Category:Meeting Notice
MONTHYEARPMNS20241176, Pre-submittal Meeting with Dominion Energy Regarding a Planned License Amendment Request for North Anna Power Station and Surry Power Station to Revise Selected Alternate Source Term Dose Consequence Analyses2024-09-23023 September 2024 Pre-submittal Meeting with Dominion Energy Regarding a Planned License Amendment Request for North Anna Power Station and Surry Power Station to Revise Selected Alternate Source Term Dose Consequence Analyses PMNS20240860, Pre-submittal Meeting with Dominion Energy Regarding a Planned Fleet License Amendment Request for Selected Sites to Modify Moderator Temperature Coefficient (Mtc) Technical Specifications (Tss)2024-07-0303 July 2024 Pre-submittal Meeting with Dominion Energy Regarding a Planned Fleet License Amendment Request for Selected Sites to Modify Moderator Temperature Coefficient (Mtc) Technical Specifications (Tss) PMNS20240556, Annual Assessment Meeting Surry Power Station Annual Assessment Meeting2024-04-18018 April 2024 Annual Assessment Meeting Surry Power Station Annual Assessment Meeting PMNS20240052, Public Meeting to Receive Comments on the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station Units 1 and 2, Subsequent License Renewal Application2024-01-16016 January 2024 Public Meeting to Receive Comments on the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station Units 1 and 2, Subsequent License Renewal Application PMNS20240058, Public Meeting to Receive Comments on the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station Units 1 and 2, Subsequent License Renewal Application2024-01-12012 January 2024 Public Meeting to Receive Comments on the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station Units 1 and 2, Subsequent License Renewal Application PMNS20231323, Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 22023-11-27027 November 2023 Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 2 PMNS20230615, Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 22023-05-11011 May 2023 Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 2 PMNS20230430, Assessment Meetingsurry Power Station Annual Assessment Meeting2023-04-13013 April 2023 Assessment Meetingsurry Power Station Annual Assessment Meeting PMNS20220349, Assessment Meetingsurry Power Station Annual Assessment Meeting2022-04-0404 April 2022 Assessment Meetingsurry Power Station Annual Assessment Meeting PMNS20220318, Public Meeting with the Dominion Energy to Discuss a Planned Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station2022-03-29029 March 2022 Public Meeting with the Dominion Energy to Discuss a Planned Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station PMNS20211316, Public Meeting to Discuss Proposed Revisions to Regulatory Guide (RG) 1.201, an Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities2021-10-0707 October 2021 Public Meeting to Discuss Proposed Revisions to Regulatory Guide (RG) 1.201, an Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities PMNS20211125, Preliminary Results of the NRC Staff'S Environmental Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application2021-08-27027 August 2021 Preliminary Results of the NRC Staff'S Environmental Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application PMNS20211128, Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - an Inconsistency in Documentation Regarding Reactor Coolant Pump Code Case N 481, TLAA 4.7.62021-08-26026 August 2021 Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - an Inconsistency in Documentation Regarding Reactor Coolant Pump Code Case N 481, TLAA 4.7.6 PMNS20211071, Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - Safety Issue - Cyclic Fatigue2021-08-13013 August 2021 Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - Safety Issue - Cyclic Fatigue PMNS20210778, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined2021-06-23023 June 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined PMNS20210777, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined2021-06-15015 June 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined PMNS20210781, Notice of Forthcoming Meeting with Nextera/Florida Power and Light (FPL) Regarding the Conversion of Turkey Point Nuclear Generating Station, Units 3 and 4, and St. Lucie Plant, Units 1 and 2 to Improved Technical Specifications2021-06-10010 June 2021 Notice of Forthcoming Meeting with Nextera/Florida Power and Light (FPL) Regarding the Conversion of Turkey Point Nuclear Generating Station, Units 3 and 4, and St. Lucie Plant, Units 1 and 2 to Improved Technical Specifications PMNS20210669, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application2021-06-0101 June 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application PMNS20210666, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application2021-05-27027 May 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application PMNS20210548, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application2021-05-12012 May 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application PMNS20210382, the U.S. Nuclear Regulatory Commission (NRC) Will Hold a Webinar to Discuss the Nrc'S Assessment of Safety Performance at the V. C. Summer, North Anna and Surry Power Stations for 20202021-04-12012 April 2021 the U.S. Nuclear Regulatory Commission (NRC) Will Hold a Webinar to Discuss the Nrc'S Assessment of Safety Performance at the V. C. Summer, North Anna and Surry Power Stations for 2020 PMNS20210079, Closed Meeting with Dominion Nuclear to Discuss Force on Force Exercises2021-01-22022 January 2021 Closed Meeting with Dominion Nuclear to Discuss Force on Force Exercises PMNS20201188, Environmental Scoping Meeting Related to the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application2020-10-28028 October 2020 Environmental Scoping Meeting Related to the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML14065A4932014-03-0606 March 2014 March 20, 2014 - Notice of Category 3 Public Meeting/Open House Regarding North Anna Power Station, Units 1 and 2, Annual Assessment ML13136A0562013-05-16016 May 2013 7/23-24/2013 Notice of Public Meeting Announcement with All Region II Licensees, Initial Examination Writers' Workshop ML13109A1992013-04-19019 April 2013 Notice of Public Meeting/Open House Regarding North Anna Power Station, Units 1 and 2, Annual Assessment ML12221A2612012-08-0707 August 2012 09/25-26/2012 Noticeo of Meeting Announcement - 2012 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers' Workshop ML12100A1892012-04-0909 April 2012 Notice of Meeting to Provide an Open Forum to Discuss the NRC Reactor Oversight Process and the Annual Assessment of the North Anna Power Station for the Calendar Year 2011 ML12093A2282012-04-0202 April 2012 Notice of Regulatory Conference with Virginia Electric Power Company (VEPCO) to Discuss One Apparent Violation (AV) of Technical Specification (TS) 5.4.1.A Associated with the Unit 2 H (2H) Emergency Diesel Generator Gasket Failure ML12018A2282012-01-19019 January 2012 G20110757/EDATS: OEDO-2011-0701 - Forthcoming Meeting with the Petitioners, Beyond Nuclear Et Al., Requesting Action Under 10 CFR 2.206 Regarding Suspension of the Operating Licenses for North Anna Power Station (NAPS) Due to Concerns About ML11326A0172011-11-28028 November 2011 Notice of Meeting with the Petitioners, Beyond Nuclear Et Al., Requesting Action Under 10 CFR 2.206 Regarding Suspension of the Operating Licenses for Naps Due to Concerns About Damage to the NAPS Reactors from the August 23, 2011, Earthqua ML1129911352011-10-26026 October 2011 Updated Meeting Announcement - Public Meeting North Anna Power Station ML1129305342011-10-20020 October 2011 Meeting Announcement - Public Meeting - North Anna Power Station ML1125800092011-09-14014 September 2011 Announcement of Public Meeting to Discuss the Results of an Augmented Team Inspection of an Earthquake Event on August 23, 2011 at the North Anna Power Station ML12047A2222011-09-0707 September 2011 Email From. S. Burnell, OPA to R. Martin, NRR North Anna Meeting on Seismic ML11249A1562011-09-0707 September 2011 Notice of Forthcoming Meeting with Virginia Electric