Mid Cycle Assessment Letter
ML13246A135
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/03/2013
From: Gerald Mccoy
NRC/RGN-II/DRP/RPB5
To: Heacock D
Virginia Electric & Power Co (VEPCO)
References
IR-13-006
Download: ML13246A135 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 3, 2013 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Dominion Nuclear Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

MID-CYCLE LETTER FOR SURRY POWER STATION UNITS 1 AND 2 - NRC ASSESSMENT REPORT 05000280, 281/2013006

Dear Mr. Heacock:

On August 15, 2013, the NRC completed its mid-cycle performance review of Surry Power Station Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2012, through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined the performance at Surry Power Station Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2014.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

D. Heacock 2 We also plan on conducting two non-ROP inspections which include: Temporary Instruction (TI) 2515/182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping - Phase 2 and an Operating License Initial Exam.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4551 with any questions you may have regarding this letter.

Sincerely,

/RA/

Gerald J. McCoy, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37

Enclosure:

Surry Inspection/Activity Plan (09/01/2013 - 12/31/2014) cc: Distribution via Listserv

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE SON /RA/ GJM /RA/

NAME SNinh GMcCoy DATE 08/27/2013 08/27/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO D. Heacock 3 Letter to David A. Heacock from Gerald J. McCoy dated September 3, 2013

SUBJECT:

MID-CYCLE LETTER FOR SURRY POWER STATION UNITS 1 AND 2 - NRC ASSESSMENT REPORT 05000280, 281/2013006 DISTRIBUTION:

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSurry Resource Institute of Nuclear Power Operations (INPO)

ROP Reports

Page 1 of 2 Surry 09/03/2013 08:11:14 Inspection / Activity Plan Report 22 09/01/2013 - 12/31/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ISI - UNIT 1 INSERVICE INSPECTION 2 1 10/28/2013 11/01/2013 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 1 SG INSERVICE INSPECTION 1 1 11/04/2013 11/08/2013 IP 7111108P Inservice Inspection Activities - PWR TI-182 - TI-182 BURIED PIPING/TANK - PHASE 2 1 1, 2 01/27/2014 01/29/2014 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 04/28/2014 05/02/2014 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL BASELINE 2 1, 2 04/28/2014 05/02/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 04/28/2014 05/02/2014 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 04/28/2014 05/02/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/28/2014 05/02/2014 IP 71124.04 Occupational Dose Assessment 1, 2 04/28/2014 05/02/2014 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 04/28/2014 05/02/2014 IP 71151 Performance Indicator Verification SGISI - UNIT 2 SG IN-SERVICE INSPECTION 1 2 05/05/2014 05/09/2014 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL BASELINE WEEK2 3 1, 2 05/12/2014 05/16/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 05/12/2014 05/16/2014 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 05/12/2014 05/16/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 05/12/2014 05/16/2014 IP 71124.04 Occupational Dose Assessment 1, 2 05/12/2014 05/16/2014 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 05/12/2014 05/16/2014 IP 71151 Performance Indicator Verification OL EXAM - INITIAL LICENSE EXAM PREP 3 1 07/14/2014 07/18/2014 V23429 SURRY/AUGUST 2014 INITIAL EXAM AT POWER FACILITIES CDBI - COMPONENT DESIGN BASES INSPECTION 6 1, 2 07/28/2014 08/01/2014 IP 7111121 Component Design Bases Inspection 1, 2 08/18/2014 08/22/2014 IP 7111121 Component Design Bases Inspection 1, 2 09/08/2014 09/12/2014 IP 7111121 Component Design Bases Inspection 1, 2 09/22/2014 09/26/2014 IP 7111121 Component Design Bases Inspection EP - EP PROGRAM INSPECTION 1 1, 2 08/04/2014 08/08/2014 IP 7111402 Alert and Notification System Testing This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Surry 09/03/2013 08:11:14 Inspection / Activity Plan Report 22 09/01/2013 - 12/31/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP - EP PROGRAM INSPECTION 1 1, 2 08/04/2014 08/08/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 08/04/2014 08/08/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 08/04/2014 08/08/2014 IP 71151 Performance Indicator Verification HS - TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 08/04/2014 08/08/2014 IP 7111107T Heat Sink Performance OL EXAM - INITIAL LICENSE EXAM WEEK 1 3 1 08/11/2014 08/15/2014 V23429 SURRY/AUGUST 2014 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL LICENSE EXAM WEEK 2 3 1 08/18/2014 08/22/2014 V23429 SURRY/AUGUST 2014 INITIAL EXAM AT POWER FACILITIES Comments:

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure