Report 22 - Surry Inspection/Activity Plan, 09/01/2011 - 12/31/2012
ML112440107
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/01/2011
From:
Division Reactor Projects II
To:
Shared Package
ML112440101 List:
References
IR-11-006
Download: ML112440107 (2)


Text

Page 1 of 2 Surry 09/01/2011 06:29:12 Inspection / Activity Plan Report 22 09/01/2011 - 12/31/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - PUBLIC RADI PROTECTION BASELINE WEEK1 4 1, 2 10/03/2011 10/07/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/03/2011 10/07/2011 IP 71124.04 Occupational Dose Assessment 1, 2 10/03/2011 10/07/2011 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 10/03/2011 10/07/2011 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 10/03/2011 10/07/2011 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 10/03/2011 10/07/2011 IP 71151 Performance Indicator Verification PSB1-RP - PUBLIC RAD SAFETY WEEK2 -INSTRUMENTS 1 1, 2 10/10/2011 10/14/2011 IP 71124.05 Radiation Monitoring Instrumentation CDBI - COMPONENT DESIGN BASES INSPECTION 8 1, 2 10/24/2011 10/28/2011 IP 7111121 Component Design Bases Inspection 1, 2 11/14/2011 11/18/2011 IP 7111121 Component Design Bases Inspection 1, 2 11/28/2011 12/02/2011 IP 7111121 Component Design Bases Inspection 1, 2 12/12/2011 12/16/2011 IP 7111121 Component Design Bases Inspection PSB1-RP - OCCUPATIONAL RP BASELINE WK1 3 1, 2 04/23/2012 04/27/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 04/23/2012 04/27/2012 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 04/23/2012 04/27/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/23/2012 04/27/2012 IP 71124.04 Occupational Dose Assessment 1, 2 04/23/2012 04/27/2012 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 04/23/2012 04/27/2012 IP 71151 Performance Indicator Verification EB3-LR - UNIT 1 POST APPROVAL LR - PHASE 1 1 1 04/30/2012 04/30/2012 IP 71003 Post-Approval Site Inspection for License Renewal EB3 ISI - UNIT 1 INSERVICE INSPECTION 1 1 04/30/2012 05/04/2012 IP 7111108P Inservice Inspection Activities - PWR LR - SURRY 1 LR 2 1 04/30/2012 05/04/2012 IP 71003 Post-Approval Site Inspection for License Renewal 7111108 - SUR 1 SGISI 1 1 05/07/2012 05/11/2012 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - OCCUPATIONAL RP BASELINE WK2 3 1, 2 05/14/2012 05/18/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 05/14/2012 05/18/2012 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 05/14/2012 05/18/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 05/14/2012 05/18/2012 IP 71124.04 Occupational Dose Assessment 1, 2 05/14/2012 05/18/2012 IP 71124.05 Radiation Monitoring Instrumentation This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Surry 09/01/2011 06:29:12 Inspection / Activity Plan Report 22 09/01/2011 - 12/31/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - OCCUPATIONAL RP BASELINE WK2 3 1, 2 05/14/2012 05/18/2012 IP 71151 Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 1, 2 07/09/2012 07/13/2012 IP 7111402 Alert and Notification System Testing 1, 2 07/09/2012 07/13/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 07/09/2012 07/13/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 07/09/2012 07/13/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 07/09/2012 07/13/2012 IP 71151 Performance Indicator Verification SUR TFPI - TRIENNIAL FIRE PROTECTION INSPECTION 9 1, 2 07/30/2012 08/03/2012 IP 7111105P Fire Protection-NFPA 805 Transition Period [Triennial]

1, 2 08/13/2012 08/17/2012 IP 7111105P Fire Protection-NFPA 805 Transition Period [Triennial]

OL EXAM - INITIAL EXAM PREP 3 1 07/23/2012 07/27/2012 V23377 SURRY / AUGUST 2012 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 3 1 08/13/2012 08/17/2012 V23377 SURRY / AUGUST 2012 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 3 1 08/20/2012 08/24/2012 V23377 SURRY / AUGUST 2012 EXAM AT POWER FACILITIES MODS - MODIFICATIONS INSPECTION 4 1, 2 10/09/2012 10/12/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2 10/22/2012 10/26/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications EB3 ISI - UNIT 2 INSERVICE INSPECTION 1 2 11/05/2012 11/09/2012 IP 7111108P Inservice Inspection Activities - PWR EB3SGISI - UNIT 2 SG INSERVICE INSPECTION 1 2 11/12/2012 11/16/2012 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.