Letter Sequence Approval |
---|
EPID:L-2018-LLA-0058, Relief Requests Associated with the Fifth Inservice Inspection Interval (Approved, Closed) EPID:L-2018-LLR-0058, Relief Requests Associated with the Fifth Inservice Inspection Interval (Approved, Closed) |
|
|
|
---|
Category:Letter
MONTHYEARIR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 IR 05000382/20234022023-08-0707 August 2023 NRC Security Inspection Report 05000382/2023402 (Full Report) IR 05000382/20230402023-07-12012 July 2023 Revised 95001 Supplemental Inspection Report 05000382/2023040, Exercise of Enforcement Discretion, and Follow-Up Assessment Letter ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23158A1042023-06-0808 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000382/2023401 ML23145A2272023-06-0202 June 2023 95001 Supplemental Inspection Report 05000382/2023040, and Exercise of Enforcement Discretion ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment IR 05000382/20230012023-04-24024 April 2023 Integrated Inspection Report 05000382/2023001, Independent Spent Fuel Storage Installation Report 07200075/2023001, and Exercise of Enforcement Discretion ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23108A2542023-04-18018 April 2023 WCGS Information Request, Security IR 2023401 IR 05000382/20234032023-04-17017 April 2023 Security Baseline Inspection Report 05000382/2023403 ML23093A2122023-04-0303 April 2023 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2022 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc ML23059A2592023-03-0707 March 2023 Correction to Issuance to Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23065A2002023-03-0303 March 2023 EN 56252 Update - Flow Serve - Final Notification of Potential Part 21 on Peerless 56 Frame DC Motors ML23060A1092023-03-0101 March 2023 Proof of Financial Protection (10 CFR 140.15) IR 05000382/20220062023-03-0101 March 2023 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3, (Report 05000382/2022006) ML22322A1092023-02-17017 February 2023 Issuance of Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000382/20230902023-02-0101 February 2023 Final Significance Determination of a White Finding, NOV, and Follow-Up Assessment Letter; NRC Inspection Report 05000382/2023090 ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 ML23030A6642023-01-27027 January 2023 Flowserve, Part 21 Second Interim Notification Report Re Peerless 56 Frame DC Motors IR 05000382/20220042023-01-26026 January 2023 Integrated Inspection Report 05000382/2022004 and Independent Fuel Storage Installation Inspection Report 07200075/2022001 ML23024A0822023-01-20020 January 2023 Stephens Insurance, Entergy - 2023 Nuclear Energy Liability Evidence of Financial Protection ML23018A2202023-01-18018 January 2023 Quality Assurance Program Manual Reduction in Commitment IR 05000382/20220912023-01-12012 January 2023 Emergency Preparedness Inspection Report 05000382/2022091 and Preliminary White Finding and Apparent Violation IR 05000382/20220032023-01-0505 January 2023 Revised Integrated Inspection Report 05000382/2022003 ML22342B1402022-12-0202 December 2022 56252-EN 56252 - Flowserve - Limitorque - Interim Report Potential Part 21 on Peerless 56 Frame DC Motors ML22300A2082022-11-30030 November 2022 Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22332A5292022-11-29029 November 2022 Notification of NRC Initial Operator Licensing Examination 05000382/2023301 IR 05000382/20220132022-11-28028 November 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000382/2022013 IR 05000382/20220022022-11-0101 November 2022 Revised Integrated Inspection Report 05000382/2022002 2024-01-31
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23059A2592023-03-0707 March 2023 Correction to Issuance to Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML22322A1092023-02-17017 February 2023 Issuance of Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML22300A2082022-11-30030 November 2022 Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22194A9012022-07-20020 July 2022 Issuance of Amendment No. 268 Adoption of Technical Specification Task Forcetraveler TSTF-569, Revise Response Time Testing Definition, Revision 2 ML22153A4452022-07-0808 July 2022 Issuance of Amendment No. 267 for Reactor Coolant System Pressure/Temperature Limits and Low Temperature Overpressure Setpoints Applicable for 55 Effective Full Power Years ML22145A0152022-05-27027 May 2022 Issuance of Amendment No. 266 to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22075A1022022-04-29029 April 2022 Issuance of Amendment No. 264 to Relocate Chemical Detection System Technical Specifications to Technical Requirements Manual ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML21313A0082021-12-0808 December 2021 Issuance of Amendments to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21131A2432021-08-24024 August 2021 Issuance of Amendment No. 260 Digital Upgrade to the Core Protection and Control Element Assembly Calculator System ML21082A3022021-05-19019 May 2021 Issuance of Amendment No. 259 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML21085A8652021-04-0808 April 2021 Summary of March 17, 2021, Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (EPID L-2020-LLA-0164) Non ML20280A3292020-10-20020 October 2020 Issuance of Amendment No. 258 Regarding Technical Specification 3/4.8.1 Surveillance Requirements ML20205L5742020-08-25025 August 2020 Issuance of Amendment No. 257 Control Room Air Condition System Technical Specifications ML19275D4382019-10-24024 October 2019 Redacted - Issuance of Amendment No. 256 for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19164A0012019-06-28028 June 2019 Issuance of Amendment No. 254 Regarding Revision of Technical Specification 3/4.7.4, Ultimate Heat Sink, ML19022A3372019-02-13013 February 2019 Issuance of Amendment No. 253 to Revise Section 15.4.3.1 of the Updated Final Safety Analysis Report to Account for Fuel Misload ML19035A5202019-02-0606 February 2019 Correction to Issuance of Amendment No. 252 Adoption of the Raptor-M3G Code for Neutron Fluence Calculations ML18275A1332018-12-27027 December 2018 Current Renewed Facility Operating License NPF-38 ML18275A2152018-12-27027 December 2018 Issuance of Renewed Facility Operating License No. NPF-38 for Waterford Steam Electric Station, Unit 3 CAC Nos. MF7492 and MF7493) ML18275A2032018-12-27027 December 2018 Current Renewed Facility Operating License NPF-38 Attachment 2 and Tech Specs ML18180A1122018-08-20020 August 2018 Notice of Availability of the Draft Supplemental Environmental Impact Statement for License Renewal of Waterford Steam Electric Station, Unit 3 for Public Comment ML18180A1132018-08-20020 August 2018 Notice of Availability of the Draft Supplemental Environmental Impact Statement for License Renewal of Waterford Steam Electric Station, Unit 3 for Public Comment ML18180A2962018-08-20020 August 2018 Notice of Availability of the Draft Supplemental Environmental Impact Statement for License Renewal of Waterford Steam Electric Station, Unit 3, for Public Comment ML18207A2702018-08-20020 August 2018 Notice of Availability of the Draft Supplement Environmental Impact Statement for License Renewal of Waterford Steam Electric Station, Unit 3, for Public Comment ML18026B0532018-04-26026 April 2018 Issuance of Amendment No. 251 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control,(Cac No. MF9537; EPID L-2017-LLA-0205) ML17192A0072017-07-27027 July 2017 Issuance of Amendment No. 250 Adoption of Technical Specifications Task Force Traveler TSTF 545, Revision 3 ML16159A4192016-07-26026 July 2016 Issuance of Amendment No. 249 Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control ML16126A0332016-06-27027 June 2016 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) ML16077A2702016-05-10010 May 2016 Issuance of Amendment No. 247 Regarding Cyber Security Plan Milestone 8 Full Implementation Schedule ML15289A1432015-11-13013 November 2015 Redacted - Issuance of Amendment No. 246 Changes to Technical Specification 3.1.3.4 Regarding Control Element Assembly Drop Times ML15139A4832015-08-31031 August 2015 Issuance of Amendment No. 245 Change to Updated Final Safety Analysis Report Clarifying Pressurizer Heaters Function for Natural Circulation at the Onset of a Loss of Offsite Power ML15217A1432015-08-24024 August 2015 Issuance of Amendment No. 244 Extension of the Integrated Leak Rate Testing to 15 Years ML15174A2272015-07-29029 July 2015 Issuance of Amendment of Technical Specifications s 3.9.6 and 3.9.7 to the Technical Requirements Manual ML15005A1262015-02-23023 February 2015 Issuance of Amendment Multiple Administrative Issues with the Technical Specification ML14321A7132014-12-10010 December 2014 Issuance of Amendment No. 241, Revise Operating License Condition for Change to Cyber Security Plan Milestone 8 Full Implementation Date ML13025A3062013-03-14014 March 2013 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical Specifications ML12278A3312012-12-20020 December 2012 Issuance of Amendment No. 238, Relocate Technical Specification (TS) 3.4.6, TS 3.7.5, TS 3.7.9, and TS 3.9.5 to the Technical Requirements Manual ML12244A0592012-12-20020 December 2012 Issuance of Amendment No. 239, Revise Physical Protection License Condition Related to Milestone 6 of the Cyber Security Plan Implementation Schedule ML12250A4352012-10-31031 October 2012 Issuance of Amendment No. 237, Revise Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train ML12152A3412012-07-31031 July 2012 Issuance of Amendment No. 236, Revise Technical Specifications Related to Steam Generator Tube Integrity to Support Replacement of Steam Generators ML1209401712012-04-25025 April 2012 Issuance of Amendment No. 235, Revise Technical Specification Applicability and Action Language for Revised Fuel Handling Accident Analysis ML1118000212011-07-20020 July 2011 Issuance of Amendment No. 234, Revise License Condition and Approval of Cyber Security Plan and Associated Implementation Schedule ML1106302592011-03-23023 March 2011 Issuance of Amendment No. 233, Revise Technical Specification Table 3.4-1 to Add Shutdown Cooling Suction Bypass Isolation Valves ML1104101192011-02-28028 February 2011 Issuance of Amendment No. 232, Approval of Change to Final Safety Analysis Report for Leak-Before-Break of the Pressurizer Surge Line ML1101400262011-02-23023 February 2011 Issuance of Amendment No. 231, Modify Technical Specification 3/4.9.4, Containment Building Penetrations, to Allow Alternative Means of Penetration Closure During Refueling Operations ML1036305222011-01-31031 January 2011 Issuance of Amendment No. 230, Revise TS 3.7.1.2, Emergency Feedwater System, Limiting Condition for Operation to Clarify Acceptability of Transitioning from Mode 4 to Mode 3 ML1022405802010-10-14014 October 2010 Issuance of Amendment No. 229, Delete License Condition 2.C.14, Fuel Movement in the Fuel Handling Building 2023-03-07
