MONTHYEARIR 05000461/20240032024-11-0505 November 2024 Integrated Inspection Report 05000461/2024003 ML24285A1452024-10-24024 October 2024 Ltr. to Gail Cheatham, Kickapoo Tribe of Indians of the Kickapoo Reservation in Ks Re CPS Sect 106 Consult ML24285A1462024-10-24024 October 2024 Ltr. to Gena Kakkak, Chairwoman, Menominee Indian Tribe of Wisconsin Re CPS Section 106 Consultation IR 05000461/20244032024-10-24024 October 2024 – Security Baseline Inspection Report 05000461/2024403 ML24285A1482024-10-24024 October 2024 Ltr. to Joseph Rupnick, Chairman, Prairie Band Potawatomi Nation Re CPS Section 106 Consultation ML24285A1442024-10-24024 October 2024 Ltr. to Estavio Elizondo, Sr., Chairman, Kickapoo Traditional Tribe of Texas Re CPS Section 106 Consultation IR 05000461/20244022024-10-24024 October 2024 – Security Baseline Inspection Report 05000461/2024402 ML24285A1472024-10-24024 October 2024 Ltr. to Geoffrey M. Standing Bear, Principal Chief, Osage Nation Re CPS Section 106 Consultation ML24285A1422024-10-24024 October 2024 Ltr. to Darwin Kaskaske, Chairman, Kickapoo Tribe of Oklahoma Re CPS Section 106 Consultation ML24283A1642024-10-23023 October 2024 Summary of the 2024 Environmental Audit Related to the Review of the License Renewal Application Environmental Report (EPID Number L-2024-LNE-0000)(Docket Number:50-461) ML24285A1412024-10-21021 October 2024 Ltr. to Craig Harper, Chief, Peoria Tribe of Oklahoma Re CPS Section 106 Consultation ML24285A1432024-10-21021 October 2024 Ltr. to Douglas Lankford, Chief, Miami Tribe of Oklahoma Re CPS Section 106 Consultation RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24215A2932024-09-27027 September 2024 Scoping Summary Letter 05000461/LER-2023-002-01, Reactor Core Isolation Cooling Inoperable Prior to Mode Change2024-09-24024 September 2024 Reactor Core Isolation Cooling Inoperable Prior to Mode Change ML24211A2302024-09-11011 September 2024 – Request for Partial Site Release for Facility Operating License No. NPF-62 IR 05000461/20240112024-09-0909 September 2024 Commercial Grade Dedication Inspection Report 05000461/2024011 RS-24-087, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2024-09-0909 September 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station IR 05000461/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Clinton Power Station (Report 05000461/2024005) ML24222A3952024-08-23023 August 2024 Regulatory Audit Report to Support the Review of the Amendments to Revise Reactor Water Cleanup Valve Isolation Timing IR 05000461/20240022024-08-0909 August 2024 Integrated Inspection Report 05000461/2024002 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24220A2772024-08-0707 August 2024 Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000461/2025010 ML24212A2212024-08-0202 August 2024 License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-LNE-0000) (Docket Number: 50-461) ML24157A3242024-07-11011 July 2024 Issuance of Amendment No. 254 Revision of Reactor Water Cleanup Isolation Valve Timing ML24158A0772024-07-0303 July 2024 Notice of Consideration of Approval of Partial Site Release, Public Meeting, and Request for Comments (EPID L-2023-LLA-0088) - Letter ML24163A3252024-06-28028 June 2024 Aging Management Regulatory Audit Plan ML24163A3242024-06-28028 June 2024 LRA - Portal Letter ML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24290A0942024-05-21021 May 2024 Letter from Rachael Mangum (Achp) to Stephen Koenick (NRC) License Renewal Application for the Clinton Power Station Unit 1 Dewitt County, Il, Achp Project Number: 020924 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes IR 05000461/20240122024-05-20020 May 2024 Biennial Problem Identification and Resolution Inspection Report Report 05000461/2024012 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-050, Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2024-05-0909 May 2024 Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation IR 05000461/20240012024-05-0707 May 2024 Integrated Inspection Report 05000461/2024001 ML24103A1032024-05-0101 May 2024 SHPO Consultation Letter for Clinton License Renewal ML24120A3442024-04-30030 April 2024 Ltr. to Gena Kakkak, Chairman, Menominee Indian Tribe of Wisconsin; Re., CPS Section 106 Consultation ML24120A3432024-04-30030 April 2024 Ltr. to Darwin Kaskaske, Chairman, Kickapoo Tribe of Oklahoma; Re., CPS Section 106 Consultation RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24103A0992024-04-30030 April 2024 Achp Scoping Letter for Clinton License Renewal ML24120A3462024-04-30030 April 2024 Ltr. to Douglas Lankford, Chief, Miami Tribe of Oklahoma; Re., CPS Section 106 Consultation ML24120A3452024-04-30030 April 2024 Ltr. to Lester Randell, Chairman, Kickapoo Tribe of Indians of the Kickapoo Reservation in Kansas; Re., CPS Section 106 Consultation ML24103A1152024-04-30030 April 2024 Ltr. to Geoffrey Standing Bear, Principal Chief, the Osage Nation; Re., CPS Section 106 Consultation ML24107B0312024-04-29029 April 2024 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24089A2222024-04-11011 April 2024 LRA - Acceptance and Opportunity for Hearing - Letter 2024-09-09
[Table view] Category:Inspection Report
MONTHYEARIR 05000461/20240032024-11-0505 November 2024 Integrated Inspection Report 05000461/2024003 IR 05000461/20244032024-10-24024 October 2024 – Security Baseline Inspection Report 05000461/2024403 IR 05000461/20244022024-10-24024 October 2024 – Security Baseline Inspection Report 05000461/2024402 IR 05000461/20240112024-09-0909 September 2024 Commercial Grade Dedication Inspection Report 05000461/2024011 IR 05000461/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Clinton Power Station (Report 05000461/2024005) IR 05000461/20240022024-08-0909 August 2024 Integrated Inspection Report 05000461/2024002 IR 05000461/20240122024-05-20020 May 2024 Biennial Problem Identification and Resolution Inspection Report Report 05000461/2024012 IR 05000461/20240012024-05-0707 May 2024 Integrated Inspection Report 05000461/2024001 IR 05000461/20230062024-02-28028 February 2024 Annual Assessment Letter for Clinton Power Station (Report 05000461/2023006) IR 05000461/20230042024-02-0202 February 2024 Integrated Inspection Report 05000461/2023004 IR 05000461/20234022023-12-27027 December 2023 Security Baseline Inspection Report 05000461/2023402 IR 05000461/20235012023-12-0505 December 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000461/2023501 IR 05000461/20230032023-11-0808 November 2023 Integrated Inspection Report 05000461/2023003 IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 IR 05000461/20234202023-08-29029 August 2023 – Security Baseline Inspection Report 05000461/2023420 IR 05000461/20230052023-08-25025 August 2023 Updated Inspection Plan and Assessment Follow-Up Letter for Clinton Power Station (Report 05000461/2023005) IR 05000461/20230022023-08-0404 August 2023 Integrated Inspection Report 05000461/2023002 IR 05000461/20234012023-07-19019 July 2023 Cyber Security Inspection Report 05000461/2023401 IR 05000461/20230102023-05-26026 May 2023 Triennial Fire Protection Inspection Report 05000461/2023010 IR 05000461/20230012023-05-0404 May 2023 Integrated Inspection Report 05000461/2023001 IR 05000461/20220062023-03-0101 March 2023 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2022006) ML23039A1852023-02-10010 February 2023 Integrated Inspection Report 05000461/2022004 07201046/2022001 IR 05000461/20220112023-01-27027 January 2023 Biennial Problem Identification and Resolution Inspection Report 05000461/2022011 IR 05000461/20224022022-12-0606 December 2022 Security Baseline Inspection Report 05000461/2022402 IR 05000461/20224032022-11-28028 November 2022 Material Control and Accounting Program Inspection Report 05000461/2022403 (Public) IR 05000461/20220032022-11-10010 November 2022 Integrated Inspection Report 05000461/2022003 IR 05000461/20220052022-08-22022 