-01, Main Station Battery 1A Service Test, performed on May 5, 2021.

(4)1-NPT-CT-101, Reactor Containment Building Integrated Leak Rate Test (Type A Containment Testing), on May 26, 2021.

Inservice Testing (IP Section 03.01) (1 Sample)

(1)1-OPT-RS-003, Unit 1 Inside Recirculation Spray IST Surveillances, on May 12, 2021.

Containment Isolation Valve Testing (IP Section 03.01) (1 Sample)

(1)1-OSP-CT-212, Containment Isolation Valve Testing performed on Penetration 110, Valves 1-CC-TV-140A and 140B, on May 17, 2021.

FLEX Testing (IP Section 03.02) (1 Sample)

(1)0-MPM-1960-04, Beyond Design Basis Auxiliary Feedwater Pump Triennial Functional Testing, 0-BDB-P-2A, 0-BDB-P-2B, and 0-BDB-P-2C, on June 29, 2021.

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated a licensee emergency planning drill in the simulator and technical support center, on March 30, 2021. The drill involved a tornado, loss of offsite power, small break loss of coolant accident, and fuel damage with associated emergency classification declarations, and protective action recommendations from notice of unusual event to alert to general emergency.

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

The inspectors evaluated:

(1) The inspectors evaluated a licensee emergency planning drill the simulator and technical support center on June 22, 2021. The drill involved an earthquake with multiple aftershock tremors, fuel damage, steam generator tube leak, and stuck open steam generator safety valve with associated emergency classification declarations and protective action recommendations from notice of unusual event to general emergency.

RADIATION SAFETY

71124.01 - Radiological Hazard Assessment and Exposure Controls

Radiological Hazard Assessment (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated how the licensee identifies the magnitude and extent of radiation levels and the concentrations and quantities of radioactive materials and how the licensee assesses radiological hazards.

Instructions to Workers (IP Section 03.02) (1 Sample)

The inspectors evaluated instructions to workers including radiation work permits (RWPs)used to access high radiation areas.

(1) The inspectors reviewed the following radiation work packages:
  • RWP 2111, Reactor Disassembly
  • RWP 2503, Seal Table and Flux Thimbles
  • RWP 2508, Reactor Head Lift
  • RWP 2527, Fuel Transfer System Inspection and Repair

Contamination and Radioactive Material Control (IP Section 03.03) (2 Samples)

The inspectors evaluated licensee processes for monitoring and controlling contamination and radioactive material.

(1) Observed licensee perform surveys of potentially contaminated material leaving the radiologically controlled area (RCA).
(2) Observed workers exiting the RCA during the Unit 1 refueling outage.

Radiological Hazards Control and Work Coverage (IP Section 03.04) (5 Samples)

The inspectors evaluated in-plant radiological conditions during facility walkdowns and observation of radiological work activities. The inspectors reviewed the following radiological work packages for areas with potential airborne radioactivity:

(1) RWP 2111, Reactor Disassembly
(2) RWP 2503, Seal Table and Flux Thimbles
(3) RWP 2507, Blind Flange Removal
(4) RWP 2527, Fuel Transfer System Inspection and Repair
(5) RWP 2508, Reactor Head Lift

High Radiation Area and Very High Radiation Area Controls (IP Section 03.05) (3 Samples)

The inspectors evaluated licensee controls of the following High Radiation Areas and Very High Radiation Areas:

(1) HIC storage area in radwaste facility
(2) Sludge transfer pump room in radwaste facility
(3) Unit 1 containment

Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section 03.06) (1 Sample)

(1) The inspectors evaluated radiation worker and radiation protection technician performance as it pertains to radiation protection requirements.

71124.02 - Occupational ALARA Planning and Controls

Radiological Work Planning (IP Section 03.01) (5 Samples)

The inspectors evaluated the licensees radiological work planning.