[Table view] Category:Safety Evaluation
MONTHYEARML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML22322A1092023-02-17017 February 2023 Issuance of Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML22300A2082022-11-30030 November 2022 Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22194A9012022-07-20020 July 2022 Issuance of Amendment No. 268 Adoption of Technical Specification Task Forcetraveler TSTF-569, Revise Response Time Testing Definition, Revision 2 ML22153A4452022-07-0808 July 2022 Issuance of Amendment No. 267 for Reactor Coolant System Pressure/Temperature Limits and Low Temperature Overpressure Setpoints Applicable for 55 Effective Full Power Years ML22145A0152022-05-27027 May 2022 Issuance of Amendment No. 266 to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22075A1022022-04-29029 April 2022 Issuance of Amendment No. 264 to Relocate Chemical Detection System Technical Specifications to Technical Requirements Manual ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML22061A2172022-03-15015 March 2022 Revision of the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML22007A3172022-01-18018 January 2022 1, River Bend Station 1, and Waterford Steam Electric Station 3 - Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML21313A0082021-12-0808 December 2021 Issuance of Amendments to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21166A1832021-09-15015 September 2021 Issuance of Amendment No. 261 Regarding Removal and Relocation of Boration System Technical Specifications ML21131A2432021-08-24024 August 2021 Issuance of Amendment No. 260 Digital Upgrade to the Core Protection and Control Element Assembly Calculator System ML21082A3022021-05-19019 May 2021 Issuance of Amendment No. 259 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML20280A3292020-10-20020 October 2020 Issuance of Amendment No. 258 Regarding Technical Specification 3/4.8.1 Surveillance Requirements ML20205L5742020-08-25025 August 2020 Issuance of Amendment No. 257 Control Room Air Condition System Technical Specifications ML20226A2722020-08-18018 August 2020 Request to Use a Provision of a Later Edition of the ASME BPV Code, Section XI ML20022A2582020-01-28028 January 2020 Re-Issuance of Approval of Relief Request WF3-RR-19 2, Relief from the Requirements of Asme Code Section XI Regarding Alternate Repair of Degraded Drain Line of Chemical and Volume Control ML20002A0202020-01-13013 January 2020 Approval of Relief Request WF3-RR-19-2, Relief from the Requirements of Asme Code Section XI Regarding Alternate Repair of Degraded Drain Line of Chemical and Volume Control System ML19275D4382019-10-24024 October 2019 Redacted - Issuance of Amendment No. 256 for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components ML19282D8922019-10-15015 October 2019 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19247B1972019-09-0909 September 2019 Approval of Relief Request W3-ISI-032,Relief from the Requirements of ASME Code Section XI Regarding Volumetric Examination ML19232A0252019-08-27027 August 2019 Authorization of Proposed Alternative to ASME Code Section XI, IWA-4000, Repair/Replacement Activities ML19164A0012019-06-28028 June 2019 Issuance of Amendment No. 254 Regarding Revision of Technical Specification 3/4.7.4, Ultimate Heat Sink, ML19157A3162019-06-12012 June 2019 Authorization of Proposed Alternative to ASME Code Case N-770-2 ML19022A3372019-02-13013 February 2019 Issuance of Amendment No. 253 to Revise Section 15.4.3.1 of the Updated Final Safety Analysis Report to Account for Fuel Misload ML18282A0302018-10-18018 October 2018 Proposed Alternative to ASME Code, Section XI, Regarding Charging Pipe Visual Inspection ML18180A2982018-07-23023 July 2018 Issuance of Amendment No. 252 Adoption of the Raptor-M3G Code for Neutron Fluence Calculations ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 ML18026B0532018-04-26026 April 2018 Issuance of Amendment No. 251 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control,(Cac No. MF9537; EPID L-2017-LLA-0205) ML17341A1202017-12-11011 December 2017 Relief Request PRR-WF3-2017-3, Request for Alternative to ASME OM Code Requirements for Comprehensive Testing of High Pressure Safety Injection Pump AB (CAC No. MF9875; EPID L-2017-LLR-0049) ML17328A8822017-11-29029 November 2017 Requests for Relief GRR-1, PRR-1 and PRR-2, Alternatives to ASME OM Code Requirements for Inservice Testing for the Fourth 10-Year Program Interval (CAC Nos. MF9869, 9870, and 9871; EPID L-2017-LRM-0045-47) ML17192A0072017-07-27027 July 2017 Issuance of Amendment No. 250 Adoption of Technical Specifications Task Force Traveler TSTF 545, Revision 3 ML17069A1872017-03-22022 March 2017 Request for Alternative to 10 CFR 50.55a(c) ASME Code Section III Code Case 1361-1, Relief Request W3-ISI-024 ML17045A1482017-03-0303 March 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16235A2282016-12-0909 December 2016 Request for Alternative Test Plan to American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants ML16278A0172016-10-19019 October 2016 Entergy Fleet Relief Request RR-EN-ISI-15-1, Alternative to Maintain Inservice Inspection Related to Activities to the 2001 Edition/2003 Addendum of ASME Section XI Code ML16251A6202016-09-13013 September 2016 Entergy Fleet Request for Approval of Change to the Entergy Quality Assurance Program Manual (CAC Nos. MF7086 - MF7097) ML16159A4192016-07-26026 July 2016 Issuance of Amendment No. 249 Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control ML16182A2702016-07-0606 July 2016 Relief Request PRR-WF3-2016-1, Alternative to the Inservice Testing Program ML16126A0332016-06-27027 June 2016 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 ML16093A0282016-05-31031 May 2016 Entergy Services, Inc., Proposed Alternative to Utilize ASME Code Case N-789-1, Relief Request RR-EN-15-1, Revision 1 ML16077A2702016-05-10010 May 2016 Issuance of Amendment No. 247 Regarding Cyber Security Plan Milestone 8 Full Implementation Schedule ML15289A1432015-11-13013 November 2015 Redacted - Issuance of Amendment No. 246 Changes to Technical Specification 3.1.3.4 Regarding Control Element Assembly Drop Times ML15267A7972015-10-0606 October 2015 Safety Evaluation Regarding the Aging Management Program for Reactor Vessel Internals ML15139A4832015-08-31031 August 2015 Issuance of Amendment No. 245 Change to Updated Final Safety Analysis Report Clarifying Pressurizer Heaters Function for Natural Circulation at the Onset of a Loss of Offsite Power 2023-05-01
[Table view] Category:Technical Specifications
MONTHYEARML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22075A1022022-04-29029 April 2022 Issuance of Amendment No. 264 to Relocate Chemical Detection System Technical Specifications to Technical Requirements Manual ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21148A0522021-06-0808 June 2021 Correction to License Amendment 214 Request to Support Next Generation Fuel; Review and Approval of Revised ECCS Performance Analysis; and Review and Approval of Supplement to the ECCS Performance Analysis ML21116A1432021-04-26026 April 2021 (Waterford 3) - Revision to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual ML20148M1062020-06-22022 June 2020 Corrections to Technical Specifications Issued in Amendments Nos. 102 and 225 and with the Renewed License ML20113E8362020-04-23023 April 2020 Summary of March 19, 2020, Category 1 Public Meeting with Entergy Operations Inc. a Planned LAR to Install Digital Systems in Accordance with Di&C ISG-06 Revision 2, Licensing Processes at Waterford Steam Electric Station ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19022A3372019-02-13013 February 2019 Issuance of Amendment No. 253 to Revise Section 15.4.3.1 of the Updated Final Safety Analysis Report to Account for Fuel Misload ML17192A0072017-07-27027 July 2017 Issuance of Amendment No. 250 Adoption of Technical Specifications Task Force Traveler TSTF 545, Revision 3 ML16077A2702016-05-10010 May 2016 Issuance of Amendment No. 247 Regarding Cyber Security Plan Milestone 8 Full Implementation Schedule W3F1-2016-0010, Responses to Request for Additional Information Regarding the Risk-Informed Surveillance Requirements License Amendment Request (LAR)2016-03-0303 March 2016 Responses to Request for Additional Information Regarding the Risk-Informed Surveillance Requirements License Amendment Request (LAR) ML15289A1432015-11-13013 November 2015 Redacted - Issuance of Amendment No. 246 Changes to Technical Specification 3.1.3.4 Regarding Control Element Assembly Drop Times ML15244B3862015-09-0303 September 2015 Correction to Issuance of Amendment Extension of the Integrated Leak Rate Testing to 15 Years ML15139A4832015-08-31031 August 2015 Issuance of Amendment No. 245 Change to Updated Final Safety Analysis Report Clarifying Pressurizer Heaters Function for Natural Circulation at the Onset of a Loss of Offsite Power ML15217A1432015-08-24024 August 2015 Issuance of Amendment No. 244 Extension of the Integrated Leak Rate Testing to 15 Years ML15138A4402015-08-14014 August 2015 Orders Approving Transfer of Facility Operating Licenses and Indirect Transfer, Draft Conforming Amendment, and Safety Evaluation W3F1-2015-0061, Provides Supplement to Revise Control Element Assembly Drop Times Associated with Technical Specification 3.1.3.42015-08-14014 August 2015 Provides Supplement to Revise Control Element Assembly Drop Times Associated with Technical Specification 3.1.3.4 ML15174A2272015-07-29029 July 2015 Issuance of Amendment of Technical Specifications s 3.9.6 and 3.9.7 to the Technical Requirements Manual ML14321A7132014-12-10010 December 2014 Issuance of Amendment No. 241, Revise Operating License Condition for Change to Cyber Security Plan Milestone 8 Full Implementation Date W3F1-2014-0052, License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years2014-08-28028 August 2014 License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications W3F1-2012-0084, Technical Specification Change for Dry Cooling Tower Fans Out of Service for Ultimate Heat Sink2012-10-0808 October 2012 Technical Specification Change for Dry Cooling Tower Fans Out of Service for Ultimate Heat Sink W3F1-2012-0028, Supplement 2 of License Amendment Request to Revise Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train2012-05-22022 May 2012 Supplement 2 of License Amendment Request to Revise Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train W3F1-2011-0067, License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train.2011-10-13013 October 2011 License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train. ML1125103192011-09-20020 September 2011 Correction of an Error in Amendment No. 226, Administrative Changes to Technical Specifications 6.9.1.11 and 6.9.1.11.1 Relating to Core Operating Limits Report ML1109501232011-04-0404 April 2011 Attachment 2 to W3F1-2011-0021, Proposed Operating License Change (Mark-up) and Attachment 3, Revised Operating License Page ML1021001582010-09-13013 September 2010 Issuance of Amendment No. 228, Modify Technical Specification Tables 2.2-1 and 3.3-1 to Clarify Notes and Actions ML1021504662010-09-13013 September 2010 Issuance of Amendment No. 227, Modify Technical Specification 3/4.9.7, Crane Travel - Fuel Handling Building to Permit Certain Operations Needed for Dry Cask Storage of Spent Nuclear Fuel W3F1-2010-0065, Response to Request for Additional Information Associated with Technical Specification Table 3.4-1 Isolation Valve Addition2010-08-12012 August 2010 Response to Request for Additional Information Associated with Technical Specification Table 3.4-1 Isolation Valve Addition W3F1-2010-0047, License Amendment Request for Proposed Change to Technical Specification 3.7.1.2, Emergency Feedwater System.2010-07-20020 July 2010 License Amendment Request for Proposed Change to Technical Specification 3.7.1.2, Emergency Feedwater System. 2CAN051001, Response to Request for Additional Information Associated with Core Operating Limits Report References2010-05-17017 May 2010 Response to Request for Additional Information Associated with Core Operating Limits Report References ML1011100352010-04-22022 April 2010 Correction to Technical Specification Page 3/4 3-10 Issued with Amendment No. 225 Technical Specification Change to Relocate Steam Generator Level - High Trip Function W3F1-2010-0011, License Amendment Request, Technical Specification Change Regarding Steam Generator Program2010-02-22022 February 2010 License Amendment Request, Technical Specification Change Regarding Steam Generator Program ML1005504632010-02-22022 February 2010 Request for Amendment to Technical Specification Table 3.4-1 Isolation Valve Addition W3F1-2009-0045, License Amendment Request to Modify Technical Specification Information for Table 2.2-1 and Table 3.3-12009-10-22022 October 2009 License Amendment Request to Modify Technical Specification Information for Table 2.2-1 and Table 3.3-1 W3F1-2009-0021, License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit2009-06-0303 June 2009 License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit W3F1-2008-0051, Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 32009-01-0808 January 2009 Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 3 ML0819904722008-07-30030 July 2008 License and Technical Specification Pages, Issuance of Amendment No. 216, Modify Diesel Generator Fuel Oil Testing Surveillance Requirements ML0812700362008-05-0909 May 2008 Tech Spec Page for Correction to Amendment 214 Request to Support Next Generation Fuel; Review & Approval of Revised ECCS Performance Analysis; & Review & Approval of Supplement to ECCS Performance Analysis ML0803800062008-04-16016 April 2008 License Page 4 and Technical Specification Page 5-5, Issuance of Amendment No. 215 Use of Optimized ZIRLO-TM Fuel Rod Cladding ML0808800152008-04-15015 April 2008 Tech Spec Pages for Amendment 214, Request to Support Next Generation Fuel; Review and Approval of ECCS Performance Analysis; and Review and Approval of Supplement to ECCS Performance Analysis ML0804401272008-02-12012 February 2008 2/12/2008 E-mail from Licensee Enclosing Markup of Technical Specification Page 5-5, Supplement to 4/24/2007 License Amendment Request Use of Optimized ZIRLO-TM Fuel Rod Cladding W3F1-2008-0001, License Amendment Request NPF-38-275, Containment Isolation Valves.2008-01-0202 January 2008 License Amendment Request NPF-38-275, Containment Isolation Valves. W3F1-2007-0033, License Amendment Request NPF-38-273 to Modify Requirements Regarding Control Room Envelope Habitability2007-08-16016 August 2007 License Amendment Request NPF-38-273 to Modify Requirements Regarding Control Room Envelope Habitability ML0711603482007-04-24024 April 2007 License Amendment Request to Allow the Use of Optimized Zirlo Fuel Rod Cladding ML0706803372007-03-19019 March 2007 Tech Spec Pages for Amendment 212 Reactor Coolant System Leakage Detection Instrumentation ML0703704312007-02-0606 February 2007 Technical Specifications, Issuance of Amendment No. 211 to Facility Operating License Removal of Vendor Recommended Diesel Generator Surveillance Requirement 2023-07-26
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 13, 2019 Site Vice President Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3- ISSUANCE OF AMENDMENT TO REVISE SECTION 15.4.3.1 OF THE UPDATED FINAL SAFETY ANALYSIS REPORT TO ACCOUNT FOR FUEL MISLOAD (EPID L-2018-LLA-0058)
Dear Sir or Madam:
The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 253 to Renewed Facility Operating License No. NPF-38 for the Waterford Steam Electric Station, Unit 3 (Waterford 3). This amendment consists of changes to the Updated Final Safety Analysis Report (UFSAR) in response to your application dated March 8, 2018, as supplemented by letter dated October 18, 2018.
Specifically, the amendment revises Section 15.4.3.1 of the Waterford 3 UFSAR to incorporate the results of an updated analysis for inadvertent loading of a fuel assembly into an improper position.
A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely, April L. Pulvirenti, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382
Enclosures:
- 1. Amendment No. 253 to NPF-38
- 2. Safety Evaluation cc: Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 ENTERGY OPERATIONS, INC.
DOCKET NO. 50-382 WATERFORD STEAM ELECTRIC STATION, UNIT 3 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 253 Renewed License No. NPF-38
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Entergy Operations, Inc. (EOl),dated March 8, 2018, as supplemented by letter dated October 18, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Enclosure 1
- 2. Accordingly, by Amendment No. 253, Renewed Facility Operating License No. NPF-38 is hereby amended to authorize revision to the Waterford Steam Electric Station, Unit 3 (Waterford 3), Final Safety Analysis Report as set forth in the licensee's application dated March 8, 2018, as supplemented by letter dated October 18, 2018, and evaluated in the NRC staff's evaluation enclosed with this amendment.
- 3. This license amendment is effective as of its date of issuance and shall be implemented before the Waterford 3 restart following Refueling Outage 22.
FOR THE NUCLEAR REGULATORY COMMISSION Robert J. Pascarelli, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Date of Issuance: February 1 3 , 2 O1 9
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 253 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-38 ENTERGY OPERATIONS, INC.
WATERFORD STEAM ELECTRIC STATION, UNIT 3 DOCKET NO. 50-382
1.0 INTRODUCTION
By application dated March 8, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18068A705), as supplemented by letter dated October 18, 2018 (ADAMS Accession No. ML182918374 ), Entergy Operations, Inc. (Entergy, the licensee),
submitted a request to update the analyzed results for the fuel assembly mislead event contained in the Updated Final Safety Analysis Report (UFSAR) for Waterford Steam Electric Station, Unit 3 (Waterford 3).
The proposed changes would revise the Waterford 3 UFSAR, Section 15.4.3.1, "Inadvertent Loading of a Fuel Assembly into the Improper Position," to update the results for an inadvertent loading of a fuel assembly into the improper position with a new analysis. The new analysis accounts for the implementation of zirconium diboride (Zr8r2) integral fuel burnable absorber (IFBA) and determines an increase in the dose consequence of the worst undetectable mislead event including consideration for failed incore detectors during startup and during operation.
The supplemental letter dated October 18, 2018, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the U.S. Nuclear Regulatory Commission (NRC or the Commission) staffs original proposed no significant hazards consideration determination as published in the Federal Register on June 19, 2018 (83 FR 28459).
2.0 REGULATORY EVALUATION
2.1 Background The fuel assembly mislead event is a limiting fault (Infrequent Event) accident and is defined in Section 15.4.3.1.1 of the Waterford 3 UFSAR as the erroneous placement or orientation of fuel assemblies in the reactor core. Misleading of one or more fuel assemblies in the reactor core may result in an unexpected loss of thermal-hydraulic operating margin. Considerable care is expended on designing a scheme for the placement of the fuel in the core to achieve the Enclosure 2
desired core power distribution. Failing to load fuel in the proposed arrangement is a foreseeable error and requires satisfactory measures to mitigate the consequences.
The following are some of the most common measures to minimize chances of a misloaded fuel assembly in the reactor core:
- Administrative controls in fuel manufacturing and core loading;
- Core loading to be supervised by the fuel vendor using fuel tracking software;
- Tracking neutron flux at the source-range detector location to estimate the rate at which the core is approaching a critical condition;
- Once the core is fully loaded, the placement of assemblies is verified visually before the reactor vessel head is replaced.
Nevertheless, the fuel assembly mislead event is conservatively analyzed to ensure acceptable consequences.
2.2 Regulatory Review Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix A, "General Design Criteria for Nuclear Power Plants," General Design Criterion (GDC) 13, "Instrumentation and control," states, in part, that "Instrumentation shall be provided to monitor variables and systems over their anticipated ranges for normal operation, for anticipated operational occurrences, and for accident conditions as appropriate to assure adequate safety .... " A fuel assembly misload event could adversely affect the fission process (power distribution), the integrity of the reactor core, and the reactor coolant pressure boundary. Meeting the requirements of GDC 13 provides assurance that a fuel assembly mislead event will be detected before it can affect power distribution, core integrity, or produce unacceptable stress on the reactor coolant pressure boundary.
The NRC guidelines for meeting the requirements in GDC 13 are provided in NUREG-0800, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants:
LWR [Light-Water Reactor] Edition," Section 15.4.7, "Inadvertent Loading and Operation of a Fuel Assembly in an Improper Position," Revision 2, dated March 2007 (ADAMS Accession No. ML070550013). The guidelines most relevant to this safety evaluation (SE) are as follows:
- The provisions made to search for loading errors at the beginning of each fuel cycle.