August 2022 Updated Inspection Plan for Clinton Power Station (Report 05000461/2022005) IR 05000461/20220022022-07-27027 July 2022 Integrated Inspection Report 05000461/2022002 IR 05000461/20220102022-06-0606 June 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000461/2022010 IR 05000461/20224012022-05-24024 May 2022 Security Baseline Inspection Report 05000461/2022401 IR 05000461/20220012022-04-28028 April 2022 Integrated Inspection Report 05000461/2022001 IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 IR 05000461/20210062022-03-0202 March 2022 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2021006) IR 05000461/20210042022-02-0404 February 2022 Integrated Inspection Report 05000461/2021004 IR 05000461/20215012022-01-0303 January 2022 Emergency Preparedness Biennial Exercise Inspection Report 05000461/2021501 IR 05000461/20210032021-10-29029 October 2021 Integrated Inspection Report 05000461/2021003 IR 05000461/20210132021-09-0303 September 2021 Temporary Instruction Report 05000461/2021013 IR 05000461/20210052021-09-0101 September 2021 Updated Inspection Plan for Clinton Power Station; Report 05000461/2021005 IR 05000461/20214022021-08-23023 August 2021 Security Baseline Inspection Report 05000461/2021402 IR 05000461/20210112021-08-20020 August 2021 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000461/2021011 IR 05000461/20210022021-08-0909 August 2021 Integrated Inspection Report 05000461/2021002 IR 05000461/20214402021-07-15015 July 2021 Supplemental Inspection Report 05000461/2021440 and Assessment Follow Up Letter (Cover Letter Only) IR 05000461/20210122021-06-28028 June 2021 Biennial Problem Identification and Resolution Inspection Report 05000461/2021012 IR 05000461/20213012021-04-29029 April 2021 NRC Initial License Examination Report 05000461/2021301 IR 05000461/20214012021-04-29029 April 2021 Security Baseline Inspection Report 05000461/2021401 (Cover Letter Only) IR 05000461/20210012021-04-26026 April 2021 Integrated Inspection Report 05000461/2021001 IR 05000461/20210102021-03-18018 March 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000461/2021010 IR 05000461/20200102021-03-11011 March 2021 Triennial Fire Protection Inspection Report 05000461/2020010 IR 05000461/20200062021-03-0404 March 2021 Annual Assessment Letter for Clinton Power Station Unit 1 (Report 05000461/2020006) IR 05000461/20200042021-02-0909 February 2021 Integrated Inspection Report 05000461/2020004; 07201046/2020001 2024-09-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORYCOMMISSION REGION II1I'
ber 20, 2009
SUBJECT:
CLINTON POWER STATION NRC SECURITY BASELINE INSPECTION REPORT 05000461/2009403(DRS)
Dear Mr. Pardee:
On September 18, 2009, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection atLyou.w Clinton Power Station. The inspection covered one or more of the key attributes of the security, cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on September 18, 2009, with Mr. F. A. Kearney and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http:t/www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).
However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
Enclo re cont ensitive Unclassified Non-Sa s Information. When separated fro trlo re, this transmittal document is decontrolled.
OFF 1iii US NL0 SE IY Ei ED FOiO
Eý ýIýOMýNý Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, IRA by D. Funk for/
Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-461 License Nos. NPF-62 Nonpublic Enclosure: Inspection Report 05000461/2009403(DRS)
w/Attachment: Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/ST C. Williamson, Clinton Station Security Manager J. Klinger, State Liaison Officer Illinois Emergency Management Agency cc w/o encl: Distribution via ListServ FICI U ONLY- EC ITY-R AT INF TIO
OF C JSýE L- ýCUR! - ýED FOýR AT N
SUMMARY OF FINDINGS
IR 05000461/2009403(DRS); 09/14/2009 - 09/18/2009, Clinton Power Station; Routine Security
Baseline Inspection.
