ML043140424

From kanterella
Jump to navigation Jump to search
Detroit Edison - Fermi 2, Revision to Technical Requirements Manual, Volume I
ML043140424
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/29/2004
From:
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
00935, cb1461
Download: ML043140424 (14)


Text

DETROIT EDISON - FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 10/29/04 To: 00935 US NRC PAGE 1 DOCUMENT CNTRL DESK WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvl Date Sec Status TMTRM TRM VOL I 70 11 IR 10/29/04 AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.

Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.

Ref: cb1461 C ~DDI

LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 70 dated 10129/04 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.

Destroy the removed pages. Be sure that Revision 69 has been inserted prior to inserting these pages.

Location Remove Insert In Front of TRM Manual Title Page Rev 69 8/30/04 Title Page Rev 70 10/29/04 Immediately following List of Effective Pages List of Effective Pages Title Page LEP-I through LEP- 4 Rev 69 8/30/04 LEP-1 through LEP- 4 Rev 70 10/29/04 Table of Contents Page TRM-ii Rev 67. Page TRM-ii Rev 70 Page TRM-v Rev 67 Page TRM-v Rev 70 3.6 Containment Systems Page TRM 3.6-a Rev 31 Page TRM 3.6a Rev 70 Page TRM 3.6-32 Rev 60 Page TRM 3.6-32 Rev 70 3.7 Plant Systems Page TRM 3.7-2 Rev 31 Page TRM 3.7-2 Rev 70 Pace TRM 3.7-3 Rev 31 Page TRM 3.7-3 Rev 70 B3.6 Containment Systems Paae TRM B3.6.6-1 Rev 31 Page TRM B3.6.6-1 Rev 70 END

Fermi 2 Technical Requirements Manual Volume I Detroit Edison ARMS - INFORMATIOA DTC: TMTRM IFile: 1754 l DSN: TRM VOL I l Rev: 70 Date 10/29/04 I Recipient q35

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM Revision 31 TRM 3.3-31 Revision 31 TRM ii Revision 70 TRM 3.3-32 Revision 31 iii TRM Revision 31 TRM 3.3-33 Revision 31 TRM iv Revision 34 TRM 3.3-34 Revision 31 iv TRM Revision 70 TRM 3.3-35 Revision 60 TRM vi Revision 31 TRM 3.3-36 Revision 41 TRM 1.0-a Revision 31 TRM 3.3-37 Revision 31 TRM 1.0-1 Revision 31 TRM 3.3-38 Revision 31 TRM 2.0-1 Revision 31 TRM 3.3-39 Revision 31 TRM 3.0-a Revision 31 TRM 3.3-40 Revision 56 TRM 3.0-1 Revision 63 TRM 3.3-41 Revision 56 TRM 3.0-2 Revision 63 TRM 3.3-42 Revision 45 TRM 3.0-3 Revision 54 TRM 3.3-43 Revision 62 TRM 3.0-4 Revision 31 TRM 3.3-44 Revision 31 TRM 3.1-a Revision 31 TRM 3.3-45 Revision 31 TRM 3.1-1 Revision 31 TRM 3.3-46 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-47 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-b Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-c Revision 31 TRM 3.4-a Revision 31 TRM 3.3-d Revision 31 TRM 3.4-1 Revision 36 TRM 3.3-1 Revision 34 TRM 3.4-la Revision 34 TRM 3.3-2 Revision 59 TRM 3.4-lb Revision 34 TRM 3.3-3 Revision 31 TRM 3.4-2 Revision 31 TRM 3.3-4 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-8 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-10 Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-11 Revision 31 TRM 3.4-10 Revision 31 TRM 3.3-12 Revision 67 TRM 3.5-1 Revision 31 TRM 3.3-13 Revision 67 TRM 3.6-a Revision 70 TRM 3.3-13a Revision 67 TRM 3.6-1 Revision 60 TRM 3.3-14 Revision 67 TRM 3.6-2 Revision 67 TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-16 Revision 31 TRM 3. 6-4 Revision 55 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 31 TRM 3.3-18 Revision 52 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31 TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31 TRM 3.3-21 Revision 59 TRM 3.6-9 Revision 66 TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 31 TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31 TRM 3.3-28 Revision 31 TRM 3.6-16 Revision 31 TRM 3.3-29 Revision 31 TRM 3.6-17 Revision 31 TRM 3.3-30 Revision 31 TRM 3.6-18 Revision 31 TRM Vol. I LEP-1 REV 70 10/29/04