- Sufficient number of fuel loading errors should be studied by the applicant to show that the worst undetectable situation has been identified. For those reactors in which burnable poison or fuel rods are added to or removed from fuel assemblies at the plant, errors in these processes must be considered.
- Changes to the power distribution and increases in local power density should be addressed.
- The acceptable radiological consequences for the misloaded fuel bundle event should be a small fraction (interpreted as less than 10 percent) of 10 CFR Part 100, "Reactor Site Criteria," limits.
Waterford 3 was licensed to the 10 CFR 50.67, "Accident source term," limits for offsite dose consequences in Amendment No. 198 (ADAMS Accession No. ML050890248). The offsite dose consequence acceptance criteria for a limiting fault event in 10 CFR 50.67 are the same as that for 10 CFR Part 100 (i.e., a small fraction of the prescribed limits). In addition, the licensee was issued Amendment No. 210 (ADAMS Accession No. ML061930421) in order to implement ZrB2 IFBA.
To continue to meet the requirements of GDC 13, the licensee has employed interim administrative restrictions on incore detectors. Operability of the incore detectors is administratively controlled by the Technical Requirements Manual (TRM). The licensee stated that the interim restrictions have required cycle specific analysis that could impact operations by significantly limiting the number of incore detectors that are allowed to be out of service.
The licensee has requested an amendment, pursuant to 10 CFR 50.90, "Application for amendment of license, construction permit, or early site permit," to revise Section 15.4.3.1 of the Waterford 3 UFSAR to update the fuel mislead analysis to address the implementation of ZrB2 IFBA. The licensee stated that the new mislead event analysis would allow it to discontinue the interim administrative restrictions. The new mislead event analysis allows fuel failure rather than imposing additional operating margin penalties. For Waterford 3, the fuel assembly mislead is categorized as a limiting fault; hence, limited fuel failures that result in dose consequences within applicable limits may be incurred for this event.
The analysis results in an increase in the dose consequences of the worst undetectable mislead event (UFSAR Section 15.4.3.1 ), including consideration for failed incore detectors during startup and during operation. However, the licensee stated that the fuel assembly mislead event remains bounded by results calculated for analyzed infrequent events that have been demonstrated to be within the acceptance criteria in 10 CFR 50.67.
3.0 TECHNICAL EVALUATION
3.1 Westinghouse Nuclear Physics Code The new analysis uses the ANC nuclear physics code. ANC is the current Westinghouse neutronics code, which was approved for application at Waterford 3 in Amendment No. 200 (ADAMS Accession No. ML051290368). ANC is a 3-dimensional two-group diffusion theory nodal code used for nuclear design analyses for determining the core design parameters.
Core design parameters include critical boron concentration, control rod worths, reactivity coefficients, assembly average powers and exposures, assembly peak rod powers, peaking factors, and axial power shapes. Topical Report (TR) WCAP-11596-P-A, "Qualification of the Phoenix-P/ANC Nuclear Design System for Pressurized Water Reactor Cores" (ADAMS Accession No. ML080630391; not publicly available; proprietary information) describes the ANC nuclear design system for pressurized-water reactor (PWR) cores and provides demonstration of the qualification of the ANC nuclear analysis package. The qualification process covers an acceptable range of comparisons between the ANC calculations and the operating reactor data measured during startup tests and during normal power operations from several representative reactor cycles from three-loop and four-loop Westinghouse-designed plants. '
As part of the review of Amendment No. 210, which approved the application of the Westinghouse ANC code package to Waterford 3, the licensee provided supplemental information to demonstrate its applicability. The supplemental information included comparisons between the predictions of the PHOENIX-P and ANC nuclear physics codes for Waterford 3 zero-power physics test measurements performed for Cycles 11 and 12. The comparisons showed that the maximum error for the potentially limiting fuel assemblies is within the uncertainty allowance on the assembly power used in the safety analysis.
Therefore, the licensee may utilize ANC to determine core operating limits for Waterford 3, as described in the SE for Amendment No. 210.
3.2 Technical Evaluation of Fuel Mislead Analysis In its submittal dated March 8, 2018, the licensee stated that the new fuel assembly mislead event analysis, which predicts fuel failure under the most limiting conditions, uses a similar methodology to the current analysis of record (AOR). One difference is that the new analysis determines the maximum required overpower margin (ROPM) for a given mislead regardless of the azimuthal tilt observed. This is different than the method used in the current AOR, which uses azimuthal tilt in the mislead analysis to help in detecting fuel assembly misleads. This change in method does not impact the operability conditions set in the technical specification related to the incore detectors and does not restrict operation of Waterford 3 if all the incore detectors are not fully operational.
Selection of Worst Mislead Candidates The Waterford 3 fuel assembly mislead event analysis assumes the worst configuration of failed incore detectors permitted by the TRM in the vicinity of the two interchanged assemblies.
Based on the reactivities and fissile content of the assumed misloaded assemblies and the reactivities of neighboring assemblies, several worst-case candidates are selected for the analysis.
