February 9, 2021

SUBJECT:

SURRY POWER STATION, UNIT 1 & 2 - SECURITY BASELINE INSPECTION REPORT 05000280/2021401 AND 05000281/2021401

Dear Mr. Stoddard:

On January 29, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Surry Power Station, Unit 1 & 2 and discussed the results of this inspection with Mr. D.

Lawrence and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

James C. Shehee, Chief Plant Support Branch

Division of Reactor Safety Docket Nos. 05000280 and 05000281 License Nos. DPR-32 and DPR-37

Enclosure:

As stated

REGION II==

INSPECTION REPORT

Enclosure

Docket Numbers:

05000280 and 05000281

License Numbers:

DPR-32 and DPR-37

Report Numbers:

05000280/2021401 and 05000281/2021401

Enterprise Identifier: I-2021-401-0024

Licensee:

Virginia Electric and Power Company

Facility:

Surry Power Station, Unit 1 & 2

Location:

Surry, VA

Inspection Dates:

January 11, 2021 to January 13, 2021 (Dominion Corporate Office)

January 27, 2021 to January 29, 2021(Surry Onsite)

Inspectors:

R. Patterson, Physical Security Inspector

J. Justice, Senior Physical Security Inspector

Approved By:

James C. Shehee, Chief Plant Support Branch Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Surry Power Station, Unit 1 & 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

REPORT DETAILS

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin teleworking. The inspection documented below was completed through a combination of remote and on-site inspection.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were evaluated:

(1)

  • Tier I: All requirements
  • Tier II: None
  • Tier III: 02.09

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following inspection elements:

(1)

  • Tier I: All Requirements
  • Tier II: None
  • Tier III: 02.09, 02.10 (a)

71130.08 - Fitness For Duty Program

The inspectors evaluated the fitness for duty program by completing the following inspection elements:

(1)

  • Tier I: All Requirements
  • Tier II: 02.05(a, d, e, h, i, j, k, l), 02.06(b, d, e, f, g), 02.07(a, c, d)
  • Tier III: 02.10, 02.11(a)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

(1) Security Plan Revisions 32, 33, 34, and 35 were implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 03.17) (1 Sample)

The inspectors verified licensee performance indicators submittal listed below:

(1) January 2020 - January,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On January 29, 2021, the inspectors presented the security baseline inspection results to Mr. D. Lawrence and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.01

Corrective Action

Documents

1088855

1092847

1139928

1140043

20-1139995

20-1142031

Procedures

SY-AA-115

Personnel Processing and Access to Station Facilities

SY-AA-UAA-101

Unescorted Access Authorization Program

SY-AA-UAA-102

Personally Identifiable Information Breach Incident Response

Plan

Self-Assessments

Dominion Fleet AA and FFD Nuclear Oversight Audit

4/6/20

PIR1137794

Access Services Self-Assessment

2/19/2019

71130.02

Corrective Action

Documents

20-1144011

20-1147068

20-1147408

20-1152998

20-1155012

Procedures

SY-AA-106

Control of Safeguards Information, Security-Related

Information, and Controlled Unclassified Information

SY-AA-106

Control of Safeguards Information, Security-Related

Information, and Controlled Unclassified Information

SY-AA-116

Maintenance, Testing, and Calibration

SY-AA-117

Search Program

SY-AA-118

Owner Controlled Area Access Control

Self-Assessments Security Audit 19-

2/25/2019

71130.08

Corrective Action

Documents

20-1139928

Miscellaneous

Fleet Behavior Observation Program Training and KAs

Procedures

SY-AA-FFD-101

Fitness for Duty Program

SY-AA-FFD-102

Fitness for Duty Program Administration

71130.08

Procedures

SY-AA-FFD-103

Drug and Alcohol Collection

SY-AA-FFD-104

Drug and Alcohol Testing Program Administration

SY-AA-FFD-105

Fitness for Duty Onsite Testing

SY-AA-FFD-106

Fitness for Duty Testing Blind Proficiency Sample Processing 2

71130.09

Miscellaneous

Surry Security Plan

Surry Security Plan

Surry Security Plan

Surry Security Plan

50.54 (p) Change Submittal letter Dominion Energy Surry

Power Station

03/16/2020

50.54 (p) Change Submittal letter Dominion Energy Surry

Power Station

10/20/2020

50.54 (p) Change Submittal letter Dominion Energy Surry

Power Station

2/09/2020

71151

Procedures

SY-AA-126

Regulatory Assessment Performance Indicator Data

Reporting

1