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-19 Revision 31 TRM 3.8-13 Revision 61 TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 31 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 31 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3. 6-32 Revision 70 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 31 TRM 3.7-a Revision 31 TRM 3.12-2 Revision 31 TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-4 Revision 53 TRM 3.7-2 Revision 70 TRM 3.12-5 Revision 53 TRM 3.7-3 Revision 70 TRM 3.12-6 Revision 53 TRM 3.7-4 Revision 31 TRM 3.12-7 Revision 31 TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 57 TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-9 Revision 31 TRM 3.12-12 Revision 31 TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 31 TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31 TRM 3.7-12 Revision 31 TRM 3.12-15 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 31 TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31 TRM 3.7-15 Revision 31 TRM 3.12-18 Revision 31 TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 31 TRM 3.7-18 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-20 Revision 31 TRM 3.12-23 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 31 TRM 3.8-3 Revision 60 TRM 3.12-27 Revision 31 TRM 3.8-4 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 31 TRM 3.8-6 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31 TRM 3.8-8 Revision 50 TRM 5.0-a Revision 31 TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 31 TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 31 TRM 3.8-11 Revision 50 TRM 5.0-3 Revision 31 TRM 3.8-12 Revision 31 TRM 5.0-4 Revision 31 TRM Vol. I LEP-2 REV 70 10/29/04

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 5.0-5 Revision 31 TRM B3.5-1 Revision 31 TRM 5.0-6 Revision 31 TRM B3.6.1-1 Revision 31 TRM 5.0-7 Revision 31 TRM B3.6.2-1 Revision 67 TRM 5.0-8 Revision 31 TRM B3.6.3-1 Revision 68 TRM 5.0-9 Revision 31 TRM B3.6.4-1 Revision 31 TRM B1.0-1 Revision 31 TRM B3.6.5-1 Revision 31 TRM B2.0-1 Revision 31 TRM B3.6.6-1 Revision 70 TRM B3.0-1 Revision 63 TRM B3.6.7-1 Revision 31 TRM B3.0-2 Revision 63 TRM B3.6.8-1 Revision 31 TRM B3.0-2a Revision 63. TRM B3.7.1-1 Revision 31 TRM B3.0-2b Revision 63 TRM B3.7.2-1 Revision 31 TRM B3.0-3 Revision 31 TRM B3.7.3-1 Revision 31 TRM B3.0-4 Revision 31 TRM B3.7.4-1 Revision 31 TRM B3.0-5 Revision 54 TRM B3.7.4-2 Revision 31 TRM B3.0-6 Revision 54 TRM B3.7.5-1 Revision 31 TRM B3.0-7 Revision 54 TRM B3.7.6-1 Revision 31 TRM B3.1-1 Revision 31 TRM B3.7.7-1 Revision 31 TRM B3.2-1 Revision 31 TRM B3.7.8-1 Revision 31 TRM B3.3.1-1 Revision 31 TRM B3.7.9-1 Revision 31 TRM B3.3.1-2 Revision 31 TRM B3.7.9-2 Revision 31 TRM B3.3.2-1 Revision 31 TRM B3.8.1-1 Revision 31 TRM B3.3.2-2 Revision 31 TRM B3.8.2-1 Revision 31 TRM B3.3.3-1 Revision 67 TRM B3.8.3-1 Revision 31 TRM B3.3.4-1 Revision 31 TRM B3.8.4-1 Revision 31 TRM B3.3.4-2 Revision 31 TRM B3.8.5-1 Revision 31 TRM B3.3.5-1 Revision 31 TRM B3.8.6-1 Revision 43 TRM B3.3.5-2 Revision 31 TRM B3.9.1-1 Revision 31 TRM B3.3.6-1 Revision 31 TRM B3.9.2-1 Revision 65 TRM B3.3.6-2 Revision 31 TRM B3.9.3-1 Revision 31 TRM B3.3.6-3 Revision 31 TRM B3.9.4-1 Revision 31 TRM B3.3.6-4 Revision 31 TRM B3.10-1 Revision 31 TRM B3.3.6-5 Revision 31 TRM B3.11.1-1 Revision 31 TRM B3.3.7-1 Revision 31 TRM B3.12.1-1 Revision 31 TRM B3.3.7-2 Revision 31 TRM B3.12.2-1 Revision 44 TRM B3.3.8-1 Revision 31 TRM B3.12.3-1 Revision 31 TRM B3.3.9-1 Revision 31 TRM B3.12.4-1 Revision 31 TRM B3.3.10-1 Revision 56 TRM B3.12.5-1 Revision 31 TRM B3.3.11-1 Revision 45 TRM B3.12.6-1 Revision 31 TRM B3.3.12-1 Revision 62 TRM B3.12.7-1 Revision 31 TRM B3.3.13-1 Revision 31 TRM B3.12.8-1 Revision 31 TRM B3.3.14-1 Revision 31 TRM B3.4.1-1 Revision 31 TRM B3.4.1-2 Revision 34 TRM B3.4.1-3 Revision 34 TRM B3.4.1-4 Revision 34 TRM B3.4.1-5 Revision 34 TRM B3.4.2-1 Revision 31 TRM B3.4.3-1 Revision 31 TRM B3.4.4-1 Revision 31 TRM B3.4.5-1 Revision 31 TRM B3.4.6-1 Revision 31 TRM B3.4.7-1 Revision 31 TRM Vol. I LEP-3 REV 70 10/29/04