The inspectors reviewed the following ALARA planning packages:

(1) ALARA Plan 21-005 - U1R39 Valve Maintenance
(2) ALARA Plan 21-008 - U1R30 Reactor Disassembly
(3) ALARA Plan 21-009 - U1R30 Reactor Reassembly
(4) ALARA Plan 21-010 - U1R30 Scaffold Activities
(5) ALARA Plan 21-020 - U1R30 Bare Head Inspection

Verification of Dose Estimates and Exposure Tracking Systems (IP Section 03.02) (2 Samples)

The inspectors evaluated dose estimates and exposure tracking.

The inspectors reviewed the following as low as reasonably achievable planning documents and radiological outcome evaluations:

(1) ALARA Plan and Post Job review, AP 20-009, U2R29 Reactor Disassembly (RWP-20-3111)
(2) ALARA Plan and Post Job review, AP 20-003, U2R29 Station Operations Activities (RWP-20-3103)

Implementation of ALARA and Radiological Work Controls (IP Section 03.03) (3 Samples)

The inspectors reviewed as low as reasonably achievable practices and radiological work controls.

The inspectors reviewed the following activities:

(1) Unit 1 fuel transfer cart survey and vendor inspection and repair activities.

RWP 21-2102

(2) Unit 1 reactor disassembly activities (cable removal, hoist installation, and de-tensioning). RWP 21-210
(3) Unit 1 primary steam generator eddy current. RWP 21-2502

Radiation Worker Performance (IP Section 03.04) (1 Sample)

The inspectors evaluated radiation worker and radiation protection technician performance during:

(1) Unit 1 fuel transfer cart survey and vendor inspection and repair activities.

OTHER ACTIVITIES - BASELINE

71152 - Problem Identification and Resolution

Semiannual Trend Review (IP Section 02.02) (1 Sample)

(1) The inspectors reviewed the licensees corrective action program for potential adverse trends in fire protection program control of transient combustibles that might be indicative of a more significant safety issue.

71153 - Follow Up of Events and Notices of Enforcement Discretion Event Followup (IP Section 03.01)

(1) The inspectors evaluated a loss of the capability to activate the sirens from both Surry local activation sites reported in accordance with 10 CFR 50.72(b)(2)(xi) and 10 CFR 50.72{b)(3)(xiii) documented in EN 55299 and licensees response on June 9,

INSPECTION RESULTS

Transient Combustibles Stored in Restricted Area Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems

Green NCV 05000280/2021002-01 Open/Closed

[P.3] -

Resolution 71152 NRC inspectors identified a finding of very low safety significance (Green) and an associated non-cited violation (NCV) of License Condition 3.I, Fire Protection, associated with Dominion Energys failure to implement and maintain in effect the provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report (UFSAR), which resulted in transient combustible conditions adverse to fire protection including storage within a restricted or combustion free zone.

Description:

The inspectors performed a trend review of the transient combustible program based upon three NRC-identified and eight licensee-identified conditions adverse to fire protection dating from April 29, through May 12, 2021. These events included storage without a permit, storage in excess of permit limits, storage under an expired permit, storage under a permit for a different work activity, revising permit limits without updated safety review and approval, and storage in a restricted area without variance.

Surry implements the transient combustible program in accordance with CM-AA-FPA-100, Fire Protection/Appendix R (Fire Safe Shutdown) Program, and CM-AA-FPA-101, Control of Combustible and Flammable Materials, as incorporated by the Surry UFSAR and license commitment. In accordance with this process, the station entered the conditions adverse to fire protection from April 29, 2021, through May 12, 2021, into the corrective action program, restoring conditions in the field, performing crew human factors clock resets, departmental operating experience presentations, performance gap analyses, and training needs analyses.

However, Dominion Energys resolution of these events failed to prevent the same and similar failures to implement the transient combustible program as discovered by the NRC inspectors during a follow-up walkdown in one of the previously challenged areas, the auxiliary building 13-foot elevation, on June 16, 2021.

Specifically, the inspectors observed expired transient fire loading permit #403 at gate 15, with associated materials remaining in the work area. This permit supported a freeze seal and relief valve replacement completed four weeks earlier during the Unit 1 refueling outage.

