Attachment to the 01/08/2002 Mtg with NEI, Southern Nuclear Operating Company (Snc), Florida Power and Light Company (Fpl), Virginia Electric and Power Company (Vepco), Duke Energy Corporation (Duke), and Exelon Generation Company (Exelon)ML020530398 |
Person / Time |
---|
Site: |
Peach Bottom, Mcguire, Catawba, Surry, North Anna, Turkey Point, McGuire |
---|
Issue date: |
01/08/2002 |
---|
From: |
Division of Regulatory Improvement Programs |
---|
To: |
|
---|
Hoffman, S T, NRR, 415-3245 |
References |
---|
Download: ML020530398 (48) |
|
|
---|
Category:Meeting Agenda
MONTHYEARML24302A2422024-10-29029 October 2024 ECCS Compensated Level System Replacement Project Pre-Submittal Meeting Slides PMNS20241330, Meeting with Constellation Energy Generation, LLC to Discuss a Planned Licenseamendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 32024-10-18018 October 2024 Meeting with Constellation Energy Generation, LLC to Discuss a Planned Licenseamendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 3 PMNS20241326, Notice of Presubmittal Meeting with Duke Energy to Discuss Their Plans to Submit a License Amendment Request for Adoption of PAD5 Code, Fsloca, and Use of Axiomtm Fuel Rod Cladding2024-10-17017 October 2024 Notice of Presubmittal Meeting with Duke Energy to Discuss Their Plans to Submit a License Amendment Request for Adoption of PAD5 Code, Fsloca, and Use of Axiomtm Fuel Rod Cladding PMNS20241276, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Alternative for Reactor Pressure Vessel Stud Examinations2024-10-0909 October 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Alternative for Reactor Pressure Vessel Stud Examinations PMNS20241176, Pre-submittal Meeting with Dominion Energy Regarding a Planned License Amendment Request for North Anna Power Station and Surry Power Station to Revise Selected Alternate Source Term Dose Consequence Analyses2024-09-23023 September 2024 Pre-submittal Meeting with Dominion Energy Regarding a Planned License Amendment Request for North Anna Power Station and Surry Power Station to Revise Selected Alternate Source Term Dose Consequence Analyses ML24247A0042024-09-0303 September 2024 SLR Efficiencies Public Meeting - NRC Presentation - September 5, 2024 PMNS20240948, Regulatory Conference with Duke Energy Carolinas, LLC (Duke) Catawba Nuclear Station2024-07-23023 July 2024 Regulatory Conference with Duke Energy Carolinas, LLC (Duke) Catawba Nuclear Station ML24200A2312024-07-22022 July 2024 Constellations Pre-Submittal Meeting Presentation About Peach Bottom ECCS Compensated Level System Replacement Project - July 22, 2024 PMNS20240898, Meeting with Constellation Energy Generation, LLC to Discuss a Planned License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 32024-07-0808 July 2024 Meeting with Constellation Energy Generation, LLC to Discuss a Planned License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 3 PMNS20240860, Pre-submittal Meeting with Dominion Energy Regarding a Planned Fleet License Amendment Request for Selected Sites to Modify Moderator Temperature Coefficient (Mtc) Technical Specifications (Tss)2024-07-0303 July 2024 Pre-submittal Meeting with Dominion Energy Regarding a Planned Fleet License Amendment Request for Selected Sites to Modify Moderator Temperature Coefficient (Mtc) Technical Specifications (Tss) PMNS20240863, Pre-submittal Meeting with Virginia Electric and Power Company (VEPCO) to Discuss Its Proposed License Amendment for Surry Power Station, Units 1 and 22024-06-27027 June 2024 Pre-submittal Meeting with Virginia Electric and Power Company (VEPCO) to Discuss Its Proposed License Amendment for Surry Power Station, Units 1 and 2 PMNS20240758, Notice of Meeting with Dominion Energy Inc. to Discuss Guidance in NUREG-0800 Standard Review Plan (SRP)2024-06-12012 June 2024 Notice of Meeting with Dominion Energy Inc. to Discuss Guidance in NUREG-0800 Standard Review Plan (SRP) ML24121A1862024-05-14014 May 2024 Attachment 3: Peach Bottom ECCS Compensated Level System Replacement Project Presentation Material (Non-Proprietary Information) PMNS20240449, Meeting with Constellation Energy Generation, LLC to Discuss a License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 32024-05-10010 May 2024 Meeting with Constellation Energy Generation, LLC to Discuss a License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 3 PMNS20240556, Annual Assessment Meeting Surry Power Station Annual Assessment Meeting2024-04-18018 April 2024 Annual Assessment Meeting Surry Power Station Annual Assessment Meeting PMNS20240533, Plants - 2023 Annual Assessment Meeting2024-04-12012 April 2024 Plants - 2023 Annual Assessment Meeting PMNS20240492, Duke Sites Annual Assessment Meeting2024-04-10010 April 2024 Duke Sites Annual Assessment Meeting PMNS20240456, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Alternative to Implement Code Case OMN-322024-04-10010 April 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Alternative to Implement Code Case OMN-32 ML24100A8062024-04-0909 April 2024 Duke Energy Sites Annual Assessment Meeting Presentation Slides April 23, 2024 ML24073A3372024-03-13013 March 2024 NextEra - NRC Slides for the Public Meeting on March 19, 2024 Regarding Emergency Plan Licensing Amendment PMNS20240303, Notice of Meeting with NextEra Energy/Florida Power & Light Regarding License Amendment Request to Create a Fleet Emergency Plan2024-03-0606 March 2024 Notice of Meeting with NextEra Energy/Florida Power & Light Regarding License Amendment Request to Create a Fleet Emergency Plan PMNS20240007, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-9322024-01-29029 January 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-932 PMNS20240052, Public Meeting to Receive Comments on the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station Units 1 and 2, Subsequent License Renewal Application2024-01-16016 January 2024 Public Meeting to Receive Comments on the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station Units 1 and 2, Subsequent License Renewal Application PMNS20240058, Public Meeting to Receive Comments on the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station Units 1 and 2, Subsequent License Renewal Application2024-01-12012 January 2024 Public Meeting to Receive Comments on the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station Units 1 and 2, Subsequent License Renewal Application PMNS20231323, Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 22023-11-27027 November 2023 Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 2 PMNS20231227, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-5912023-11-13013 November 2023 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-591 PMNS20230969, Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement2023-09-0707 September 2023 Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement PMNS20230973, Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement2023-09-0707 September 2023 Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement PMNS20230932, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-08-14014 August 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230879, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-08-0101 August 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230809, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-07-11011 July 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230775, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-06-30030 June 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230732, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle for Turkey Point Generating Unit Nos. 3 and 42023-06-26026 June 2023 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle for Turkey Point Generating Unit Nos. 3 and 4 PMNS20230718, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-06-12012 June 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230673, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-05-26026 May 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230599, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-05-15015 May 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230615, Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 22023-05-11011 May 2023 Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 2 PMNS20230594, Annual Assessment Meeting2023-05-0404 May 2023 Annual Assessment Meeting PMNS20230447, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-04-20020 April 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230449, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-18018 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230430, Assessment Meetingsurry Power Station Annual Assessment Meeting2023-04-13013 April 2023 Assessment Meetingsurry Power Station Annual Assessment Meeting PMNS20230409, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-11011 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230253, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-04-0707 April 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230288, Public Pre-Application Meeting for Peach Bottom Atomic Power Station Planned Exemption Request from Part 26 Work-Hour Rules2023-04-0505 April 2023 Public Pre-Application Meeting for Peach Bottom Atomic Power Station Planned Exemption Request from Part 26 Work-Hour Rules PMNS20230278, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-0303 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230332, and Oconee Nuclear Station Annual Assessment Meeting for 20222023-03-30030 March 2023 and Oconee Nuclear Station Annual Assessment Meeting for 2022 PMNS20230308, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-27027 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230226, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-03-0707 March 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230223, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-0606 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230192, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-0101 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 2024-09-03
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML24302A2422024-10-29029 October 2024 ECCS Compensated Level System Replacement Project Pre-Submittal Meeting Slides ML24302A0702024-10-28028 October 2024 Duke Energy Presubmittal Meeting on Adoption of Westinghouse Analysis PAD5/FSLOCA/AXIOM (EPID L-2024-LRM-0121) on October 28, 2024 ML24283A1442024-10-16016 October 2024 Main Steam Line Break Accident Analysis LAR Pre-Application Meeting ML24247A0042024-09-0303 September 2024 SLR Efficiencies Public Meeting - NRC Presentation - September 5, 2024 RA-24-0203, Regulatory Conference Supporting Information2024-07-31031 July 2024 Regulatory Conference Supporting Information ML24200A2312024-07-22022 July 2024 Constellations Pre-Submittal Meeting Presentation About Peach Bottom ECCS Compensated Level System Replacement Project - July 22, 2024 ML24183A2082024-07-11011 July 2024 Presubmittal Presentation: TS 3.7, 3.14 Change for Extended AOT During Outage and SW Piping Maintenance, Cfrp SW Application - Slides ML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML24121A1862024-05-14014 May 2024 Attachment 3: Peach Bottom ECCS Compensated Level System Replacement Project Presentation Material (Non-Proprietary Information) ML24131A1282024-05-14014 May 2024 Lessons Learned for ECCS Digital I&C License Amendment ML24134A2032024-05-14014 May 2024 Lessons Learned for ECCS Digital I&C License Amendment - Rev 0 ML24108A0712024-04-30030 April 2024 Combined - 2023 Annual Assessment Public Meeting Slides ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24100A8062024-04-0909 April 2024 Duke Energy Sites Annual Assessment Meeting Presentation Slides April 23, 2024 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24073A3372024-03-13013 March 2024 NextEra - NRC Slides for the Public Meeting on March 19, 2024 Regarding Emergency Plan Licensing Amendment ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML24029A2362024-01-30030 January 2024 Preliminary Results of the Environmental Review, Subsequent License Renewal ML23338A1522023-12-0707 December 2023 Public Meeting Slides for North Anna and Surry Emergency Plan Augmentation Times License Amendment Request ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23258A0262023-09-15015 September 2023 September 2023 Dseis Public Meeting - In-person Meeting Slides ML23258A0272023-09-15015 September 2023 September 2023 Dseis Public Meeting - Virtual Meeting Slides ML23255A0992023-09-15015 September 2023 Slides for September 15, 2023 Public Meeting on Poanhi Seismic Evaluations ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23170A0082023-06-29029 June 2023 Decommissioning Presentation for NRC Pre-submittal Meeting, June 29, 2023 ML23177A0812023-06-28028 June 2023 Nd Pre-Submittal Meeting Regarding License Amendment Requests for Transition to 24-Month Fuel Cycles ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23124A3412023-05-0404 May 2023 FPL 2022 Public Meeting Slides ML23103A3482023-04-14014 April 2023 Annual Assessment Meeting Presentation for North Anna and Surry ML23094A1492023-04-11011 April 2023 Licensee Presentation on Whr Exemption Request for Public Meeting on April 11, 2023 ML23076A0442023-03-16016 March 2023 Pb U2 Scram Barrier Presentation KT Session ML22336A0382022-12-0808 December 2022 Presentation Slides December 8, 2022, pre-submittal Meeting to Discuss Proposed License Amendment Request Regarding TS 3.7.11, Control Room Area Chilled Water System (Cracws) ML22336A0262022-12-0707 December 2022 December 7 2022 24-Month Fuel Cycle Public Meeting Licensee Slides ML22325A3142022-11-30030 November 2022 November 30, 2022, Pre-Submittal Presentation Slides TSTF-505 and 10 CFR 50.69 (L-2022-LRM-0084) ML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22251A1732022-09-0808 September 2022 Staff Presentation Slides for Turkey Point Di&C LAR Acceptance Review Public Meeting, September 13, 2022 ML22227A1302022-08-17017 August 2022 License Amendment Request Reactor Trip Breaker Completion Time Extension - Public Meeting August 17, 2022 (EPID L-2022-LRM-0061) (Slides) ML22172A2172022-06-22022 June 2022 LAR: Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary) ML21221A0332022-06-17017 June 2022 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides ML22144A3902022-05-24024 May 2022 RCP Seal Solutions - May 24 2022 Slide Material (Public) ML22111A1782022-04-26026 April 2022 April 26, 2022 Public Meeting on Reactor Coolant Pump Seal Replacement - Florida Power and Light Slides ML22097A2262022-04-13013 April 2022 Presubmittal Presentation April 13, 2022 One-time TS Change of AOT for Unit 2 AFW Piping Replacement ML22101A2262022-04-11011 April 2022 NRC Staff Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request ML22063A1262022-03-0404 March 2022 Nextera/Fpl Presentation for March 7, 2022 Public Meeting Between NRC and Florida Power & Light Company to Discuss Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Units 3 and 4 ML22067A1992022-03-0303 March 2022 Annual Assessment Meeting Presentation ML22055B1132022-03-0202 March 2022 Technical Support Center (TSC) Relocation Proposed License Amendment Request - NRC Pre-Submittal Meeting, March 2, 2022 ML21336A1422021-12-0707 December 2021 December 7, 2021, Pre-submittal Presentation Slides Regarding Embedded Flaw Repair Relief Request - Revised ML21327A2112021-11-23023 November 2021 December 7, 2021, Pre-submittal Presentation Regarding Embedded Flaw Repair Relief Request ML21320A2612021-11-17017 November 2021 Supporting Information for Turkey Point and St. Lucie Improved Technical Specifications November 17, 2021, Public Meeting - List of Topics ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval 2024-09-03
[Table view] |
Text
AGENDA NRC LICENSE RENEWAL MEETINGS WITH NEI AND THE LICENSE RENEWAL APPLICANTS JANUARY 8, 2002 (1:00 - 4:00 pm approx.)
I. Meeting between the NRC License Renewal Steering Committee (LRSC) and NEI License Renewal Working Group 1:00 - 1:30 pm A. Status of applications (1) Hatch 1 & 2 Southern Nuclear Florida Power & Light (2) Turkey Point 3 & 4 Virginia Elec. & Power (3) Surry 1 & 2 and North Anna 1 & 2 Duke Energy (4) McGuire 1 & 2 and Catawba 1 & 2 Exelon (5) Peach Bottom 2 & 3 Florida Power Light (6) St. Lucie 1 & 2 1:30 - 2:15 pm NRC B. License renewal interest - known submittals NRC C. License renewal implementation guidance development (1) Emerging issues (2) Lessons learned process - document updates D. Lessons learned from application reviews NRC (1) Environmental scoping meeting open house experience NRC (2) License renewal appeals process NEI (3) New lessons identified LRSC E. Summary All attendees F. Public participation n
- 15 - 2:30 pm Break
- 30 - 4:00 pm I1. Meetings between NRC Management and License Renewal Applicants 2 A. Florida Power and Light Company -- Turkey Point 3 & 4 B. Virginia Electric and Power Company -- Surry 1 & 2 and North Anna 1 & 2 C. Duke Energy Company -- McGuire 1 & 2 and Catawba 1 & 2 D. Exelon Generation Company -- Peach Bottom 2 & 3 Attachment I
Projected Schedule of License Renewal Applications Through FY05 F 1i FY° FY 03 1Q 1FY20 04 1 3If 4I Q IFYZ 3Q sloi IPIa, jISubmil, IQ 2Q3 4Q° IQoQI2Q3 2Q I 3 4Q FYUO I I I I I
+ l -1 t -I- I I I 1 ANO-1 I I, I ~~I I I
I I I II I I I ..
2 Hatch FYOI 3 Turkey Point zzIzzIzzzttzzt_11zZ1Z111Z1-IZZT-I I
I North Anna May-01 ___ - 4 ! I -I I-I,-I II4-2 ISurry ", IMay-01l 3 ICatawba Jun-01_
____ 4-I--4 I -t -t-t 4 McGuire Jn ____ I-4-4-4t 5 Peach,.. Bottom=, Jul-01. I L....-....---J ---------I I-5 I. B to I::VI'Y) l I
1"7 SttLucia 1IFnrt U2lhnhnf I,!.ov2 Jan-U/
I -
I I
'1 I.-t-I I Fort Gaihoun Jan-02 i R nhinr.'ln Jun-u.
Ju-4 3 ,R_____________ I t
-A I inni 5i1 Summner E'Vt'Y'J 4~~
Jul-02.
A!-UIi~2zt 1
-~nn - r I r
IF Dresden 2,3 2__
2_ 2 Quad _uad.Cit E2 _1 Cities! 12 20--------------------Q II-U - d 3Q.,
RO
- r- .j
'; l rle'A*I*
~ .I I*
"PJrl.I II I I I I I II
- 5. IANO-2' p%.4'* A
= 'II I"F U 1 1 1 1 1-1 1 1 1 1 I -- - _
SI NineMilePoint 1,2 Oct-031 2 1Cook 1,2 Nov-03 I 1 I I 3 1Browns Ferry 2,3 Dec-031 ,
4 *'"*1ick I I II I I - I 5 JUnannounced Jan-04 - I 6 1BeaverValleyl1,2 Sep-041-I-
I Unannounced Oct-04 2 Davis-Besse Dec-04 3 Pilgrim Dec-04 4 Unannounced 2QE =
5 Cooper Apr-I
ýLEGEND Changes."...,1.' Assumptions
- 1. Schedules based on 25-month review without hearing.
1 January 7, 2002
LICENSE RENEWAL IMPLEMENTATION GUIDANCE DEVELOPMENT
"* Emerging issues "o Scoping of station blackout equipment "o Scoping of seismic IIover I piping "o Aging management of non-environmental qualified cables "o Aging management of fire protection piping "o Aging management of concrete structures
"*Guidance document updates LESSONS LEARNED FROM APPLICATION REVIEWS
"* Environmental scoping meeting open house experience
"*License renewal appeal process 2
TURKEY POINT, UNITS 3 AND 4 LICENSE RENEWAL STATUS RECENT ACCOMPLISHMENTS 8/17/01 Issued safety evaluation report (SER) with open items 8/20-24/01 Aging management review inspection 9/10-14/01 9/25/01 ACRS subcommittee meeting 10/5/01 ACRS full committee meeting 11/7/01 Applicant responded to SER open items 3
TURKEY POINT, UNITS 3 AND 4 LICENSE RENEWAL STATUS FUTURE ACTIVITIES 1/29/02 Issue final supplemental environmental impact statement (SEIS) 1/15/02 Complete final inspection 2/28/02 Issue SER 3/8/02 Receive Regional Administrator's recommendation 3/13/02 ACRS subcommittee meeting 4/12/02 ACRS full committee meeting 5/17/02 Commission paper with staff recommendation 7/17/02 Issue renewed license (if approved) 4
NORTH ANNA, UNITS 1 AND 2 SURRY, UNITS 1 AND 2 LICENSE RENEWAL STATUS RECENT ACCOMPLISHMENTS 9/14/01 Scoping and screening methodology audits complete 9/19/01 Environmental scoping meeting (Surry) 10/18/01 Environmental scoping meeting (North Anna) 10/17/01 Issued env. requests for additional information (RAIs) (North Anna & Surry) 11/26/01 Issued safety RAls 12/10/01 Received environmental RAI responses (Surry and North Anna) 5
NORTH ANNA, UNITS 1 AND 2 SURRY, UNITS 1 AND 2 LICENSE RENEWAL STATUS FUTURE MILESTONES 2/8/02 Receive safety RAI responses (North Anna and Surry) 2/15/02 Complete scoping inspections 5/31/02 Complete aging management review inspections 4/26/02 Issue SEIS (Surry) 5/17/02 Issue draft SEIS (North Anna) 6/10/02 Issue SER with open items 6
MCGUIRE, UNITS 1 AND 2 CATAWBA, UNITS 1 AND 2 LICENSE RENEWAL STATUS RECENT ACCOMPLISHMENTS 10/19/01 Completed scoping methodology audit 10/21/01 SEIS scoping period ended (McGuire) 10/23/01 Environmental scoping meeting (Catawba) 11/22/01 SEIS scoping period ended (Catawba) 11/26/01 Issued environmental RAIs (McGuire) 12/12/01 Issued environmental RAIs for Catawba 12/18-19/01 Pre-hearing conference in Charlotte 7
a MCGUIRE, UNITS 1 AND 2 CATAWBA, UNITS 1 AND 2 LICENSE RENEWAL STATUS FUTURE ACTIVITIES Receive environmental RAI responses (McGuire) 1/21/02 1/23/02 ALSB decision on standing and contentions 1/30/02 Issue safety RAIs 2/13/02 Receive environmental RAI responses (Catawba) 3/29/02 Complete scoping inspection 4/15/02 Receive safety RAI responses 5/17/02 Issue draft SEIS (McGuire) 6/7/02 Issue draft SEIS (Catawba) 8
4 PEACH BOTTOM, UNITS 2 AND 3 LICENSE RENEWAL STATUS RECENT ACCOMPLISHMENTS Deadline for filing hearing requests and petitions for intervention 10/1/01 11/7/01 Environmental scoping meeting 11/16/01 Issued revised schedule for 25 month review 12/7/01 Completed scoping and screening methodology audit 12/20/01 Issued environmental RAIs 9
10 '
PEACH BOTTOM, UNITS 2 AND 3 LICENSE RENEWAL STATUS FUTURE ACTIVITIES 2/26/02 Receive environmental RAI responses 3/12/02 Issue safety RAIs 5/27/02 Receive safety RAI responses 7/5/02 Issue draft SEIS 9/16/02 Issue SER with open items 10
w FPL LICENSE RENEWAL TURKEY POINT AND ST. LUCIE PLANTS FPL AND NRC MANAGEMENT MEETING January 8, 2002 Attachment 3
FIPL LICENSE RENEWAL COMPLETED ACTIVITIES - TURKEY POINT
"* September 25, 2001 - ACRS subcommittee meeting
"* October 4, 2001 - ACRS full committee meeting
"* October 22, 2001 - Issued License Renewal Application annual update
- November 1, 2001 - Issued FPL comments on SER and responses to Open/Confirmatory'Items
- November 7, 2001 - Issued response to new open item on concrete aging (NRC letter of October 30, 2001) 2
FPL LICENSE RENEWAL UPCOMING ACTIVITIES - TURKEY POINT
- January 29, 2002 - NRC issue final EIS o February 28, 2002 - NRC issue SSER
- March 13, 2002 ACRS subcommittee site visit and meeting
- April 11-12, 2002 - ACRS full committee meeting 3
IV IF:PL LICENSE RENEWAL
SUMMARY
- TURKEY POINT
"* All open and confirmatory items resolved
"* All license renewal activities are on or ahead of schedule
"* NRC revised schedule indicates a Commission decision by July 17, 2002
- Improvement appears feasible 4
- December 20, 2001 - Additional CD copies of the LRA provided to NRC
- December 27, 2001 - NRC notice of receipt of the:
LRA published in the Federal Register 5
W FPL LICENSE RENEWAL UPCOMING ACTIVITIES - ST. LUCIE
- January 17, 2002 - NRC/FPL meeting
- Overview of the St. Lucie LRA
- January 2002 - NRC complete sufficiency review and provide review schedule 6
FPL LICENSE RENEWAL
SUMMARY
- ST. LUCIE
- Frequent communications between FPL and NRC are occurring 7
w FPL LICENSE RENEWAL TURKEY POINT AND ST. LUCIE PLANTS FPL AND NRC MANAGEMENT MEETING January 8, 2002 Attachment 3
IPL LICENSE RENEWAL COMPLETED ACTIVITIES - TURKEY POINT
- September 25, 2001 - ACRS subcommittee meeting
- October 4, 2001 - ACRS full committee meeting
"* October 22, 2001 - Issued License Renewal Application annual update
"* November 1, 2001 - Issued FPL comments on SER and responses to Open/Confirmatory Items
"* November 7, 2001 - Issued response to new open item on-concrete aging (NRC letter of October 30, 2001) 2
w FPL LICENSE RENEWAL UPCOMING ACTIVITIES - TURKEY POINT
"* January 29, 2002 - NRC issue final EIS
"* February 28, 2002 - NRC issue SSER
"* March 13, 2002 - ACRS subcommittee site visit and meeting
"* April 11-12, 2002 - ACRS full committee meeting 3
W IF:PL LICENSE RENEWAL
SUMMARY
- TURKEY POINT 9 All open and confirmatory items resolved
- NRC revised schedule indicates a Commission decision by July 17, 2002
- Improvement appears feasible 4
LICENSE RENEWAL FPL COMPLETED ACTIVITIES - ST. LUCIE
- December 20, 2001 - Additional CD copies of the LRA provided to NRC
- December 27, 2001 - NRC notice of receipt of the LRA published in the Federal Register 5
V FPL LICENSE RENEWAL UPCOMING ACTIVITIES - ST. LUCIE
- January 17, 2002 - NRC/FPL meeting
- Overview of the St. Lucie LRA
- January 2002 - NRC complete sufficiency review and provide review schedule 6
FPL iFPL LICENSE RENEWAL
SUMMARY
- ST. LUCIE
- Frequent communications between FPL and NRC are occurring 7
rim Rno nit License Renewal Management Meeting SurryPower Station North Anna Power Station January 08, 2002 1
Attachment 4
January 2002 OVDominion LR Status Update Topics e Milestone Review Schedule
- Safety Review Status e Environmental Review Status e Closing Remarks 2
January 2002
- Dominion LR Status Update Dominion LRA Review Schedule Milestone Review Schedule - Completed Activities Milestone Target Date Actual Date Receive SPS and NAPS LRAs 05/29/01 05/29/01 FRN Published for LRA Receipt 06/28/01 06/28/01 FRN Published for Hearing Opporunity 07/27/01 07/27/001 Deadline for filing hearing requests 08/27/01 08/27/01 Environmental scoping meeting (Surry) 09/19/01 09/19/01 Environmental scoping meeting (North Anna) 10/18/01 10/18/01 NRC Issues Env. RAIs (Surry) 11/09/01 11/09/01 NRC Issues Safety RAIs 11/26/01 11/26/01 NRC Issues Env. RAIs (North Anna) 12/07/01 12/07/01 Dominion Responds to Env. RAIs (Surry) 12/21/01 12/10/01 Dominion Responds to Env. RAIs (North Anna) 01/21/02 12/10/01 3
January 2002 FDominion LR Status Update Dominion LRA Review Schedule Milestone Review Schedule - Future Activities Milestone Target Date Actual Date Dominion Responds to Safety RAIs 02/08/02 Scoping Inspections Complete 02/15/02 Draft SEIS to EPA (Surry) 04/26/02 Draft SEIS to EPA (North Anna) 05/17/02 AMR Inspections Complete 05/31/02 Public Meeting to Discuss DEIS (Surry) 06/06/02 SER w/O0 issued by NRC 06/10/02 Public Meeting to Discuss DEIS (North Anna) 06/27/02 End of DEIS Comment Period (Suny) 07/18/02 ACRS Subcommittee review of SER 01 07/24/02 End of DEIS Comment Period (North Anna) 08/08/02 4
January 2002
- ,Dominion LR Status Update Dominion LRA Review Schedule Milestone Review Schedule - Future Activities Milestone Target Date Actual Date Responses to SER 01 Received 08/22/02 ACRS full committee review of SER 01 09/04/02 SER issued by RLSB 11/05/02 Optional Final Inspection complete 11/29/02 ACRS full committee review of SER 12/04/02 Final SEIS issued to EPA (Surry) 12/13/02 Final SEIS issued to EPA (North Anna) 12/13/02 ACRS Letter 12/20/02 Regional Administrator's Letter 01/20/03 SER issued as NUREG 01/28/03 Commission Paper w/Staff Recommendations 03/14/03 Commission Decision 06/27/03 5
IN0 January 2002 tDominion* LR Status Update Safety Review Completed Activities
- August 8, 2001 - First set of formal RAIs issued to Applicant (received 8/17/01) (5 RAIs)
- September 10 -1.4, 2001 - Scoping/Screening Methodology Audit
- September 19, 2001 - North Anna Plant Walk-through with Region II Inspectors during U 1RO
- September 27, 2001 - Submitted responses to first set of formal RAIs (5 RAIs) 6
January 2002 D-1uominion LR Status Update Safety Review Completed Activities
- October 11, 2001 - Second set of formal RAIs issued to Applicant (received 11/19/01) (24 RAIs)
- October 12, 2001 - Letter revising LRA review schedule in accordance with a 25-month review plan issued to Applicant because no petitions to intervene or requests for hearings filed.
- October 22, 2001 - Third set of formal RAIs issued to Applicant (received 11/8/01) (16 RAIs)
- October 22, 2001 - Fourth set of formal RAIs issued to Applicant (received 11/8/01) (6 RAIs) 7
January 2002 Dotmiion LR Status Update Safety Review Completed Activities
° November 14, 2001 - Fifth set of formal RAIs issued to Applicant (received 11/20/01) (2 RAIs)
° November 26, 2001 - Final set of RAIs issued to Applicant (received 12/5/01) (34 RAIs)
- November 30, 2001 - Submitted responses to second set of formal RAIs (24 RAIs) 8
January 2002 SDominion LR Status Update Safety Review Future Activities
"* January 15, 2002 - Submit responses to remaining formal RAIs (53 RAIs), except those related to Criterion 2 scoping and low voltage instrument cable (5 RAIs).
"* February 8, 2002 - Submit responses to formal RAIs related to Criterion 2 scoping and low voltage instrument cable (5 RAIs).
9
January 2002 Dominion LR Status Update Environmental Review Completed Activities
- September 19, 2001 - Surry Public Env. Scoping Meeting
. September 19&20, 2001 - Surry Environmental Site Audit
. October 18, 2001 - NAPS Public Environmental Scoping Meeting
. October 17&18, 2001 - NAPS Environmental Site Audit
. October 17, 2001 - SAMA RAIs issued to Applicant (17 15 requiring response)
- December 10, 2001 - Responses to SAMA RAIs Issued to NRC 10
% a .
,p .. January 2002
-Dominion LR Status Update Safety Review RAI Categorization 85 80 78 Category I - Appropriate RAI 75 Category 2 - Admin. Error in LRA 70 Category 3 - Technical Error in LRA 65 60 Category 4 - Info. Provided in LRA 55 Category 5 - Info. Should not be in LRA 50 Category 6 - Challenges the Adequacy of 45 the CLB 40 Category 7 - Technical Error in RAI 35 30 25 20 15 10 C .3 4 C 1 Category I Category 2 Category 3 Category4 Category 5 Category 6 Category 7 11
January 2002 JI*Dominion LR Status Update Safety Review Category 5 RAIs o Category 5 - Information Should Not be in the LRA OE Methodology (1) (RAI 3.1.1.2-1)
UFSAR Tables (1) (RAI 4.7.4-1)
Code Edition (1) (RAI B2.2.12-2) 12
January 2002
."Dominion LR Status Update Safety Review Category 6 RAI Category 6 - Challenges the Adequacy of the CLB SBO Scoping(1) (RAI 2.5-1) 13
' NwJanuary 2002 fDonminion LR Status Update Closing Remarks
"* Communication dialog has been excellent and timely.
"* Teleconference/review process has reduced the actual number of formal RAIs issued to 36% of the potential RAIs.
"* The LRA review schedule is being maintained.
14
IH* January 2002 ODominion LR Status Update Closing Remarks
- SBO Scoping
- Fire Protection Programs
- Instrument Cables
- Concrete Aging
- Criterion 2 Scoping
- RAI Responses
- Scoping Inspections 15
I Duke McGuire - Catawba EEnergy.
License Renewal Duke/NRC Management Meeting January 8, 2002 P Duke Energ.. Accomplishments
"* September 19, 2001 - NRC/Duke Management Meeting
"* September 24 & 25, 2001 - McGuire Environmental Scoping Site Audit & Public Meetings
"* October 16-18, 2001 - Safety Scoping & Screening Methodology Audit completed
"* October 22 & 23, 2001 - Catawba Environmental Scoping Site Audit & Public Meetings
"* December 18 & 19, 2001 - ASLB Prehearing Conference in Charlotte January8,2002 Duke Nuclear License Renewal Project 2 Attachment 5 I
P* Duke 6VEnergy. Safety Review
"* Good communications continue to advance the application review
"*Topical telecons covering draft RAls have been helpful in understanding perspectives and clarifying information requests
"*NRC staff questions indicate the thoroughness of their review
"* Some staff positions (particularly some of those addressed in letters to NEI) appear to be new interpretations and will require more plant-specific and industry-wide dialogue
"* All formal safety RAIs to be issued by the end of January January8,2002 Duke Nuclear License Renewal Project 3 I. Duke FEnergy. EnvironmentalReview
"[ Good communications with NRC project manager led to successful site visits and public meetings for both plants
"* Environmental RAIs have been issued with responses due to support site-specific Supplemental Environmental Impact Statements
"* McGuire responses 1/2102
"* Catawba responses 2/13/02
"* Separate resolution timeframe agreed to for SAMA RAI responses, supporting both Duke and NRC resource needs January8,2002 Duke NuclearLicense Renewal Project 4 2
F Duke OEnergy. Hearing Process
"* The Atomic Safety and Licensing Board held a pre-hearing conference in Charlotte on December 18-19, 2001
"* Both the Blue Ridge Environmental Defense League and the Nuclear Information and Resource Service along with Duke and the NRC staff participated in this conference
"* The ASLB is expected to provide additional direction to these proceedings by the end of January Duke NuclearLicense Renewal Project .5 January8,2002 I Duke Energy- Expectations m Expectations to be accomplished by next NRC/Duke Management Meeting (March timeframe)
"* Duke to prepare responses to environmental, SAMA and safety RAIs, submit to NRC by agreed upon dates
"* NRC and Duke find a way to have constructive dialogue on the staff position papers that also supports the Duke RAI response schedule
"* Work with Region IIto prepare for scoping/screening inspection in March Duke Nuclear License Renewal Project 6 January8, 2002 13
Peach Bottom Atomic Power Station Exelon and NRC Management Meeting James Meister Fred Polaski January 8, 2002 Purpose of Meeting
"*Update NRC management on progress of Peach Bottom LRA review.
"*Inform NRC management of any significant issues.
"*Provide performance expectations for next two months.
'2 Attachment 6 1
4' Peach Bottom LRA Review Schedule Milestone Target Date Actual Date Receive Peach Bottom LRA 07/02/01 07/02/01 FRN Published for LRA Receipt 08/01/01 07/25/01 FRN Published for Hearing Opportunity 08/31/01 08/31/01 Deadline for filing hearing requests 10/01/01 10/01/01 Environmental Scoping Meeting 11/07/01 11/07/01 NRC Issues Env. RAIs 12/28/01 12/20/01 Exelon Responds to Env. RAIs 02/26/02 NRC Issues Safety RAls 03/12/02 Exelon Responds to Safety RAIs 05/27/02 NRC Issues SER 02/06/03 NRC Issues Final SEIS to EPA 02/07/03 3
Completed Activities
- September 5, 2001 - NRC Issued Sufficiency Letter and Established Deadline for Filing Petition to Intervene
- September 24-25, 2001 - NRC Visit to Discuss Scoping Methodology and Electrical Issues
" October 22, 2001 -NRC Meeting to Discuss Scoping Methodology
"* October 30, 2001 - NRC RAIs on Scoping Methodology
"* November 7, 2001 - NRC Environmental Scoping Meetings
" November 8-9, 2001 - NRC Environmental Site Audit 4
2
Completed Activities (continued)
" November 16, 2001 - Exelon Transmitted Responses to RAIs on Scoping Methodology
" November 15, 2001 - NRC Scoping Methodology Document Collection Visit
" November 16, 2001 - NRC Transmitted Revised 25-month Review Schedule
" November 26, 2001 - NRC Transmitted Letter Requesting Information Related to Keeney Transmission Line and Delaware Feeder Canal
"* December 4-7, 2001 - NRC Scoping Methodology Audit
"* December 20, 2001 - NRC Issued Environmental RAIs Future Activities
- February 26, 2002 - Exelon Provides Responses to Environmental RAIs
- March 12, 2002 - NRC Issues Safety RAIs 3
Part 54 Project Performance
"* Schedule Adherence
- All dates met
"* Communications
- Good
"* Interactions between NRC/National Lab reviewers and Exelon
- Good Part 51 Project Performance
"*Schedule Adherence
- All dates met
"*Communications
- Good
"*Interactions between NRC/National Lab reviewers and Exelon
- Good 4
Concerns
"*Emerging industry issues are challenging the stability and predictability of the license renewal process, and may impact the Peach Bottom Application
"*Perception that NRC technical staff believe that all GALL programs are required to manage aging effects 9
Summary
- Communications and interactions have been good. NRC Project Managers doing good job.
10 5