FERMI 2 - TECHNICAL REQUIREMENTS MAMNUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 10, Revision 1 Page Revision Notation Page 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 1 10 1 11 1 12 1 13 1 14 1 15 1 16 1 17 1 18 1 19 1 20 1 TRM Vol. I LEP-4 REV 70 10/29/04

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I Table of Contents (Cont'd)

Section and Title Page TR 3.4.2 Safety Relief Valve (SRV) Position Indication .... TRM 3.4-2 TR 3.4.3 Reactor Coolant System (RCS) Leakage Detection System ........................................... TRM 3.4-3 TR 3.4.4 Reactor Pressure Vessel Water Level - Cold Shutdown ......................................... TRM 3.4-4 TR 3.4.5 Chemistry ........................................ TRM 3.4-5 TR 3.4.6 Structural Integrity ............................. TRM 3.4-9 TR 3.4.7 Recirculation Pump MG Set Scoop Tube ............. TRM 3.4-10 TR 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLANT (RCIC) SYSTEM (Blank) ............. TRM 3.5-1 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.1 Suppression Chamber .............................. TRM 3.6-1 TR 3.6.2 Primary Containment Hydrogen Recombiners (Blank) . TRM 3.6-2 TR 3.6.3 Primary Containment Isolation Valves (PCIVs) ..... TRM 3.6-3 TR 3.6.4 Reactor Building-to-Suppression Chamber Vacuum Breaker Position Indication ...................... TRM 3.6-27 TR 3.6.5 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication .............................. TRM 3.6-29 TR 3.6.6 Main Steam Isolation Valve (MSIV) Leakage Control System (LCS) (Blank) ............................. TRM 3.6-32 I TR 3.6.7 Secondary Containment Isolation Valves (SCIVs) ... TRM 3.6-33 TR 3.6.8 Drywell Spray .................................... TRM 3.6-34 TR 3.7 PLANT SYSTEMS TR 3.7.1 Ultimate Heat Sink (UHS) Minimum Temperature ..... TRM 3.7-1 TR 3.7.2 Control Room Emergency Filtration (CREF) System TRM 3.7-2 TR 3.7.3 Control Center Air Temperature .................... TRM 3.7-4 TR 3.7.4 Shore Barrier Protection ......................... TRM 3.7-5 TR 3.7.5 Sealed Source Contamination ...................... TRM 3.7-9 TR 3.7.6 Main Turbine Bypass System ....................... TRM 3.7-11 TR 3.7.7 Appendix R Alternative Shutdown Auxiliary Systems TRM 3.7-12 TR 3.7.8 (Blank) .......................................... TRM 3.7-19 TR 3.7.9 Snubbers ......................................... TRM 3.7-20 TR 3.8 ELECTRICAL POWER SYSTEMS TR 3.8.1 AC Circuits Inside Primary Containment ........... TRM 3.8-1 TR 3.8.2 (Blank) .......................................... TRM 3.8-2 TR 3.8.3 AC Sources ....................................... TRM 3.8-3 TR 3.8.4 Electrical Equipment Protective Devices Motor-Operated Valves Thermal Overload Protection TRM 3.8-5 TR 3.8.5 Primary Containment Penetration Conductor Overcurrent Protection Devices ................... TRM 3.8-12 TR 3.8.6 Standby Liquid Control (SLC) System Associated Isolation Devices ................................ TRM 3.8-16 (continued)

