Letter Sequence Approval |
---|
|
|
MONTHYEARML0204602722002-02-14014 February 2002 Issuance of Amendment Integrated Leakage Rate Testing Interval Extension Project stage: Approval ML0205003902002-02-14014 February 2002 Tech Spec Pages for Amendment No. 178 Integrated Leakage Rate Testing Interval Extension Project stage: Other 2002-02-14
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000382/20244022024-10-10010 October 2024 Security Baseline Inspection Report 05000382/2024402 Public IR 05000382/20244032024-10-0909 October 2024 Security Baseline Inspection Report 05000382/2024403 IR 05000382/20240112024-10-0101 October 2024 State Fire Protection Team Inspection Report 05000382/2024011 IR 05000382/20230042024-09-25025 September 2024 Integrated Inspection Report 05000382/2023004, Disputed Non-Cited Violation Revised ML24268A1132024-09-24024 September 2024 Acknowledgment of Response to NRC Inspection Report 05000382/2024013, and Notice of Violation ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000382/20240052024-08-21021 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2024005 IR 05000382/20240132024-08-20020 August 2024 Notice of Violation; NRC Inspection Report 05000382/2024013 ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment 05000382/LER-2024-004, Automatic Reactor Trip Due to Lightning Strike2024-08-15015 August 2024 Automatic Reactor Trip Due to Lightning Strike IR 05000382/20240022024-08-0808 August 2024 Integrated Inspection Report 05000382/2024002 ML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML24213A1632024-08-0101 August 2024 2024 Waterford Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification 05000382/LER-2024-003, Automatic EFAS Actuation During Surveillance Test2024-07-10010 July 2024 Automatic EFAS Actuation During Surveillance Test ML24150A3852024-06-0404 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2024011) and Request for Information ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24141A1012024-05-20020 May 2024 Amended Integrated Inspection Report 05000382/2023004 05000382/LER-2024-002, Automatic Reactor Trip Due to Transformer Failure2024-05-16016 May 2024 Automatic Reactor Trip Due to Transformer Failure 05000382/LER-2024-001, Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure2024-05-15015 May 2024 Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000382/20240012024-05-0606 May 2024 Integrated Inspection Report 05000382/2024001 ML24067A1032024-04-25025 April 2024 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams IR 05000382/20244012024-03-18018 March 2024 Material Control and Accounting Program Inspection Report 05000382/2024401 ML24074A3742024-03-15015 March 2024 Acknowledgement of Response to NRC Inspection Report 05000382/2023004 and Disputed Non-Cited Violation ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24032A0032024-03-0606 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0053 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000382/20230062024-02-28028 February 2024 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2023006 05000382/LER-2023-004, Non-Compliance with Technical Specifications Due to Performing Startup Channel 1 Functional Testing During Fuel Movement2024-02-14014 February 2024 Non-Compliance with Technical Specifications Due to Performing Startup Channel 1 Functional Testing During Fuel Movement ML24039A1992024-02-12012 February 2024 – Integrated Inspection Report 05000382/2023004 IR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and 05000382/LER-2023-003, Steam Generator Tube Degradation Indicated by Failed In-Situ Pressure Testing2023-12-30030 December 2023 Steam Generator Tube Degradation Indicated by Failed In-Situ Pressure Testing ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000382/20230032023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 2024-09-06
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML24096B4992024-04-0101 April 2024 Slides: Pre-Submittal Meeting for License Amendment Request to Modify Selected Surveillance Requirements in Support of the Surveillance Frequency Control Program ML23059A2592023-03-0707 March 2023 – Correction to Issuance to Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML22322A1092023-02-17017 February 2023 Issuance of Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML22300A2082022-11-30030 November 2022 Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22194A9012022-07-20020 July 2022 Issuance of Amendment No. 268 Adoption of Technical Specification Task Forcetraveler TSTF-569, Revise Response Time Testing Definition, Revision 2 ML22153A4452022-07-0808 July 2022 Issuance of Amendment No. 267 for Reactor Coolant System Pressure/Temperature Limits and Low Temperature Overpressure Setpoints Applicable for 55 Effective Full Power Years ML22145A0152022-05-27027 May 2022 Issuance of Amendment No. 266 to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22075A1022022-04-29029 April 2022 Issuance of Amendment No. 264 to Relocate Chemical Detection System Technical Specifications to Technical Requirements Manual ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML21313A0082021-12-0808 December 2021 Issuance of Amendments to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21131A2432021-08-24024 August 2021 Issuance of Amendment No. 260 Digital Upgrade to the Core Protection and Control Element Assembly Calculator System ML21082A3022021-05-19019 May 2021 Issuance of Amendment No. 259 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML21085A8652021-04-0808 April 2021 Summary of March 17, 2021, Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (EPID L-2020-LLA-0164) Non ML20280A3292020-10-20020 October 2020 Issuance of Amendment No. 258 Regarding Technical Specification 3/4.8.1 Surveillance Requirements ML20205L5742020-08-25025 August 2020 Issuance of Amendment No. 257 Control Room Air Condition System Technical Specifications ML19275D4382019-10-24024 October 2019 Redacted - Issuance of Amendment No. 256 for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19164A0012019-06-28028 June 2019 Issuance of Amendment No. 254 Regarding Revision of Technical Specification 3/4.7.4, Ultimate Heat Sink, ML19022A3372019-02-13013 February 2019 Issuance of Amendment No. 253 to Revise Section 15.4.3.1 of the Updated Final Safety Analysis Report to Account for Fuel Misload ML19035A5202019-02-0606 February 2019 Correction to Issuance of Amendment No. 252 Adoption of the Raptor-M3G Code for Neutron Fluence Calculations ML18275A2032018-12-27027 December 2018 Current Renewed Facility Operating License NPF-38 Attachment 2 and Tech Specs ML18275A2152018-12-27027 December 2018 Issuance of Renewed Facility Operating License No. NPF-38 for Waterford Steam Electric Station, Unit 3 CAC Nos. MF7492 and MF7493) ML18275A1332018-12-27027 December 2018 Current Renewed Facility Operating License NPF-38 ML18207A2702018-08-20020 August 2018 Notice of Availability of the Draft Supplement Environmental Impact Statement for License Renewal of Waterford Steam Electric Station, Unit 3, for Public Comment ML18180A1122018-08-20020 August 2018 Notice of Availability of the Draft Supplemental Environmental Impact Statement for License Renewal of Waterford Steam Electric Station, Unit 3 for Public Comment ML18180A1132018-08-20020 August 2018 Notice of Availability of the Draft Supplemental Environmental Impact Statement for License Renewal of Waterford Steam Electric Station, Unit 3 for Public Comment ML18180A2962018-08-20020 August 2018 Notice of Availability of the Draft Supplemental Environmental Impact Statement for License Renewal of Waterford Steam Electric Station, Unit 3, for Public Comment ML18026B0532018-04-26026 April 2018 Issuance of Amendment No. 251 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control,(Cac No. MF9537; EPID L-2017-LLA-0205) ML17192A0072017-07-27027 July 2017 Issuance of Amendment No. 250 Adoption of Technical Specifications Task Force Traveler TSTF 545, Revision 3 ML16159A4192016-07-26026 July 2016 Issuance of Amendment No. 249 Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control ML16126A0332016-06-27027 June 2016 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) ML16077A2702016-05-10010 May 2016 Issuance of Amendment No. 247 Regarding Cyber Security Plan Milestone 8 Full Implementation Schedule ML15289A1432015-11-13013 November 2015 Redacted - Issuance of Amendment No. 246 Changes to Technical Specification 3.1.3.4 Regarding Control Element Assembly Drop Times ML15139A4832015-08-31031 August 2015 Issuance of Amendment No. 245 Change to Updated Final Safety Analysis Report Clarifying Pressurizer Heaters Function for Natural Circulation at the Onset of a Loss of Offsite Power ML15217A1432015-08-24024 August 2015 Issuance of Amendment No. 244 Extension of the Integrated Leak Rate Testing to 15 Years ML15174A2272015-07-29029 July 2015 Issuance of Amendment of Technical Specifications s 3.9.6 and 3.9.7 to the Technical Requirements Manual ML15005A1262015-02-23023 February 2015 Issuance of Amendment Multiple Administrative Issues with the Technical Specification ML14321A7132014-12-10010 December 2014 Issuance of Amendment No. 241, Revise Operating License Condition for Change to Cyber Security Plan Milestone 8 Full Implementation Date ML13025A3062013-03-14014 March 2013 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical Specifications ML12278A3312012-12-20020 December 2012 Issuance of Amendment No. 238, Relocate Technical Specification (TS) 3.4.6, TS 3.7.5, TS 3.7.9, and TS 3.9.5 to the Technical Requirements Manual ML12244A0592012-12-20020 December 2012 Issuance of Amendment No. 239, Revise Physical Protection License Condition Related to Milestone 6 of the Cyber Security Plan Implementation Schedule ML12250A4352012-10-31031 October 2012 Issuance of Amendment No. 237, Revise Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train ML12152A3412012-07-31031 July 2012 Issuance of Amendment No. 236, Revise Technical Specifications Related to Steam Generator Tube Integrity to Support Replacement of Steam Generators ML1209401712012-04-25025 April 2012 Issuance of Amendment No. 235, Revise Technical Specification Applicability and Action Language for Revised Fuel Handling Accident Analysis ML1118000212011-07-20020 July 2011 Issuance of Amendment No. 234, Revise License Condition and Approval of Cyber Security Plan and Associated Implementation Schedule ML1106302592011-03-23023 March 2011 Issuance of Amendment No. 233, Revise Technical Specification Table 3.4-1 to Add Shutdown Cooling Suction Bypass Isolation Valves ML1104101192011-02-28028 February 2011 Issuance of Amendment No. 232, Approval of Change to Final Safety Analysis Report for Leak-Before-Break of the Pressurizer Surge Line ML1101400262011-02-23023 February 2011 Issuance of Amendment No. 231, Modify Technical Specification 3/4.9.4, Containment Building Penetrations, to Allow Alternative Means of Penetration Closure During Refueling Operations 2024-08-07
[Table view] Category:Safety Evaluation
MONTHYEARML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML24067A1032024-04-25025 April 2024 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML22322A1092023-02-17017 February 2023 Issuance of Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML22300A2082022-11-30030 November 2022 Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22194A9012022-07-20020 July 2022 Issuance of Amendment No. 268 Adoption of Technical Specification Task Forcetraveler TSTF-569, Revise Response Time Testing Definition, Revision 2 ML22153A4452022-07-0808 July 2022 Issuance of Amendment No. 267 for Reactor Coolant System Pressure/Temperature Limits and Low Temperature Overpressure Setpoints Applicable for 55 Effective Full Power Years ML22145A0152022-05-27027 May 2022 Issuance of Amendment No. 266 to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22075A1022022-04-29029 April 2022 Issuance of Amendment No. 264 to Relocate Chemical Detection System Technical Specifications to Technical Requirements Manual ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML22061A2172022-03-15015 March 2022 Revision of the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML22007A3172022-01-18018 January 2022 1, River Bend Station 1, and Waterford Steam Electric Station 3 - Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML21313A0082021-12-0808 December 2021 Issuance of Amendments to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21166A1832021-09-15015 September 2021 Issuance of Amendment No. 261 Regarding Removal and Relocation of Boration System Technical Specifications ML21131A2432021-08-24024 August 2021 Issuance of Amendment No. 260 Digital Upgrade to the Core Protection and Control Element Assembly Calculator System ML21082A3022021-05-19019 May 2021 Issuance of Amendment No. 259 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML20280A3292020-10-20020 October 2020 Issuance of Amendment No. 258 Regarding Technical Specification 3/4.8.1 Surveillance Requirements ML20205L5742020-08-25025 August 2020 Issuance of Amendment No. 257 Control Room Air Condition System Technical Specifications ML20226A2722020-08-18018 August 2020 Request to Use a Provision of a Later Edition of the ASME BPV Code, Section XI ML20022A2582020-01-28028 January 2020 Re-Issuance of Approval of Relief Request WF3-RR-19 2, Relief from the Requirements of Asme Code Section XI Regarding Alternate Repair of Degraded Drain Line of Chemical and Volume Control ML20002A0202020-01-13013 January 2020 Approval of Relief Request WF3-RR-19-2, Relief from the Requirements of Asme Code Section XI Regarding Alternate Repair of Degraded Drain Line of Chemical and Volume Control System ML19275D4382019-10-24024 October 2019 Redacted - Issuance of Amendment No. 256 for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components ML19282D8922019-10-15015 October 2019 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19247B1972019-09-0909 September 2019 Approval of Relief Request W3-ISI-032,Relief from the Requirements of ASME Code Section XI Regarding Volumetric Examination ML19232A0252019-08-27027 August 2019 Authorization of Proposed Alternative to ASME Code Section XI, IWA-4000, Repair/Replacement Activities ML19164A0012019-06-28028 June 2019 Issuance of Amendment No. 254 Regarding Revision of Technical Specification 3/4.7.4, Ultimate Heat Sink, ML19157A3162019-06-12012 June 2019 Authorization of Proposed Alternative to ASME Code Case N-770-2 ML19022A3372019-02-13013 February 2019 Issuance of Amendment No. 253 to Revise Section 15.4.3.1 of the Updated Final Safety Analysis Report to Account for Fuel Misload ML18282A0302018-10-18018 October 2018 Proposed Alternative to ASME Code, Section XI, Regarding Charging Pipe Visual Inspection ML18180A2982018-07-23023 July 2018 Issuance of Amendment No. 252 Adoption of the Raptor-M3G Code for Neutron Fluence Calculations ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 ML18026B0532018-04-26026 April 2018 Issuance of Amendment No. 251 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control,(Cac No. MF9537; EPID L-2017-LLA-0205) ML17341A1202017-12-11011 December 2017 Relief Request PRR-WF3-2017-3, Request for Alternative to ASME OM Code Requirements for Comprehensive Testing of High Pressure Safety Injection Pump AB (CAC No. MF9875; EPID L-2017-LLR-0049) ML17328A8822017-11-29029 November 2017 Requests for Relief GRR-1, PRR-1 and PRR-2, Alternatives to ASME OM Code Requirements for Inservice Testing for the Fourth 10-Year Program Interval (CAC Nos. MF9869, 9870, and 9871; EPID L-2017-LRM-0045-47) ML17192A0072017-07-27027 July 2017 Issuance of Amendment No. 250 Adoption of Technical Specifications Task Force Traveler TSTF 545, Revision 3 ML17069A1872017-03-22022 March 2017 Request for Alternative to 10 CFR 50.55a(c) ASME Code Section III Code Case 1361-1, Relief Request W3-ISI-024 ML17045A1482017-03-0303 March 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16235A2282016-12-0909 December 2016 Request for Alternative Test Plan to American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants ML16278A0172016-10-19019 October 2016 Entergy Fleet Relief Request RR-EN-ISI-15-1, Alternative to Maintain Inservice Inspection Related to Activities to the 2001 Edition/2003 Addendum of ASME Section XI Code ML16251A6202016-09-13013 September 2016 Entergy Fleet Request for Approval of Change to the Entergy Quality Assurance Program Manual (CAC Nos. MF7086 - MF7097) ML16159A4192016-07-26026 July 2016 Issuance of Amendment No. 249 Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control ML16182A2702016-07-0606 July 2016 Relief Request PRR-WF3-2016-1, Alternative to the Inservice Testing Program ML16126A0332016-06-27027 June 2016 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 ML16093A0282016-05-31031 May 2016 Entergy Services, Inc., Proposed Alternative to Utilize ASME Code Case N-789-1, Relief Request RR-EN-15-1, Revision 1 ML16077A2702016-05-10010 May 2016 Issuance of Amendment No. 247 Regarding Cyber Security Plan Milestone 8 Full Implementation Schedule ML15289A1432015-11-13013 November 2015 Redacted - Issuance of Amendment No. 246 Changes to Technical Specification 3.1.3.4 Regarding Control Element Assembly Drop Times 2024-08-07
[Table view] Category:Technical Specifications
MONTHYEARML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program W3F1-2024-0011, Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program2024-05-0808 May 2024 Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22075A1022022-04-29029 April 2022 Issuance of Amendment No. 264 to Relocate Chemical Detection System Technical Specifications to Technical Requirements Manual ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21148A0522021-06-0808 June 2021 Correction to License Amendment 214 Request to Support Next Generation Fuel; Review and Approval of Revised ECCS Performance Analysis; and Review and Approval of Supplement to the ECCS Performance Analysis ML21116A1432021-04-26026 April 2021 (Waterford 3) - Revision to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual ML20148M1062020-06-22022 June 2020 Corrections to Technical Specifications Issued in Amendments Nos. 102 and 225 and with the Renewed License ML20113E8362020-04-23023 April 2020 Summary of March 19, 2020, Category 1 Public Meeting with Entergy Operations Inc. a Planned LAR to Install Digital Systems in Accordance with Di&C ISG-06 Revision 2, Licensing Processes at Waterford Steam Electric Station ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19022A3372019-02-13013 February 2019 Issuance of Amendment No. 253 to Revise Section 15.4.3.1 of the Updated Final Safety Analysis Report to Account for Fuel Misload ML17192A0072017-07-27027 July 2017 Issuance of Amendment No. 250 Adoption of Technical Specifications Task Force Traveler TSTF 545, Revision 3 ML16077A2702016-05-10010 May 2016 Issuance of Amendment No. 247 Regarding Cyber Security Plan Milestone 8 Full Implementation Schedule W3F1-2016-0010, Responses to Request for Additional Information Regarding the Risk-Informed Surveillance Requirements License Amendment Request (LAR)2016-03-0303 March 2016 Responses to Request for Additional Information Regarding the Risk-Informed Surveillance Requirements License Amendment Request (LAR) ML15289A1432015-11-13013 November 2015 Redacted - Issuance of Amendment No. 246 Changes to Technical Specification 3.1.3.4 Regarding Control Element Assembly Drop Times ML15244B3862015-09-0303 September 2015 Correction to Issuance of Amendment Extension of the Integrated Leak Rate Testing to 15 Years ML15139A4832015-08-31031 August 2015 Issuance of Amendment No. 245 Change to Updated Final Safety Analysis Report Clarifying Pressurizer Heaters Function for Natural Circulation at the Onset of a Loss of Offsite Power ML15217A1432015-08-24024 August 2015 Issuance of Amendment No. 244 Extension of the Integrated Leak Rate Testing to 15 Years ML15138A4402015-08-14014 August 2015 Orders Approving Transfer of Facility Operating Licenses and Indirect Transfer, Draft Conforming Amendment, and Safety Evaluation W3F1-2015-0061, Provides Supplement to Revise Control Element Assembly Drop Times Associated with Technical Specification 3.1.3.42015-08-14014 August 2015 Provides Supplement to Revise Control Element Assembly Drop Times Associated with Technical Specification 3.1.3.4 ML15174A2272015-07-29029 July 2015 Issuance of Amendment of Technical Specifications s 3.9.6 and 3.9.7 to the Technical Requirements Manual ML14321A7132014-12-10010 December 2014 Issuance of Amendment No. 241, Revise Operating License Condition for Change to Cyber Security Plan Milestone 8 Full Implementation Date W3F1-2014-0052, License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years2014-08-28028 August 2014 License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications W3F1-2012-0084, Technical Specification Change for Dry Cooling Tower Fans Out of Service for Ultimate Heat Sink2012-10-0808 October 2012 Technical Specification Change for Dry Cooling Tower Fans Out of Service for Ultimate Heat Sink W3F1-2012-0028, Supplement 2 of License Amendment Request to Revise Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train2012-05-22022 May 2012 Supplement 2 of License Amendment Request to Revise Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train W3F1-2011-0067, License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train.2011-10-13013 October 2011 License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train. ML1125103192011-09-20020 September 2011 Correction of an Error in Amendment No. 226, Administrative Changes to Technical Specifications 6.9.1.11 and 6.9.1.11.1 Relating to Core Operating Limits Report ML1109501232011-04-0404 April 2011 Attachment 2 to W3F1-2011-0021, Proposed Operating License Change (Mark-up) and Attachment 3, Revised Operating License Page ML1021001582010-09-13013 September 2010 Issuance of Amendment No. 228, Modify Technical Specification Tables 2.2-1 and 3.3-1 to Clarify Notes and Actions ML1021504662010-09-13013 September 2010 Issuance of Amendment No. 227, Modify Technical Specification 3/4.9.7, Crane Travel - Fuel Handling Building to Permit Certain Operations Needed for Dry Cask Storage of Spent Nuclear Fuel W3F1-2010-0065, Response to Request for Additional Information Associated with Technical Specification Table 3.4-1 Isolation Valve Addition2010-08-12012 August 2010 Response to Request for Additional Information Associated with Technical Specification Table 3.4-1 Isolation Valve Addition W3F1-2010-0047, License Amendment Request for Proposed Change to Technical Specification 3.7.1.2, Emergency Feedwater System.2010-07-20020 July 2010 License Amendment Request for Proposed Change to Technical Specification 3.7.1.2, Emergency Feedwater System. 