The inspectors also found a large full radwaste trash bag, blue plastic floor matting, and a mop, bucket, and wringer assembly within the Unit 2 A charging pump cubicle without any posted transient fire loading permit. These materials remained from planned maintenance on the pump which was returned to service the week before. The inspectors engaged with the licensee on June 16, 2021, to determine which permit covered the associated work activity.

However, the licensee could not identify any within the station database which is required to be tracked and maintained by CM-AA-FPA-101.

Furthermore, the inspectors identified installed plastic matting as well as additional rolls of plastic matting, tape, and an oil drum stored immediately adjacent to and taller than the two-foot-high dike surrounding the Unit 1 charging pumps. Licensee procedure CM-AA-FPA-101, 9, Surry Power Station Transient Combustible Loading Limits and Restrictions, restricts loading in this area such that no transients will be stored within 10 feet of the charging pump dikes. Surry UFSAR, Section 9.10.2.4 describes these dikes as erected at the entrances to the charging pump cubicles to prevent pump damage from a transient combustible liquid spill or from possible fire protection leakage. The station posted transient fire loading permit #405 in the area to support the work activity with the step to observe restrictions in fire zones listed in [CM-AA-FPA-101] Attachments 8 and 9 or obtain variance checked completed. However, the inspectors found that the station had failed to establish any variance or compensatory actions associated with the transient combustibles stored within a restricted area or combustion free zone.

Corrective Actions: On June 16, 2021, Dominion Energy corrected the identified conditions adverse to fire protection in the field. The station has developed additional actions to assess weakness in prior corrective actions as well as identifying programmatic opportunities for improvement.

Corrective Action References: CR1172184, CR1172065, CR1172598, CR1175926, CA8483490

Performance Assessment:

Performance Deficiency: The inspectors found that Dominion Energys failure to implement the fire protection program in accordance with licensee procedures CM-AA-FPA-100 and CM-AA-FPA-101, which resulted in transient combustible conditions adverse to fire protection, was a performance deficiency reasonably within the licensees ability to foresee and prevent.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Protection Against External Factors attribute of the Mitigating Systems cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the NRC inspectors identified transient combustibles stored adjacent and taller than the Unit 1 charging pump dike adversely affected the restricted or combustion free zones function to prevent fire spread. The inspectors used IMC 0612, Appendix E, Examples of Minor Issues, dated January 1, 2021, to inform answers to the more than minor screening questions and found this condition consistent with more than minor example 4.j.

Significance: The inspectors assessed the significance of the finding using Appendix F, Fire Protection and Post - Fire Safe Shutdown SDP. This finding was determined to be of very low safety significance (Green) as the unattended transient combustibles stored adjacent to the Unit 1 charging pump dike screened to a low degradation grading in accordance with IMC 0609, Appendix F, Attachment 2.

Cross-Cutting Aspect: P.3 - Resolution: The organization takes effective corrective actions to address issues in a timely manner commensurate with their safety significance. The inspectors found that Dominion Energys actions taken to address conditions adverse to fire protection from April 29 through May 12, 2021, failed to prevent the same and similar failures to implement the transient combustible program discovered by the NRC inspectors on June 16, 2021.

Enforcement:

Violation: License Condition 3.I, Fire Protection, states in part, The licensee shall implement and maintain in effect the provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report UFSAR Section 9.10.1, Design Bases, states in part, Compliance with these criteria is contained in the following documents Fire Protection Program document and the associated Administrative Procedures describe the administrative and technical controls. Licensee procedure CM-AA-FPA-101, Attachment 9, Surry Power Station Transient Combustible Loading Limits and Restrictions, restricts loading such that no transients will be stored within 10 feet of the charging pump dikes.