and Power Company (Vepco), on the August 23, 2011 Earthquake Near the North Anna Power Station, Unit Nos. 1 and 2 ML12047A2202011-09-0707 September 2011 Email from R. Martin, NRR to L. Lund, NRR Et Al. FW: North Anna Meeting on Seismic ML1115403882011-06-0202 June 2011 08/02-03/2011 Meeting Announcement - 2011 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers Workshop ML1107006992011-03-11011 March 2011 Notice of Category 3 Public Meeting Regarding Annual Assessment of North Anna Power Station ML1030903552010-11-0505 November 2010 Meeting Announcement - Public Meeting - North Anna, to Provide Open Public Forum to Discuss Recent Discovery and Remediation of Containment Insulation Issues ML1023100152010-08-18018 August 2010 Notice of Meeting with Virginia Electric & Power to Discuss Proposed Addition of Analytical Methodology to Core Operating Limits Report ML1017304812010-06-22022 June 2010 Forthcoming Meeting with Virginia Electric and Power Company (Vepco), Regarding North Anna Power Station, Unit Nos. 1 and 2 to Discuss Fuel Transition Licensing Approach, Schedule of Submittals, Alignment of Resources and Key Deliverables ML1015501432010-06-0404 June 2010 08/17-18/2010 Meeting Announcement - 2010 NRC Initial Exam Writers Workshop ML1012600302010-05-0505 May 2010 Summary of Public Meeting to Discuss the NRC Reactor Oversight Process and the Annual Assessment of the North Anna Power Station ML1010501482010-04-15015 April 2010 Notice of Public/Open House Meeting with Virginia Electric and Power Company to Discuss Reactor Oversight Process and the Annual Assessment of North Anna Power Station ML0918004532009-06-29029 June 2009 Meeting Announcement - Category 2 Public Meeting, 2009 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Development Workshop ML0915605552009-06-0808 June 2009 Notice of Meeting with Virginia Electric and Power Co. (Dominion) to Discuss a Proposed License Amendment Regarding the Emergency Core Cooling System (ECCS) Pump Room Exhaust Air Cleanup System ML0908302472009-03-23023 March 2009 Notice of Category 1 Public Meeting Public Meeting with North Anna, Units 1 & 2 to Discuss Annual Assessment ML0819600282008-07-11011 July 2008 08/05-06/2008-Notice of Meeting - 2008 Us Nuclear Regulatory Commission Initial Examination Development Workshop ML0818402822008-07-0202 July 2008 Public Meeting Announcement NAPS 2024-09-23
[Table view] Category:Meeting Agenda
MONTHYEARPMNS20241176, Pre-submittal Meeting with Dominion Energy Regarding a Planned License Amendment Request for North Anna Power Station and Surry Power Station to Revise Selected Alternate Source Term Dose Consequence Analyses2024-09-23023 September 2024 Pre-submittal Meeting with Dominion Energy Regarding a Planned License Amendment Request for North Anna Power Station and Surry Power Station to Revise Selected Alternate Source Term Dose Consequence Analyses ML24247A0042024-09-0303 September 2024 SLR Efficiencies Public Meeting - NRC Presentation - September 5, 2024 PMNS20240860, Pre-submittal Meeting with Dominion Energy Regarding a Planned Fleet License Amendment Request for Selected Sites to Modify Moderator Temperature Coefficient (Mtc) Technical Specifications (Tss)2024-07-0303 July 2024 Pre-submittal Meeting with Dominion Energy Regarding a Planned Fleet License Amendment Request for Selected Sites to Modify Moderator Temperature Coefficient (Mtc) Technical Specifications (Tss) PMNS20240556, Annual Assessment Meeting Surry Power Station Annual Assessment Meeting2024-04-18018 April 2024 Annual Assessment Meeting Surry Power Station Annual Assessment Meeting PMNS20240052, Public Meeting to Receive Comments on the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station Units 1 and 2, Subsequent License Renewal Application2024-01-16016 January 2024 Public Meeting to Receive Comments on the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station Units 1 and 2, Subsequent License Renewal Application PMNS20240058, Public Meeting to Receive Comments on the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station Units 1 and 2, Subsequent License Renewal Application2024-01-12012 January 2024 Public Meeting to Receive Comments on the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station Units 1 and 2, Subsequent License Renewal Application PMNS20231323, Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 22023-11-27027 November 2023 Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 2 PMNS20230615, Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 22023-05-11011 May 2023 Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 2 PMNS20230430, Assessment Meetingsurry Power Station Annual Assessment Meeting2023-04-13013 April 2023 Assessment Meetingsurry Power Station Annual Assessment Meeting PMNS20220349, Assessment Meetingsurry Power Station Annual Assessment Meeting2022-04-0404 April 2022 Assessment Meetingsurry Power Station Annual Assessment Meeting PMNS20220318, Public Meeting with the Dominion Energy to Discuss a Planned Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station2022-03-29029 March 2022 Public Meeting with the Dominion Energy to Discuss a Planned Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station ML21341B3982021-12-0707 December 2021 Agenda - North Anna Power Station Units 1 and 2 - Sc - December 15, 2021 PMNS20211316, Public Meeting to Discuss Proposed Revisions to Regulatory Guide (RG) 1.201, an Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities2021-10-0707 October 2021 Public Meeting to Discuss Proposed Revisions to Regulatory Guide (RG) 1.201, an Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities PMNS20211125, Preliminary Results of the NRC Staff'S Environmental Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application2021-08-27027 August 2021 Preliminary Results of the NRC Staff'S Environmental Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application PMNS20211128, Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - an Inconsistency in Documentation Regarding Reactor Coolant Pump Code Case N 481, TLAA 4.7.62021-08-26026 August 2021 Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - an Inconsistency in Documentation Regarding Reactor Coolant Pump Code Case N 481, TLAA 4.7.6 PMNS20211071, Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - Safety Issue - Cyclic Fatigue2021-08-13013 August 2021 Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - Safety Issue - Cyclic Fatigue PMNS20210778, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined2021-06-23023 June 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined PMNS20210777, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined2021-06-15015 June 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined PMNS20210781, Notice of Forthcoming Meeting with Nextera/Florida Power and Light (FPL) Regarding the Conversion of Turkey Point Nuclear Generating Station, Units 3 and 4, and St. Lucie Plant, Units 1 and 2 to Improved Technical Specifications2021-06-10010 June 2021 Notice of Forthcoming Meeting with Nextera/Florida Power and Light (FPL) Regarding the Conversion of Turkey Point Nuclear Generating Station, Units 3 and 4, and St. Lucie Plant, Units 1 and 2 to Improved Technical Specifications PMNS20210669, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application2021-06-0101 June 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application PMNS20210666, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application2021-05-27027 May 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application ML21221A1482021-05-27027 May 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides PMNS20210548, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application2021-05-12012 May 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application PMNS20210382, the U.S. Nuclear Regulatory Commission (NRC) Will Hold a Webinar to Discuss the Nrc'S Assessment of Safety Performance at the V. C. Summer, North Anna and Surry Power Stations for 20202021-04-12012 April 2021 the U.S. Nuclear Regulatory Commission (NRC) Will Hold a Webinar to Discuss the Nrc'S Assessment of Safety Performance at the V. C. Summer, North Anna and Surry Power Stations for 2020 PMNS20210079, Closed Meeting with Dominion Nuclear to Discuss Force on Force Exercises2021-01-22022 January 2021 Closed Meeting with Dominion Nuclear to Discuss Force on Force Exercises PMNS20201188, Environmental Scoping Meeting Related to the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application2020-10-28028 October 2020 Environmental Scoping Meeting Related to the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML14065A4932014-03-0606 March 2014 March 20, 2014 - Notice of Category 3 Public Meeting/Open House Regarding North Anna Power Station, Units 1 and 2, Annual Assessment ML12018A2282012-01-19019 January 2012 G20110757/EDATS: OEDO-2011-0701 - Forthcoming Meeting with the Petitioners, Beyond Nuclear Et Al., Requesting Action Under 10 CFR 2.206 Regarding Suspension of the Operating Licenses for North Anna Power Station (NAPS) Due to Concerns About ML11326A0172011-11-28028 November 2011 Notice of Meeting with the Petitioners, Beyond Nuclear Et Al., Requesting Action Under 10 CFR 2.206 Regarding Suspension of the Operating Licenses for Naps Due to Concerns About Damage to the NAPS Reactors from the August 23, 2011, Earthqua ML1127701352011-10-0303 October 2011 Ltr to D. Heacock Re Participation in the Commission Meeting on the North Anna Plant on 10/21/11 ML12047A2222011-09-0707 September 2011 Email From. S. Burnell, OPA to R. Martin, NRR North Anna Meeting on Seismic ML11249A1562011-09-0707 September 2011 Notice of Forthcoming Meeting with Virginia Electric and Power Company (Vepco), on the August 23, 2011 Earthquake Near the North Anna Power Station, Unit Nos. 1 and 2 ML12047A2202011-09-0707 September 2011 Email from R. Martin, NRR to L. Lund, NRR Et Al. FW: North Anna Meeting on Seismic ML1023100152010-08-18018 August 2010 Notice of Meeting with Virginia Electric & Power to Discuss Proposed Addition of Analytical Methodology to Core Operating Limits Report ML0915605552009-06-0808 June 2009 Notice of Meeting with Virginia Electric and Power Co. (Dominion) to Discuss a Proposed License Amendment Regarding the Emergency Core Cooling System (ECCS) Pump Room Exhaust Air Cleanup System ML0730400332007-11-0101 November 2007 Public Meeting Slides for Meeting with Dominion Nuclear ML0726900152007-09-26026 September 2007 Notice of Forthcoming Meeting with Dominion Nuclear to Discuss Proposed Chemical Testing Methods Related to GSI-191, Assessment of Debris Accumulation on PWR Sump Performance, as Proposed by Its Vendor ML0711600042007-04-24024 April 2007 Annual Assessment Meeting Cy 2006 ML0626203902006-09-19019 September 2006 Notice of Meeting with Virginia Electric Power Company (VEPCO) to Discuss Organizational Changes at VEPCO, Etc ML0513100022005-05-10010 May 2005 Notice of Meeting Regarding the plant-specific Implementation of VIPRE-D Topical Report for Dominion, VEPCO, (Surry, North Anna & Millstone) ML0509002902005-04-14014 April 2005 Notice of Meeting Between NRC Staff, Pacific Northwest National Laboratory Staff, and Industry Representatives on Non-Destructive and Destructive Examinations of Nozzles Salvaged from the Discarded North Anna 2 Vessel Head ML0420301852004-07-21021 July 2004 Notice of Meeting with Virginia Electric & Power Company (VEPCO) to Discuss Vepco'S Proposed plant-specific Topical Report That Implements VIPRE-D Code ML0325500192003-09-12012 September 2003 Notice of Meeting with Dominion Regarding Proposed Consolidation of the Quality Assurance Programs for Surry, Units 1 and 2, North Anna, Units 1 and 2, Millstone, Units 2 and 3, Nuclear Plants ML0323002012003-08-18018 August 2003 Notice of Meeting with VEPCO and Framatome to Discuss Fuel Transition Program at North Anna Power Station, Units 1 and 2 ML0305902342003-02-28028 February 2003 Forthcoming Meeting with Virginia Electric Power Co. to Discuss Control Room Habitability Testing ML0205303982002-01-0808 January 2002 Attachment to the 01/08/2002 Mtg with NEI, Southern Nuclear Operating Company (Snc), Florida Power and Light Company (Fpl), Virginia Electric and Power Company (Vepco), Duke Energy Corporation (Duke), and Exelon Generation Company (Exelon) 2024-09-03
[Table view] Category:Memoranda
MONTHYEARML24222A6992024-08-16016 August 2024 August 6, 2024, Summary of Regarding Potential License Amendment Request Change to Surveillance Requirements for Moderator Temperature Coefficient for Millstone, Unit No. 3, North Anna, Unit Nos. 1 and 2, and Summer, Unit No. 1 - ML24089A0632024-03-29029 March 2024 Memorandum from the Secretary Referring Hearing Request to the Atomic Safety and Licensing Board Panel ML24047A2092024-02-22022 February 2024 Calendar Year 2023 Baseline Inspection Completion ML23151A5472023-06-0101 June 2023 Public Meeting Summary - 2022 Annual Assessment Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station ML22130A1702022-05-20020 May 2022 Summary of April 21, 2022, Public Meeting to Discuss Potential Emergency Preparedness License Amendment Request ML22130A0332022-05-0909 May 2022 Public Meeting Summary 2021 Annual Assessment Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station, Docket Nos. 50-280 and 50-281, Meeting Number 20220349 ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML21293A0992021-12-10010 December 2021 Meeting Summary for Draft Supplemental Environmental Impact Statement Public Meeting ML21221A3012021-10-18018 October 2021 June 24, 2021, Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Memo ML21239A0642021-09-0202 September 2021 August 27, 2021, Summary: Discussion Between NRC and Dominion Regarding the NAPS Subsequent License Renewal - an Inconsistency in Documentation Regarding RCP Code Case N-481 (EPID No. L-2020-SLR-0000) - Memo ML21236A0512021-08-27027 August 2021 August 16, 2021, Meeting Summary: Discussion of Aging Management of Cyclic Fatigue in the Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Memo ML21221A0262021-08-26026 August 2021 Meeting Summary Regarding Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application ML21221A1362021-08-10010 August 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application ML21145A2122021-06-0909 June 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Memoranda ML21131A1612021-05-11011 May 2021 Public Meeting Summary - 2020 Annual Assessment Meeting Regarding Virgil C. Summer Nuclear Station, Docket No. 50-395; North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station, Docket Nos. 50-280 and 50-281, Meeting ML21027A0232021-01-28028 January 2021 Summary of January 26, 2021 Closed Meeting with Dominion Energy Regarding Performance of Force on Force Exercises in a Pandemic Environment ML20350B4562020-12-17017 December 2020 Summary of the Historic and Cultural Resources Environmental Audit Meeting Related to the Review of the Subsequent License Renewal Application for the North Anna Power Station, Units 1 and 2 ML20136A1752020-05-15015 May 2020 Sur 2019 Aam Meeting Summary ML19190A2862019-07-16016 July 2019 Summary of July 7, 2019, Public Meeting with Dominion to Discuss Open Phase Condition RAI Responses ML19165A1122019-06-14014 June 2019 Memoranda to File Environmental Assessment and Finding of No Significant Impact for the Virginia Electric and Power Company, Dominion Energy Kewaunee, Inc., and Dominion Nuclear Connecticut, Inc.'S Decommissioning Funding Plans Submitted ML19128A3432019-05-0808 May 2019 Public Meeting Summary - 2018 Annual Assessment Public Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339 ML18151A4682018-05-29029 May 2018 Public Meeting Summary - 2017 Annual Assessment Public Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339 ML17209A7652017-08-0303 August 2017 Fire Protection Input for Millstone Power Station Unit 2 Exemption from Title 10 of the Code of Federal Regulations Part 50, Appendix R, Section Iii.G, Fire Protection of Safe Shutdown Capability, for Use of Operator Manual Actions ML17137A0932017-05-17017 May 2017 Request for Additional Information, Alternative to Reactor Vessel Threads in Flange Examination Requirements ML17123A2092017-05-0303 May 2017 Summary of Meeting to Discuss Annual Assessment of the North Anna Power Station, Units 1 and 2 with the Public for the Period of January 1, 2016 Through December 31, 2016 ML16215A0752016-08-24024 August 2016 North Anna Power Station - Audit Report for Proposed License Amendment to Revise the Technical Specifications to Address the Issue Identified in Westinghouse Documents NSAL-09-5. Rev. 1 and NSAL-15-I ML16209A4132016-07-27027 July 2016 Safety Evaluation For North Anna Power Station, Units 1 And 2, Proposed License Amendment To Revise The Technical Specifications To Address The Issue Identified In Westinghouse Documents NSAL-09-5. Rev. 1 and NSAL-15-I (TAC No. MF7186 and MF7187) ML16139A5892016-05-23023 May 2016 North Anna Trip Report, April 11, 2016 ML16124A7582016-05-0303 May 2016 April 14, 2016, Summer of Public Meeting - North Anna, Units 1 and 2 ML16098A5302016-04-14014 April 2016 Audit Plan - Application for Amendment North Anna Power Station, Units 1 and 2. the Proposed License Amendment Revises the Issues Identified in Westinghouse Documents NSAL-09-5, Rev 1 and NSAL-15-1 ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML15253A4032016-03-11011 March 2016 Recommendation for Dispositioning Proposed Generic Issue on the Effects of Downstream Dam Failures on Nuclear Power Plants ML15281A2672015-10-28028 October 2015 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief ML15232A8112015-08-24024 August 2015 Evaluation of Information Related to Commitments 6 and 8 from Confirmatory Action Letter No. NRR-2011-002 ML15238B5922015-08-17017 August 2015 Review of Commitment Action Completion Confirmation Action Letter Regarding Earthquake in 2011 ML15230A2162015-08-13013 August 2015 Review of Commitment Actions in Confirmatory Action Letter Regarding Earthquake in 2011 ML15128A5462015-05-0808 May 2015 Summary of Public Meeting with North Anna, Units 1 and 2 to Discuss the Annual Assessment with the Public ML14101A1202014-04-11011 April 2014 Public Meeting Summary - North Anna Power Station, Docket Nos. 50-338, 50-339 ML1208704282012-03-26026 March 2012 Memo C Bladey, Adm, Notice of EA and Fonsi - VEPCO, North Anna Power Station (72-1030, 50-338, 50-339, 72-56) ML13127A3682012-03-13013 March 2012 Memo from M. Case to P. Hiland, Subject: Review of Draft Nureg/Cr - Xxxx Entitled, Ultrasonic Phased Array Assessment of the Interference Fit and Leak Path of the North Anna Unit 2 Control Rod Drive Mechanism Nozzle 63 with Destructive Vali ML13219A0462012-03-13013 March 2012 Memo from M. Case to P. Hiland, Subject: Review of Draft NUREG/CR-XXXX Entitled, Ultrasonic Phased Array Assessment of the Interference Fit and Leak Path of the North Anna Unit 2 Control Rod Drive Mechanism Nozzle 63 with Destructive Valida ML11277A0292011-10-0404 October 2011 Summary Audit Report of North Anna Post-Seismic Fuel Inspections ML11271A1782011-10-0303 October 2011 Review of Topical Report, Revision 11 for Kewaunee Power Station and ISFSI, Millstone Power Station, Units 1, 2, & 3 and ISFSI, North Anna Power Station, Units 1 & 2 and ISFSI, Surry Power Station, Units 1 & 2 and ISFSI (Tac ME6649, ME6650, ML12054A1452011-09-19019 September 2011 Email from G. Thomas, NRR to D. Hoang, NRR Et Al. FW: North Anna Seismic Report - Summary Report of August 23/2011 Earthquake Response and Restart Readiness Determination Plan North Anna Power Station Units 1 and 2 and ISFSI ML12053A4082011-09-15015 September 2011 Email from M. Khanna, NRR to K. Karwoski, NRR Et Al. on North Anna Seismic Issue Restart Action Plan Draft Final.Docx ML11249A1562011-09-0707 September 2011 Notice of Forthcoming Meeting with Virginia Electric and Power Company (Vepco), on the August 23, 2011 Earthquake Near the North Anna Power Station, Unit Nos. 1 and 2 ML12005A0302011-08-30030 August 2011 Letter from V. Mccree, Region II to M. Franke, Region II; Augmented Inspection Charter to Evaluate Total Loss of Offsite Power, Dual Unit Reactor Trips and Plant Equipment Issues Following a Seismic Event at North Anna ML11171A7022011-06-29029 June 2011 Final Response to TIA 2011-003, Nine Mile Point Nuclear Station Unit 1 Licensing Basis for Degraded Grid Relay Time Delays ML1027800722010-10-0404 October 2010 Special Inspection Charter 2024-08-16
[Table view] |