This report covers a 1 week period of announced routine baseline inspection on security.
The inspection was conducted by four Region III physical security inspectors. No findings of significance were identified. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process."
A. Inspector-ldentified and Self-Revealed Findings
Cornerstone: Physical Protection
No findings of significance were identified.
Licensee-Identified Violations
None.
OFFI ALSE L E0I1RE E N MA ION
I E L -SE "RITY- LA EDI FO M TI
REPORT DETAILS
SAFEGUARDS
S04 Equipment Performance, Testing, and Maintenance (71130.04)
a. Inspection Scope
The inspectors evaluated this area by: reviewing procedures and records, conducting interviews with responsible personnel and plant employees, and performing walkdowns of the equipment being tested.
The inspectors verified that the security testing and maintenance program:
- (1) complied with the NRC-approved security plan andother applicable Commission requirements; and (2),was being effectively implemented to assure the functionality and reliability of all security equipment necessary for intrusion detection and assessment, searches, and a rapid, capable response to a Design Basis Threat and other contingencies. The inspectors conducted the following specific inspection activities:
reviewed and evaluated licensee event reports, safeguards log entries, and corrective action documents dated between September 2008 to September 2009 (no licensee event reports were documented);verified the licensee developed appropriate testing and maintenance procedures; verified-for the perimeter intrusion detection system that the licensee ensured:
- (a) alarm devices are tamper-indicating and self-checking;
- (b) the system functioned as designed;
- (c) required alarms annunciated and could be assessed;
- (d) alarm station operators could recognize individuals in the detection zones;
- (e) compensatory measures were established, when required;
- (f) fields of view were effective; and
- (g) lighting was being maintained; verified for the internal detection and assessment capabilities that:
- (a) equipment was maintained and tested for functionality and reliability; -(b) the equipment was being properly tested; (c). neither the biometric readers or the card readers at the nF protected area access points allowed a user/ into the protected area V _(d) an alarm or notification was generated to /7 it' advise the alarm station operators that were attempted;.:and
- (e) security force responded appropriately to an alarmVor notification;
- - Verified for the independent, redundant alarm stations that the licensee:
(a)-ensured failure of one station would not affect the other;
- (b) maintained and tested all enunciator, assessment, surveillance, and communication systems;
- (c) was not vulnerable to external manipulation;
- (d) ensured that no single act could remove the capability from both alarm stations;
- (e) provided all alarm
S oL I RMTI
FI6C L ýSE.
- SE UýRI -RE ýT IN RATI, stations withý_ that annunciate in at least the other alarm station; nr
- (f) ensured operational activities does not interfere with the execution of alarm assessment and response;
- (g) maintained continuous communications with each on-duty security force member and with local law enforcement authorities; and
- (h) maintained continuous communication between the alarm stations; verified for security communication systems that the licensee:
- (a) maintained each type;
- (b) appropriately tested equipment; and
- (c) provided independent power for non-portable equipment; verified for the weapons maintenance program that the licensee:
- (a) maintained each weapon;
- (b) test fired all weapons at the required periodicity;
- (c) developed and maintains procedures; and
- (d) documented activities associated with the program; verified for other security-related devices and equipment that the licensee:
- (a) appropriately maintained and tested those devices and equipment;
- (b) performed appropriate tests of access control equipment;
- (c) performed testing in accordance with procedures; (d)*ensured that testing of at least one train of search equipment included the most challenging test procedure used by the licensee;
- (e) established sensitivity settings on the equipment in accordance with the routine calibration/maintenance settings;
- (f) maintained and tested vital area detection aids;
- (g) tested all assessment aids, including night-vision, thermal or other devices;
- (h) maintained and tested all personnel access control and personnel search equipment;
- (i) maintained and tested all package and material search equipment;
- (j) maintained and tested all vehicle search equipment;
- (k) maintained and tested the security system emergency power supply; and (I) powered all alarm systems by an uninterruptible power source; verified for new security systems/equipment that the licensee:
- (a) conducted pre-operational testing and evaluation prior to integration into the security program; and
- (b) ensured the testing complied with design criteria and performance specifications (the licensee had not installed any new equipment or systems); and verified for physical barriers that the licensee:
- (a) maintained the integrity of all its physical barriers including both the protected area and vital area along with the isolation zones;
- (b) periodically monitored their condition; and
- (c) located all vital equipment within a vital area.