2CAN051001, Response to Request for Additional Information Associated with Core Operating Limits Report References2010-05-17017 May 2010 Response to Request for Additional Information Associated with Core Operating Limits Report References ML1011100352010-04-22022 April 2010 Correction to Technical Specification Page 3/4 3-10 Issued with Amendment No. 225 Technical Specification Change to Relocate Steam Generator Level - High Trip Function ML1005504632010-02-22022 February 2010 Request for Amendment to Technical Specification Table 3.4-1 Isolation Valve Addition W3F1-2010-0011, License Amendment Request, Technical Specification Change Regarding Steam Generator Program2010-02-22022 February 2010 License Amendment Request, Technical Specification Change Regarding Steam Generator Program W3F1-2009-0045, License Amendment Request to Modify Technical Specification Information for Table 2.2-1 and Table 3.3-12009-10-22022 October 2009 License Amendment Request to Modify Technical Specification Information for Table 2.2-1 and Table 3.3-1 W3F1-2009-0021, License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit2009-06-0303 June 2009 License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit W3F1-2008-0051, Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 32009-01-0808 January 2009 Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 3 ML0819904722008-07-30030 July 2008 License and Technical Specification Pages, Issuance of Amendment No. 216, Modify Diesel Generator Fuel Oil Testing Surveillance Requirements ML0812700362008-05-0909 May 2008 Tech Spec Page for Correction to Amendment 214 Request to Support Next Generation Fuel; Review & Approval of Revised ECCS Performance Analysis; & Review & Approval of Supplement to ECCS Performance Analysis ML0803800062008-04-16016 April 2008 License Page 4 and Technical Specification Page 5-5, Issuance of Amendment No. 215 Use of Optimized ZIRLO-TM Fuel Rod Cladding ML0808800152008-04-15015 April 2008 Tech Spec Pages for Amendment 214, Request to Support Next Generation Fuel; Review and Approval of ECCS Performance Analysis; and Review and Approval of Supplement to ECCS Performance Analysis ML0804401272008-02-12012 February 2008 2/12/2008 E-mail from Licensee Enclosing Markup of Technical Specification Page 5-5, Supplement to 4/24/2007 License Amendment Request Use of Optimized ZIRLO-TM Fuel Rod Cladding W3F1-2008-0001, License Amendment Request NPF-38-275, Containment Isolation Valves.2008-01-0202 January 2008 License Amendment Request NPF-38-275, Containment Isolation Valves. W3F1-2007-0033, License Amendment Request NPF-38-273 to Modify Requirements Regarding Control Room Envelope Habitability2007-08-16016 August 2007 License Amendment Request NPF-38-273 to Modify Requirements Regarding Control Room Envelope Habitability ML0711603482007-04-24024 April 2007 License Amendment Request to Allow the Use of Optimized Zirlo Fuel Rod Cladding 2024-08-07
[Table view] |
Text
February 14, 2002 Mr. Joseph E. Venable Vice President Operations Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - ISSUANCE OF AMENDMENT RE: INTEGRATED LEAKAGE RATE TESTING INTERVAL EXTENSION (TAC NO. MB2461)
Dear Mr. Venable:
The Commission has issued the enclosed Amendment No. 178 to Facility Operating License No. NPF-38 for the Waterford Steam Electric Station, Unit 3. The amendment consists of changes to the Technical Specifications in response to your application dated July 23, 2001, as supplemented by letters dated September 21, and November 8, 2001.
The amendment postpones the next Type A test performed after May, 12, 1991, to no later than May 11, 2006. This results in an extended interval of 15 years for performance of the next integrated leakage rate test.
A copy of our related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/RA/
N. Kalyanam, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-382
Enclosures:
- 1. Amendment No. 178 to NPF-38
- 2. Safety Evaluation cc w/encls: See next page
February 14, 2002 Mr. Joseph E. Venable Vice President Operations Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - ISSUANCE OF AMENDMENT RE: INTEGRATED LEAKAGE RATE TESTING INTERVAL EXTENSION (TAC NO. MB2461)
Dear Mr. Venable:
The Commission has issued the enclosed Amendment No. 178 to Facility Operating License No. NPF-38 for the Waterford Steam Electric Station, Unit 3. The amendment consists of changes to the Technical Specifications in response to your application dated July 23, 2001, as supplemented by letters dated September 21, and November 8, 2001.
The amendment postpones the next Type A test performed after May, 12, 1991, to no later than May 11, 2006. This results in an extended interval of 15 years for performance of the next integrated leakage rate test.
A copy of our related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/RA/
N. Kalyanam, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-382
Enclosures:
- 1. Amendment No. 178 to NPF-38
- 2. Safety Evaluation cc w/encls: See next page DISTRIBUTION:
PUBLIC PDIV-1 Reading RidsNrrDripRtsb (WBeckner)
RidsNrrDlpmPdiv (SRichards) RidsOgcRp G.Hill(2)
RidsAcrsAcnwMailCenter RidsNrrDlpmPdivLpdiv1 (RGramm)
RidsNrrPMNKalyanam RidsNrrLADJohnson MSnodderly RidsRgn4MailCenter (KBrockman) L.Hurley, RIV D. Bujol, RIV Accession No.: ML020460272 *Staff provided SE used with minor editorial changes OFFICE PDIV-1/PM PDIV-1/LA SPLB, SPSB, EMEB* OGC PDIV-1/SC NAME NKalyanam DJohnson RHoefling RGramm DATE 02/07/02 02/07/02 12/07/01; 01/28/02 02/13/02 02/14/02 OFFICIAL RECORD COPY
ENTERGY OPERATIONS, INC.
DOCKET NO. 50-382 WATERFORD STEAM ELECTRIC STATION, UNIT 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 178 License No. NPF-38
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Entergy Operations, Inc. (EOI) dated July 23, 2001, as supplemented by letters dated September 21, and November 8, 2001, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.2. of Facility Operating License No. NPF-38 is hereby amended to read as follows:
- 2. Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 178 , and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. EOI shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Robert A. Gramm, Chief, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: February 14, 2002
ATTACHMENT TO LICENSE AMENDMENT NO. 178 TO FACILITY OPERATING LICENSE NO. NPF-38 DOCKET NO. 50-382 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert 6-24 6-24
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 178 TO FACILITY OPERATING LICENSE NO. NPF-38 ENTERGY OPERATIONS, INC.
WATERFORD STEAM ELECTRIC STATION, UNIT 3 DOCKET NO. 50-382
1.0 INTRODUCTION
By letter dated July 23, as supplemented by letters dated September 21, and November 8, 2001, Entergy Operations, Inc. (EOI, the licensee) requested a Technical Specification (TS) change for the Waterford Steam Electric Station, Unit 3 (Waterford 3), that would allow a one-time change in their Appendix J Type A test (containment integrated leakage rate test) interval from the required 10 years to a test interval of 15 years. Without an extension, the licensee would have to perform a Type A test at their next refueling outage.
The September 21, and November 8, 2001, supplemental letters provided additional information that did not change the scope of the request or the initial proposed no significant hazards consideration determination (66 FR 44169, published August 22, 2001).
2.0 BACKGROUND
Pursuant to 10 CFR Part 50, Appendix J, Option B, a Type A test is required to be conducted at a periodic interval based on historical performance of the overall containment system.
Waterford 3 TS 6.15 requires that a program shall be established to implement the leakage rate testing of the containment as required by 10 CFR 50.54(o) and 10 CFR Part 50, Appendix J, Option B, as modified by approved exemptions. Further, it requires that this program shall be in accordance with the guidelines contained in Regulatory Guide (RG) 1.163, Performance-Based Containment Leak-Test Program, dated September 1995. This RG endorses, with certain exceptions, Nuclear Energy Institute (NEI) 94-01, Revision 0, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J, dated July 26, 1995.
Type A testing is an overall (integrated) leakage rate test of the containment structure.
NEI 94-01 specifies an initial test interval of 48 months, but allows an extended interval of 10 years, based upon two consecutive successful tests. There is also a provision for extending the test interval an additional 15 months in certain circumstances.
The most recent two Type A tests at Waterford 3 have been successful, so their current interval requirement is 10 years. The licensee is requesting an addition to TS 6.15, Containment Leakage Rate Testing Program, which would indicate that they are allowed to take an exception from the guidelines of RG 1.163 regarding the Type A test interval. Specifically, the
proposed TS says that the next Type A test to be performed after the May 12, 1991 (the date of the last Type A test), Type A test shall be performed no later than May 11, 2006.
3.0 EVALUATION 3.1 Probabilistic Safety Analysis 3.1.1 Assessment The July 23, 2001, application included a risk impact assessment of extending the Type A test interval to 15 years. The supplemental letter dated November 8, 2001, provided additional risk impact assessment analysis. In performing the risk assessment, the licensee considered the guidelines of NEI 94-01, the methodology used in Electric Power Research Institute (EPRI)
Technical Report TR-104285, Risk Impact Assessment of Revised Containment Leak Rate Testing, and RG 1.174, An Approach For Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis.
The basis for the current 10-year test interval is provided in Section 11.0 of NEI 94-01, Revision 0, and was established in 1995 during development of the performance-based Option B to Appendix J. Section 11.0 of NEI 94-01 states that NUREG-1493, Performance-Based Containment Leak-Test Program, September 1995, provided the technical basis to support rulemaking to revise leakage rate testing requirements contained in Option B to Appendix J. The basis consisted of qualitative and quantitative assessments of the risk impact (in terms of increased public dose) associated with a range of extended leakage rate test intervals. To supplement the Nuclear Regulatory Commission's (NRC or the Commission) rulemaking basis, NEI undertook a similar study. The results of that study are documented in EPRI Research Project Report TR-104285.
The EPRI study used an analytical approach similar to that presented in NUREG-1493 for evaluating the incremental risk associated with increasing the interval for Type A tests. The EPRI study estimated that relaxing the test frequency from 3 in 10 years to 1 in 10 years, will increase the average time that a leak detectable only by a Type A test goes undetected from 18 to 60 months. Since Type A tests only detect about 3 percent of leaks (the rest are identified during local leak rate tests based on industry leakage rate data gathered from 1987 to 1993), this results in a 10 percent increase in the overall probability of leakage. The risk contribution of pre-existing leakage, in percent of person-rem/year, for the pressurized-water reactor (PWR) representative plant was estimated to increase from .032 percent to .035 percent. This confirmed the NUREG-1493 conclusion that a reduction in the frequency of Type A tests from 3 per 10 years to 1 per 10 years leads to an imperceptible increase in risk.
Building upon the methodology of the EPRI study, the licensee assessed the change in the predicted person-rem/year frequency. The licensee quantified the risk from sequences that have the potential to result in large releases if a pre-existing leak were present. Since the Option B rulemaking in 1995, the staff has issued RG 1.174 on the use of probabilistic risk assessment (PRA) in risk-informed changes to a plants licensing basis. The licensee has proposed using RG 1.174 to assess the acceptability of extending the Type A test interval beyond that established during the Option B rulemaking. RG 1.174 defines very small changes in the risk-acceptance guidelines as increases in core damage frequency (CDF) less than 10-6 per reactor year and increases in large early release frequency (LERF) less than 10-7 per
reactor year. Since the Type A test does not impact CDF, the relevant criterion is the change in LERF. The licensee has estimated the change in LERF for the proposed change and the cumulative change from the original 3 in 10 year interval. RG 1.174 also discusses defense-in-depth and encourages the use of risk analysis techniques to help ensure and show that key principles, such as the defense-in-depth philosophy, are met. The licensee estimated the change in the conditional containment failure probability for the proposed change to demonstrate that the defense-in-depth philosophy is met.
The licensee provided an analysis which estimated all of these risk metrics and whose methodology is consistent with previously approved submittals. The following conclusions can be drawn from the analysis associated with extending the Type A test frequency:
- 1. A slight increase in risk is predicted when compared to that estimated from current requirements. Given the change from a 10 year test interval to a 15 year test interval, the increase in the total integrated plant risk is estimated to be 0.05 percent. The increase in the total integrated plant risk, given the change from a 3 in 10 year test interval to a 15 year test interval, was 0.14 percent. This is reasonable when compared to the range of risk increase, 0.02 to 0.14 percent, estimated in NUREG-1493 when going from a 3 in 10 year test interval to a 10 year interval. NUREG-1493 concluded that a reduction in the frequency of tests from 3 per 10 years to 1 per 10 years leads to an imperceptible increase in risk. Therefore, the increase in the total integrated plant risk for the proposed change is considered small and supportive of the proposed change.
- 2. RG 1.174 provides guidance for determining the risk impact of plant-specific changes to the licensing basis. RG 1.174 defines very small changes in the risk-acceptance guidelines as increases in CDF less than 10-6 per reactor year and increases in LERF less than 10-7 per reactor year. Since the Type A test does not impact CDF, the relevant criterion is LERF. The increase in LERF resulting from a change in the Type A test interval from 1 in 10 years to 1 in 15 years is estimated to be 2.6 x 10-8/year. The increase in LERF resulting from a change in the Type A test interval from the original 3 in 10 years to 1 in 15 years is estimated to be 8.0 x 10-8/year. Increasing the Type A interval to 15 years is considered to result in a very small change in LERF.
- 3. RG 1.174 also encourages the use of risk analysis techniques to help ensure and show that the proposed change is consistent with the defense-in-depth philosophy.
Consistency with the defense-in-depth philosophy is maintained if a reasonable balance is preserved among prevention of core damage, prevention of containment failure, and consequence mitigation. The change in the conditional containment failure probability was estimated to increase by 0.0008 for the proposed change and 0.0024 for the cumulative change of going from a test interval of 3 in 10 years to 1 in 15 years. The staff finds that the defense-in-depth philosophy is maintained based on the very small change in the conditional containment failure probability for the proposed change.
The staff recognizes the limitations of a conditional containment failure probability approach. For plants, such as Waterford 3, with CDF estimates well below 10-4, the ability of the containment to withstand events of even lower probability becomes less clear. Therefore, it is important to consider other risk metrics in conjunction with the conditional containment failure probability, such as total LERF. The licensee has
sufficiently demonstrated that the total LERF is less than 10-5 for the purpose of this evaluation.
3.1.2 Summary Based on these conclusions, the staff finds that the increase in predicted risk due to the proposed change is within the acceptance criteria while maintaining the defense-in-depth philosophy of RG 1.174 and, therefore, is acceptable.
3.2 Degradation of Containment Pressure Boundary This evaluation discusses the licensees actions taken to address aging degradation of the containment pressure boundary as it relates to the proposed one-time TS amendment of extending the time interval for performing the containment integrated leak rate test (ILRT) from the currently required 10 years to 15 years.
3.2.1 Evaluation Waterford 3 is a Combustion Engineering PWR with a large, dry (ambient) steel primary containment structure. The containment pressure boundary consists of the steel containment shell structure, containment access penetrations, and process piping and electrical penetrations. The integrity of the penetrations is verified through Type B and Type C local leak rate tests (LLRT) as required by 10 CFR Part 50, Appendix J, and the overall integrity of the containment structure is verified through an ILRT. These tests are performed to verify the essentially leak-tight characteristics of the containment structure at the design basis accident pressure. As stated in the request, Waterford 3 has performed two ILRTs during the period of its operating license. The first ILRT was performed during refueling Outage 2 in May 1988 and the second during Refueling Outage 4 in May 1991. Based on the two successful Type A tests at Waterford 3 and the requirements of 10 CFR Part 50, Appendix J, Option B, the current interval requirement is 10 years. With the requested extension of the ILRT time interval, the next overall verification of the containment leak-tight integrity will be performed in May 2006.
Because the leak rate testing requirements (ILRT and LLRTs) of Option B of Appendix J, and the containment inservice inspection (ISI) requirements mandated by 10 CFR 50.55a complement each other in ensuring the leak-tightness and structural integrity of the containment, the staff submitted a request for additional information (RAI) regarding the ISI of the containment and potential areas of weaknesses in the containment that may not be apparent in the risk assessment. The staffs evaluation of the licensees response to the RAI (supplemental letter dated September 21, 2001) is discussed in the following paragraphs.