Contrary to the above, on June 16, 2021, Dominion Energy failed to implement and maintain in effect the provisions of the approved fire protection program as described in the UFSAR, resulting in noncompliance with the fire protection program document, CM-AA-FPA-100, and the associated administrative procedure, CM-AA-FPA-101, which describe the administrative and technical controls of transient combustibles. Specifically, transient combustible material was stored immediately adjacent to and taller than the two-foot-high dike surrounding the Unit 1 charging pumps.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On July 22, 2021, the inspectors presented the integrated inspection results to Mr. Doug Lawrence, Surry Site Vice President, and other members of the licensee staff.
  • On June 18, 2021, the inspectors presented the in-service inspection results to Mr. Doug Lawrence, Surry Site Vice President, and other members of the licensee staff.
  • On May 5, 2021, the inspectors presented the radiation safety inspection results to Mr. Doug Lawrence, Surry Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.04

Drawings

11448-FM-084B

Sheet 1

Recirculation Spray System

11448-FM-087A

SH-001

Residual Heat Removal System Flow Diagram

11448-FM-087A

SH-002

Residual Heat Removal System Flow Diagram

Procedures

0-MCM-1202-05

CLOSING AND OPENING THE EQUIPMENT HATCH FOR

REFUELING INTEGRITY

0-MCM-1202-06

Emergency Closure of the Equipment Hatch

1-OPT-RH-001A

RHR System Alignment

1-OPT-RS-003

FLOW TEST OF INSIDE RECIRCULATION SPRAY PUMPS

1-RS-P-1A AND 1-RS-P-1B

71111.05

Corrective Action

Documents

Resulting from

Inspection

CR1172065

CR1172598

CR1172598

Fire Plans

0-FS-FP-121

Diesel Generator Room Number 1 Elevation 27 feet - 6 inches

2

1-FS-FP-107

Unit 1 Emergency Switchgear Room Elevation 9 feet - 6

inches

003

1-FS-FP-134,

135, 136, 137

Unit 1 Containment

1-FS-FP-140

Safeguards Basement - Unit 1 Elevation 11 feet - 6 inches

2

1-FS-FP-141

Safeguards Spray Side - Unit 1 Elevation 27 feet - 6 inches

2

1/2-FS-FP-157

Charging Pumps - Unit 1/2 Auxiliary Building Elevation 13 feet

- 0 inches and 2 feet - 0 inches

003

1/2-FS-FP-159

Auxiliary Building - General Area Unit 1/2 Elevation 13 feet

2

Procedures

CM-AA-FPA-101

Control of Combustible and Flammable Materials

71111.06

Corrective Action

Documents

CR1172021

CR1172203

CR1174293

CR1174301

CR1174322

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.08P

Corrective Action

Documents

CR-1172381

Circumferential Primary Water Stress Corrosion Cracking

detected during eddy current examination

5/9/21

CR-1172672

Through wall hole in 1-RC-E-1, #4 and #5, primary steam

separator riser barrels

5/12/21

Engineering

Evaluations

- 9323920 -

000

Surry Unit 1 1R30 Steam Generator ECT Inspection Plan

3/8/21

51-9325076-000

Site Validation of EPRI Qualified Eddy Current Techniques for

Surry 1R30

4/28/21

ETE-CEP-2019-

1006

Steam Generator Condition Monitoring And Operational

Assessment Surry Unit 1 (R29)

