IR 05000280/2017005

From kanterella
Jump to navigation Jump to search
Updated Inspection Plan for Surry Power Station, Units 1 and 2 - Report 05000280/2017005 and 05000281/2017005
ML17233A198
Person / Time
Site: Surry  Dominion icon.png
Issue date: 08/21/2017
From: Masters A
NRC/RGN-II/DRP/RPB5
To: Stoddard D
Virginia Electric & Power Co (VEPCO)
References
IR 2017005
Download: ML17233A198 (5)


Text

August 21, 2017

SUBJECT:

UPDATED INSPECTION PLAN FOR SURRY POWER STATION,

UNITS 1 AND 2 - REPORT 05000280/2017005 AND 05000281/2017005

Dear Mr. Stoddard:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Surry Power Station, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available, correspondence.

Additionally, the NRC plans on conducting two non-ROP baseline inspections which include an initial license examination and Post Approval License Renewal Phase 4.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. Please contact me at 404-997-4465 with any questions you may have regarding this letter.

Sincerely,

/RA/

Anthony D. Masters, Chief

Reactor Projects Branch 5

Division of Reactor Projects

Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37

Enclosure:

Surry Inspection / Activity Plan (09/01/2017 - 06/30/2019)

ML OFFICE RII/DRP RII/DRP RII/DRP

NAME BBishop SNinh AMasters

DATE 8/15/2017 8/15/2017 8/ 21/2017

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Surry Inspection / Activity Plan 09/01/2017 - 06/30/2019 Page 1 of 2 08/21/2017 10:02:36 DBAI

- DESIGN BASES ASSURANCE INSPECTION (TEAM)

1, 2 IP Design Bases Assurance Inspection (Teams)

7111121M 08/28/2017 09/01/2017 OL EXAM

- INITIAL LICENSE EXAM PREP

1 SURRY OCTOBER 2017 INITIAL EXAM AT POWER FACILITIES V23502 10/02/2017 10/06/2017 OL EXAM

- INITIAL LICENSE EXAM

1 SURRY OCTOBER 2017 INITIAL EXAM AT POWER FACILITIES V23502 10/30/2017 11/10/2017 RP

- RP PUBLIC BASELINE INSPECTION

1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 11/27/2017 12/01/2017 1, 2 IP Radiological Environmental Monitoring Program 71124.07 11/27/2017 12/01/2017 1, 2 IP Performance Indicator Verification 71151 11/27/2017 12/01/2017 TFPI

- TRIENNIAL FIRE PROTECTION INSPECTION

1, 2 IP Fire Protection [Triennial]

7111105T 02/26/2018 03/01/2018 1, 2 IP Fire Protection [Triennial]

7111105T 03/12/2018 03/16/2018 EP

- EP PROGRAM INSPECTION

1, 2 IP Alert and Notification System Testing 7111402 04/09/2018 04/13/2018 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 04/09/2018 04/13/2018 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 04/09/2018 04/13/2018 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 04/09/2018 04/13/2018 1, 2 IP Performance Indicator Verification 71151 04/09/2018 04/13/2018 ISI

- UNIT 1 IN-SERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 04/30/2018 05/04/2018 SGISI

- UNIT 1 SG IN-SERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 04/30/2018 05/04/2018 EQI

- DESIGN BASES ASSURANCE INSPECTION (PROGR

1, 2 IP Design Bases Assurance Inspection (Programs)

7111121N 06/18/2018 06/22/2018 1, 2 IP Design Bases Assurance Inspection (Programs)

7111121N 07/09/2018 07/13/2018 1, 2 IP Design Bases Assurance Inspection (Programs)

7111121N 07/23/2018 07/27/2018 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION

1, 2 IP Problem Identification and Resolution 71152B 09/10/2018 09/14/2018 1, 2 IP Problem Identification and Resolution 71152B 09/23/2018 09/27/2018 ISI

- UNIT 2 IN-SERVICE INSPECTION

2 IP Inservice Inspection Activities - PWR 7111108P 11/05/2018 11/09/2018 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Surry Inspection / Activity Plan 09/01/2017 - 06/30/2019 Page 2 of 2 08/21/2017 10:02:36 RP

- RP OCCUPATIONAL - WEEK 1

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/05/2018 11/09/2018 1, 2 IP Occupational ALARA Planning and Controls 71124.02 11/05/2018 11/09/2018 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/05/2018 11/09/2018 1, 2 IP Occupational Dose Assessment 71124.04 11/05/2018 11/09/2018 1, 2 IP Radiation Monitoring Instrumentation 71124.05 11/05/2018 11/09/2018 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 11/05/2018 11/09/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 11/05/2018 11/09/2018 SGISI

- UNIT 2 SG IN-SERVICE INSPECTION

2 IP Inservice Inspection Activities - PWR 7111108P 11/05/2018 11/09/2018 RP

- RP OCCUPATIONAL - WEEK 2

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/26/2018 11/30/2018 1, 2 IP Occupational ALARA Planning and Controls 71124.02 11/26/2018 11/30/2018 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/26/2018 11/30/2018 1, 2 IP Occupational Dose Assessment 71124.04 11/26/2018 11/30/2018 1, 2 IP Radiation Monitoring Instrumentation 71124.05 11/26/2018 11/30/2018 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 11/26/2018 11/30/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 11/26/2018 11/30/2018 LR

- POST-APPROVAL LR PHASE 4

1, 2 IP Post-Approval Site Inspection for License Renewal 71003 01/28/2019 02/01/2019 MODS

- EVALUATIONS OF CHANGES, TESTS AND EXPERI

1, 2 IP Evaluations of Changes, Tests, and Experiments 7111117T 04/22/2019 04/26/2019 RP

- RP PUBLIC

1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 05/20/2019 05/24/2019 1, 2 IP Radiological Environmental Monitoring Program 71124.07 05/20/2019 05/24/2019 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 05/20/2019 05/24/2019 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 05/20/2019 05/24/2019 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.