The licensee's September 21, 2001, supplemental letter stated that the containment ISI program at Waterford 3 is based on its CEP-CII-003, Containment Inservice Inspection Program Plan, which was developed in accordance with the requirements of Subsection IWE of the 1992 Edition with 1992 Addenda of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (the Code),Section XI including the NRC staff-approved requests for relief from certain Code requirements. The licensee also discussed, in response to Questions 1 and 2 of the five questions on containment inspections, its containment ISI program, including areas of augmented inspections, and justified how it assured that the containment structural integrity and leak-tight integrity will be maintained during the extended ILRT period.
In response to Question 3 regarding the ISI of seals, gaskets, and bolted connections, the licensee stated that with the approved relief request in these two areas, the alternative examinations of Appendix J, Type B testing will be performed at least once during each containment inspection interval. Thus, the extension requested for Type A testing does not affect the frequency of these alternative examinations in that they will be performed once in the 10-year inspection interval (Option B of Appendix J) for all penetrations except containment airlocks, door seals, and penetrations with resilient seals for which the testing frequency will be performed once every 30 months. Because the extension requested for Type A testing frequency will not affect the alternative examination frequency for penetrations, and the Type B testing frequency for all penetrations meets the guidelines of NEI 94-01 and RG 1.163, the staff finds that the licensees ISI program provides reasonable assurance that the integrity of the containment pressure boundary will be maintained during the period of the ILRT extension.
In its response to Question 4 regarding the integrity of stainless steel bellows, the licensee stated that Waterford 3 has eight penetrations that incorporate two-ply mechanical bellows in its configuration. The licensee further justified that, based on a review of the purchase specification and discussions with the manufacturers, a wire mesh cloth between the plies ensures a gap for the adequate performance of an Appendix J, Type B test. With the performance criteria of NEI 94-01, which has been endorsed by RG 1.163, the eight mechanical bellows were placed on the 10-year 10 CFR Part 50, Appendix J, Option B extended interval beginning in October 1995. Therefore, the staff finds that the integrity of containment pressure boundary will be maintained for these stainless steel bellows.
General Question No. 5 raised a concern related to the effect of degradations in uninspectable areas of the steel containment vessel (i.e., areas that cannot be visually examined). Because ILRTs help to identify areas of through-wall degradations when the containment vessel is pressurized, the staff questioned how the potential leakages due to age-related degradation were considered in risk assessment of the extended ILRT. In its response, the licensee stated that the potential for containment leakage was explicitly included in the risk assessment. By definition, the intact containment case, EPRI Containment Failure Class 1, includes a leakage term that is independent of the source of the leak. Similarly, the Containment Failure Classes 3a and 3b model the potential leakage impact of the ILRT interval extension. These cases include the potential that the leakage is due to a containment shell failure. The assessment shows that even with the increased potential to have an undetected containment flaw or leak path, the increase in risk is small.
Based on the basis provided in the TS change request and the response to the five general questions, the staff finds that (1) the structural integrity of the containment vessel is verified through the periodic ISIs conducted as required by Subsections IWE and IWL of the ASME Code,Section XI; (2) the integrity of the penetrations, containment isolation valves and mechanical bellows are periodically verified through Type B and Type C tests as required by 10 CFR Part 50, Appendix J and Waterford 3 TS; and (3) the potential for large leakage from the areas that cannot be examined by the ISI has been explicitly modeled in performing the risk assessment. In addition, the system pressure tests for containment pressure boundary (i.e.,
Appendix J tests, as applicable) are required to be performed following repair and replacement activities in accordance with Article IWE-5000 of the ASME Code,Section XI. Serious degradation of the primary containment pressure boundary is required to be reported under 10 CFR 50.72 and 10 CFR 50.73.
3.2.2 Summary On the basis of findings discussed above, the staff concludes that a one-time extension of performing the ILRT as proposed by the licensee in Section 6.15 of the proposed TS amendment request is acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Louisiana State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no signi-ficant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding (66 FR 44169, published August 22, 2001). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b),
no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributors: M. Snodderly, J. Pulsipher, T. Cheng Date: February 14, 2002
Waterford Generating Station 3 cc:
Mr. Michael E. Henry, Administrator Regional Administrator, Region IV and State Liaison Officer U. S. Nuclear Regulatory Commission Department of Environmental Quality 611 Ryan Plaza Drive, Suite 1000 P. O. Box 82135 Arlington, TX 76011 Baton Rouge, LA 70884-2135 Parish President Council Vice President, Operations Support St. Charles Parish Entergy Operations, Inc. P. O. Box 302 P. O. Box 31995 Hahnville, LA 70057 Jackson, MS 39286-1995 Executive Vice-President Director and Chief Operating Officer Nuclear Safety Assurance Entergy Operations, Inc.
Entergy Operations, Inc. P. O. Box 31995 17265 River Road Jackson, MS 39286-1995 Killona, LA 70066-0751 Chairman Wise, Carter, Child & Caraway Louisiana Public Services Commission P. O. Box 651 P.O. Box 91154 Jackson, MS 39205 Baton Rouge, LA 70825-1697 General Manager Plant Operations Waterford 3 SES Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Licensing Manager Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Winston & Strawn 1400 L Street, N.W.
Washington, DC 20005-3502 Resident Inspector/Waterford NPS P. O. Box 822 Killona, LA 70066-0751 January 2002