TRM VOL I TRM-ii REV 70 10/04

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I Table of Contents (Cont'd)

Section and Title Page TR B3.6 CONTAINMENT SYSTEMS TR B3.6.1 Suppression Chamber ............................. TRM B3.6.1-1 TR B3.6.2 Primary Containment Hydrogen Recombiners (Blank) TRM B3.6.2-1 TR B3.6.3 Primary Containment Isolation Valves (PCIVs) .... TRM B3.6.3-1 TR B3.6.4 Reactor Building-to-Suppression Chamber Vacuum Breaker Position Indication ..................... TRM B3.6.4-1 TR B3.6.5 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication ............................. TRM B3.6.5-1 TR B3.6.6 Main Steam Isolation Valve (MSIV) Leakage Control System (LCS) (Blank) ............................ TRM B3.6.6-1 I TR B3.6.7 Secondary Containment Isolation Valves (SCIVs) .. TRM B3.6.7-1 TR B3.6.8 Drywell Spray ................................... TRM B3.6.8-1 TR B3.7 PLANT SYSTEMS TR B3.7.1 Ultimate Heat Sink (UHS) Minimum Temperature .... TRM B3.7.1-1 TR B3.7.2 Control Room Emergency Filtration (CREF) System . TRM B3.7.2-1 TR B3.7.3 Control Center Air Temperature .................. TRM B3.7.3-1 TR B3.7.4 Shore Barrier Protection ........................ TRM B3.7.4-1 TR B3.7.5 Sealed Source Contamination ..................... TRM B3.7.5-1 TR B3.7.6 Main Turbine Bypass System ...................... TRM B3.7.6-1 TR B3.7.7 Appendix R Alternative Shutdown Auxiliary Systems ......................................... TRM B3.7.7-1 TR B3.7.8 (Blank) ......................................... TRM B3.7.8-1 TR B3.7.9 Snubbers ........................................ TRM B3.7.9-1 TR B3.8 ELECTRICAL POWER SYSTEMS TR B3.8.1 AC Circuits Inside Primary Containment .......... TRM B3.8.1-1 TR B3.8.2 (Blank) ......................................... TRM B3.8.2-1 TR B3.8.3 AC Sources ...................................... TRM B3.8.3-1 TR B3.8.4 Electrical Equipment Protective Devices Motor-Operated Valves Thermal Overload Protection ...................................... TRM B3.8.4-1 TR B3.8.5 Primary Containment Penetration Conductor Overcurrent Protection Devices .................. TRM B3.8.5-1 TR B3.8.6 Standby Liquid Control System Associated Isolation Devices ............................... TRM B3.8.6-1 TR B3.9 REFUELING OPERATIONS TR B3.9.1 Communications .................................. TRM B3.9.1-1 TR B3.9.2 Refueling Platform .............................. TRM B3.9.2-1 TR B3.9.3 Crane Travel - Spent Fuel Storage Pool .. ........ TRM B3.9.3-1 TR B3.9.4 Reactor Pressure Vessel Water Level - Refueling . TRM B3.9.4-1 TR B3.10 SPECIAL OPERATIONS (Blank) ... ...................... TRM B3.10-1 TR B3.11 RADIOACTIVE EFFLUENTS TR B3.11.1 Temporary Outdoor Storage Tank Radioactivity .... TRM B3.11.1-1 (continued)