The inspectors reviewed equipment performance, testing, and maintenance-related issues during baseline inspection activities to verify that they were being entered into the licensee's corrective action program at an appropriate threshold, that adequate attention was being given to timely corrective action, and that adverse trends were identified and addressed.
The inspectors completed 46 of the required 46 samples.
b. Findin-is No findings of significance were identified.
S09 Owner-Controlled Area Controls (71130.09)
a. Inspection Scope
The inspectors evaluated this area by: reviewing procedures and records; conducting interviews with responsible personnel and plant employees; and performing walkdowns of the owner-controlled area (OCA) and vehicle checkpoint.
The inspectors verified that the licensee:
- (1) implemented OCA controls in accordance with the NRC-approved security plan and other applicable regulatory requirements; and
- (2) ensured that OCA controls provided reasonable protection against the Design Basis Threat.
The inspectors conducted the following inspection activities:
reviewed and evaluated licensee event reports, safeguards log entries and corrective action documents dated between September 2008 and September 2009 (no licensee event reports were documented);verified for OCA controls that the licensee:
- (a) ensured personnel maintained communication with the alarm stations and validated OCA controls effectiveness through drills or exercises; and
- (b) actions taken to implement their NRC-approved security plan did not impede the arrival of emergency response personnel or affect implementation of the emergency plan.
verified for the OCA check point that the licensee, in conformance with the measures specified in their NRC-approved security plan:
- (a) effectively implemented procedures for controlling plant personnel, vendor, delivery, and visitor access;
- (b) effectively implemented procedures and controls for channeling vehicles to access control points; and
- (c) effectively implemented procedures for controlling vehicle entry through the vehicle check point.
verified for OCA patrols and surveillance that the licensee:
- (a) effectively implemented procedures for surveillance activities;
- (b) ensured personnel on patrol did not perform collateral duties that decreased the effectiveness of their surveillance activities; and
- (c) effectively implemented applicable procedures for maritime coordination, river intake control, and surveillance; and verified for OCA barriers and equipment that the licensee, in conformance with the measures specified in their NRC-approved security plan:
- (a) effectively implemented controls to limit the potential for unauthorized vehicles and equipment; and
- (b) ensured the OCA patrols had the necessary weapons and equipment readily accessible.
F Cl USE -S CU AT DI TI "Mm
0*FI1 I EON E ý-S ýU -L LA ED N ýR The inspectors reviewed OCA controls-related issues during baseline inspection activities to verify that they were being entered into the licensee's corrective action program at an appropriate threshold, that adequate attention was being given to timely corrective actions, and that adverse trends were identified and adequately addressed.
The inspectors completed 12 of the required 12 samples.
b. Findings
No findings of significance were identified.
40A6 Meetings Exit Meetincl The inspectors presented the inspection results to Mr. F. A. Kearney and other members of licensee management at the conclusion of the inspection on September 18, 2009.
The inspectors asked the licensee whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- F. Kearney, Site Vice President
- M. Kanavos, Plant Manager
- M. Hiter, Security Analyst
- S. Gackstetter, Regulatory Assurance Manager
- C. Williamson, Security Manager
- J. Waddell, Security Supervisor
- D. Montgomery, Access Authorization
Nuclear Requlatory Commission
- B. Kemker, Senior Resident Inspector
- D. Lords, Resident Inspector
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed, and Discussed
None
LIST OF DOCUMENTS REVIEWED