11/13/19

ETE-CEP-2021-

1002

Steam Generator Degradation Assessment, Surry Unit 1

Refueling Outage 1R30, Spring 2021

3/31/21

ETE-CEP-2021-

1003

Steam Generator Condition Monitoring and Operational

Assessment, Surry Unit 1 Refueling Outage EOC30 (1R30),

Spring 2021

5/15/21

ETE-SU-2021-

25

Unit-1 Steam Generator Riser Barrel Repair

5/16/21

Miscellaneous

03-9315755

Steam Generator Tube - Rolled Tube Plug & Stabilizer

Installation (ZR) Field Procedure

5/11/21

1R30 Probe Noise

Limits and Actual

Plots, CERTREC

No. 66

SG"C"-PP-Dents, SG"A"- Bobbin-AVB, SG"C" Array-TS-CF

5/13/21

I.D. Code J6276

Certificate of Personnel Qualification, Level III-QDA

Exp. 7/28/21

ID: B2687 NDE

Examiner

Supplemental NDE Personnel Certification Review Checklist

3/31/21

PPI-AA-100-1004,

Self-Assessment, Steam Generator Program

June 2017

SURRY-ETSS1-

BOBBIN

Surry Unit-1, Outage 1R30, Examination Technique

Specification Sheet

5/1/21

TS 6.4-11

Steam Generator (SG) Program, Tech Spec

1/28/13

NDE Reports

MT-21-002

Magnetic Particle Examination of Weld 2-10

05/05/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

MT-21-003

Magnetic Particle Examination of Weld 1-01

05/14/2021

UT-21-007

Ultrasonic Examination of Weld 2-10

05/15/2021

UT-21-024

Ultrasonic Examination of Weld 1-A02

05/15/2021

UT-21-047

Ultrasonic Examination of CRD-54

05/18/2021

UT-21-047

Ultrasonic Examination of CRD-54

05/18/2021

VE-21-001

Reactor Vessel Upper Head Bare Metal Visual Examination

05/13/2021

Procedures

Doc. ID No.: 03-

9315755

Steam Generator Tube, Rolled Tube Plug & Stabilizer

Installation Field Procedure (Completed)

5/11/21

ER-AA-NDE-MT-

200

Dry Magnetic Particle Examination Procedure Using Yokes

ER-AA-NDE-UT-

2

Ultrasonic Examination of Ferritic Vessel Welds Greater Than

2.0" in Thickness

ER-AA-NDE-UT-

703

Ultrasonic Examination of Vessel Welds 2.0" and Less in

Thickness

ER-AA-NDE-VT-

604

Visual Examination (VE) for Leakage of PWR Reactor Head

Penetrations

ER-AP-BAC-101

Boric Acid Corrosion Control Program Inspections

ER-AP-BAC-102

Boric Acid Corrosion Control Program Evaluations

Work Orders

Work Orders (by

Number)

203876808

71111.11Q Procedures

1-GOP-1.4

UNIT STARTUP, HSD TO 2% REACTOR POWER

1-GOP-1.8.1

UNIT STARTUP, RCS HEATUP FROM AMBIENT TO HSD,

WITHOUT MAIN CONDENSER VACUUM

71111.12

Corrective Action

Documents

CA8456277

BADA to RP to clean and provide post cleaning photo of 1-SI-

06/30/2021

CR1170759

Boric Acid on 1-SI-61

04/21/2021

CR1173429

Boric Acid accumulating on 1-SI-61

05/21/2021

Corrective Action

Documents

Resulting from

Inspection

CR1172169 /

CA8474854

Miscellaneous

IQReview Preventive Maintenance Database Main Steam

Safety Valve Maintenance Strategy

Procedures

1-OPT-FW-002

Motor Driven Aux Feedwater Pump 1-FW-P-3B Operations

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Periodic Test

Work Orders

WO38204205847

Open and Inspect Check Valve 01-SI-61CKVALV

04/21/2021

71111.13

Miscellaneous

Shutdown Risk Plan for Reactor Head Lift on May 1, 2021

Shutdown Risk Review for May 27, 2021

Procedures

NF-AA-PRA-370

Probabilistic Risk Assessment Procedures and Methods:

MRule (a)(4) Risk Monitor Guidance

71111.18

Corrective Action

Documents

CR1172203

CR1172021

Work Orders

204220592

204220593

71111.19

Corrective Action

Documents

CR1173652,

CR1169711,

CR1169718,

CR1169724,

CR1169726,

CR1170404,

CR1170743

71111.20

Drawings

11448-FM-072C

SH-004

Component Cooling Water

Miscellaneous

1R30 Unit 1

Refueling Outage

Risk Plan

1R30 Unit 1 Refueling Outage Risk Plan

Procedures

1-GOP-2.1

UNIT SHUTDOWN, POWER DECREASE FROM

ALLOWABLE POWER TO LESS THAN 30% REACTOR

POWER

1-GOP-2.2

UNIT SHUTDOWN, LESS THAN 30% TO HSD

1-GOP-2.4

UNIT COOLDOWN, HSD TO 351°F

1-GOP-2.5

UNIT COOLDOWN, 351°F TO LESS THAN 205°F

1-MCM-1150-01

UNIT ONE REACTOR DISASSEMBLY AND REASSEMBLY

1-OP-FH-001

CONTROLLING PROCEDURE FOR REFUELING

1-OP-RC-004

DRAINING THE RCS TO REACTOR FLANGE LEVEL

1-OP-RH-001

RHR OPERATIONS

GMP-001

HEAVY LOAD RIGGING AND MOVEMENT

71114.06

Miscellaneous

Surry Power Station Emergency Preparedness Drill Plan

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

executed on March 30, 2021

Surry Power Station Emergency Preparedness Drill Plan

executed on June 22, 2021

71124.01

Corrective Action

Documents

CRs 1150851,

1150892,

1162330, and

1166682

Corrective Action Program documents related to radiological

hazards and controls

Various

Procedures

RP-AA-226

Alpha Monitoring

RP-AA-230

Personnel Contamination Monitoring and Decontamination

Radiation Surveys Radiological

Survey no. 157

Unit 1 Containment - Incore Sump Room

04/27/2021

71124.02

ALARA Plans21-016

U1R30 - Primary Steam Generator Eddy Current ALARA

Review

03/24/2021

Calculations

2019 Online Dose

2019 Online Department Exposure Status

01/01/2020

20 Online Dose

20 Online Department Exposure Status

01/01/2021

21 Online Dose

ALARA Monthly Dose Projections (by Department)

01/01/2021

RWP 21-2111

TEDE ALARA Review

03/15/2021

RWP 21-2112

TEDE ALARA Review

03/15/2021

RWP 21-2502

TEDE ALARA Review

03/15/2021

TSR 21-0026

Unit 1 Equipment Hatch Personnel Monitoring Building (RP

exit monitor background reduction)

04/08/2021

Corrective Action

Documents

CR1169120,

CR1160457,

CR1160091,

CR1158743,

CR1153985,

CR1152548,

CR1147993,

CR1143230,

CR1128311,

CR1124687,

CR1107655,

CR1106998,

CR1105811, and

ALARA related CAP documents

Various

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CR1102738

Drawings

Temporary

Shielding Request

(TSR)21-012

Unit 1 Fuel building transfer tube gap (45" elevation)

04/08/2021

TSR 21-001

Shield wall for radiation monitor 1-RM-RMS-159/160,

Containment Atmosphere Radiation Monitor

04/08/2021

Miscellaneous20-003

50% Work in Progress Review (WIPR) for RWP 20-3111,

U2R29 Reactor Disassembly

05/08/2020

20-009

80% WIPR for RWP 20-3111, U2R29 Reactor Disassembly

05/16/2020

20-019

50% WIPR for ALARA Plan 20-003

05/24/2020

U1R29 RFO

Surry Unit 1 ALARA Refueling Outage Report (Fall 2019)

01/09/2020

U2R29 RFO

Surry Unit 2 ALARA Refueling Outage Report (Spring 2020)

06/29/2020

Procedures

RP-AA-1

Nuclear Fleet Policy - RADIOLOGICAL SAFETY

08/04/2015

RP-AA-103

ALARA Program

RP-AA-111

Monitoring and Improving Radiological Performance

RP-AA-111-1003

ALARA Program Review

RP-AA-300

ALARA Reviews and Reports

RP-AP-1001

Source Term Reduction and Control

RP-SU-101-1000

Health Physics Operations: Department Standards

VPAP-2105

Temporary Shielding Program

Radiation Surveys

Unit 1 Containment Transfer Canal, water level just below the

transfer cart tracks - AMP -100 Survey prior to entry.

04/27/2021

Self-Assessments Audit 20-06

Radiation Protection, Process Control Program, and

Chemistry

09/16/2020

71152

Corrective Action

Documents

Resulting from

Inspection

CR1172184,

CR1172065,

CR1172598,

CR1175926,

CA8483490

Procedures

CM-AA-FPA-100

Fire Protection/Appendix R (Fire Safe Shutdown) Program

CM-AA-FPA-101

Control of Combustible and Flammable Materials

CM-AA-FPA-102

Fire Protection and Fire Safe Shutdown Review and

Preparation Process and Design Change Process

10