TRM VOL I TRM-v REV 70 04/04

SECTION 3.6 DETAILED INDEX OF SECTION Page TR 3.6.1 Suppression Chamber ............................... TRM 3.6-1 (TRLCO, ACTION, TRSR)

TR 3.6.2 Primary Containment Hydrogen Recombiners .......... TRM 3.6-2 (TRLCO, ACTION, TRSR)

TR 3.6.3 Primary Containment Isolation Valves (PCIVs) ...... TRM 3.6-3 (Tables TR3.6.3-1 and TR3.6.3-2)

Table TR3.6.3-1 Primary Containment Isolation Valves .............. TRM 3.6-3 (Technical Specification 3.6.1.3 maximum isolation times)

Table TR3.6.3-2 PCIVs/Primary Containment Flanges High Located in Locked High Radiation Areas ....................... TRM 3.6-25 (Technical Specification 3.6.1.3 PCIVs located in High Radiation areas)

TR 3.6.4 Reactor Building-to-Suppression Chamber Vacuum Breaker Position Indication .... ................... TRM 3.6-27 (TRLCO, ACTION, TRSR)

TR 3.6.5 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication ............................... TRM 3.6-29 (TRLCO, ACTION, TRSR)

TR 3.6.6 Main Steam Isolation Valve (MSIV) Leakage Control System (LCS) (Blank)  ;............................ TRM 3.6-32 l TR 3.6.7 Secondary Containment Isolation Valves (SCIVs) .... TRM 3.6-33 (Table TR3.6.7-1)

Table TR3.6.7-1 Secondary Containment Ventilation System Power Operated Isolation Valves ......................... TRM 3.6-33 (Technical Specification 3.6.4.2 maximum isolation times)

TR 3.6.8 Drywell Spray .... ..................... TEM 3.6-34 (TRLCO, ACTION, TRSR)

TRM Vol. I TRM 3.6-a REV 70 10/04

MSIV Leakage Control System TR 3.6.6 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.6 Main Steam Isolation Valve (MSIV) Leakage Control System (LCS)

(Deleted) I THIS PAGE INTENTIONALLY LEFT BLANK TRM Vol. I TRM 3.6-32 REV 70 10/04

CREF System TR 3.7.2 TR 3.7 PLANT SYSTEMS TR 3.7.2 Control Room Emergency Filtration (CREF) System The CREF System duct work subject to Technical Specifications SR 3.7.3.3 is listed in Table TR3.7.2-1.

TABLE TR3.7.2-1 (Page 1 of 1)

CREF System Duct Work (SR 3.7.3.3)

DUCTS

1. Normal intake between damper T4100F042 and the Control Room wall (Penetration V-430).
2. Normal exhaust between damper T4100F044 and the Control Room wall (Penetration V-429).
3. Discharge of recirculation fans T4100CO47, 48 between the discharge flanges on filter train T4100DO16 and the St Floor CCEVAC Equipment Room wall (Penetration V-504B).
4. Division II supply plenum between the Control Room wall (Penetration V-431) and the 4tb Floor Aux. Building ceiling (Penetration V-9014).
5. Emergency intake between the discharge flange on filter train T4100DOll and the inlet flange on filter train T4100D016.
6. Recirculation duct between the 5th Floor CCEVAC Equipment Room wall (Penetration V-504A) and the inlet flange on filter train T4100D016.

TRM Vol. I TRM 3.7-2 REV 70 10/04

CREF System TR 3.7.2 THIS PAGE INTENTIONALLY LEFT BLANK TRM Vol. I TRM 3.*7-~3 REV 70 10/04

MSIV Leakage Control System TR B3.6.6 TR B3.6 CONTAINMENT SYSTEMS TR B3.6.6 Main Steam Isolation Valve (MSIV) Leakage Control System (LCS)

(Deleted)

THIS PAGE INTENTIONALLY LEFT BLANK I

TRM Vol. I TRM B3.6.6-1 Rev. 70 10/04