Waterford 3 UFSAR Section 15.4.3.1, describes the worst undetectable single fuel assembly mislead event (worst undetectable mislead).
Each fuel assembly has a coded serial number located at its upper end fitting. Verification of this serial number is used as a means of positive identification for each assembly in the plant.
During refueling outages, a visual display is provided in the main control room showing a schematic representation of the reactor core, spent fuel pool, and new fuel storage area. At the completion of core loading, all fuel assemblies in the core are confirmed and independently verified to be in the proper location. However, despite these precautions, it is assumed that an assembly is placed in a wrong core position. The worst scenario is the interchange of two assemblies of different enrichment or reactivities. The worst undetectable mislead is defined as an undetectable mislead that either results in the minimum overpower margin (OPM) to departure from nucleate boiling (DNB), if DNB is not predicted to occur, or results in the maximum number of rods in DNB, if DNB is predicted to occur. The Waterford 3 licensing classification of the fuel assembly mislead event as a limiting fault means that the licensing analyses need not consider concurrent design basis accidents.
The licensee stated that a determination is made as to whether the mislead is detectable during startup. If the mislead is judged detectable, then it is eliminated from further consideration, since appropriate corrective action could be taken. Detectability of a fuel assembly mislead is
determined by simulation of the beginning of cycle (BOC) and the middle of cycle (MOC) reactivity and power distribution.
In a Request for Additional Information (RAI) dated September 25, 2018 (ADAMS Accession No. ML18262A041 ), the NRC staff asked the licensee to explain how candidates for the worst undetectable misload may be reliably identified from the vast number of possibilities. If the specific identification methodology had not been previously approved, the NRC staff requested further justification for the identification method.
In its response to the RAI by letter dated October 18, 2018, the licensee stated that the method of screening possible adverse fuel assembly misloads is the same as that used in the Waterford 3 AOR as well as that approved by the NRC for Palo Verde Nuclear Generating Station (ADAMS Accession No. ML17319A107). The initial screening involves comparing the k-infinity differences between two possible misloaded assemblies. The BOC and MOC k-infinity differences were calculated for the proposed misloads using the ANC code. The k-infinity difference at BOC is used to identify worst case undetectable fuel assembly misloads. The k-infinity difference at MOC is used to identify fuel assembly misloads with the highest ROPM.
The MOC is chosen since the ROPM limit is generally set at MOC, just after burnable absorber burnout. If a misload is undetectable at BOC but has a low ROPM at MOC it is not considered limiting. Likewise, if a misload has a high ROPM at MOC, but is highly detectable at BOC, it is also not considered limiting. Additional consideration was given for the assemblies immediately adjacent to the nominal ANC depletion peak radial peaking factor (Fr) locations throughout the cycle. For these locations, the k-infinity difference and interchange difference between the peak Fr adjacent assembly and every sub-region in the core were calculated using BOC k-infinity values. The maximum ANC Fr calculated from the base misload case is also a good indicator of the maximum ROPM, and as such was used as a screening parameter in order to ensure the worst undetectable misload would be captured.
The response to the RAI addresses the NRC staff concern by adequately explaining the method for determining the selection of the limiting misload candidates and providing adequate justification for the method; therefore, the staff finds the licensee's response acceptable.
Analysis of Fuel Failure and Peaking Factor The amount of fuel failure that occurs as a result of DNB is determined by counting the number of fuel rods that have a power greater than the Fr that corresponds to the ROPM. The licensee stated that significant margin to fuel centerline melt is maintained for the worst undetectable misload under all operating conditions.
In the RAI dated September 25, 2018, the NRC staff asked the licensee to explain how the amount of fuel failure that occurs as a direct result of DNB is determined and to discuss "CECOR code measured values" in the context of candidate misloads that could derive from several representative and potential future loading patterns.
The licensee, in its response dated October 18, 2018, stated that the core operating limit supervisory system (COLSS) assures that the core always maintains sufficient DNB OPM during normal operation to prevent fuel failure from Condition II transients to a 95/95 confidence level. The amount of margin that must be reserved for Condition II transients (i.e.,
ROPM) is predetermined and is one of the COLSS setpoints. The COLSS uses the CECOR-measured planar radial peaking factor (Fxy) in its online calculation of the DNB OPM.
If a fuel assembly misload were to occur, some of the effects of the misload would be seen in
the CECOR-measured Fxy. The CECOR-measured Fxy is input into COLSS, which would cause a decrease in DNB OPM. This means that only the decrease in DNB OPM associated with the unseen increase in Fxy would need to be accommodated by available margin to prevent fuel failure.
The CETOP code is used to correlate ROPM with an increase in Fxy to calculate the OPM associated with different values of Fxy. These CETOP calculations are used to determine the Fxy that would be equivalent to the current reserved ROPM value. Any fuel rod having an Fxy greater than the reserved COLSS ROPM calculated Fxy could have a departure from nucleate boiling ratio (DNBR) below the 95/95 DNBR limit. The Waterford mislead analysis. has assumed that the value of Fxy installed into COLSS for a core operating with a postulated mislead would be the value that CECOR would measure for that core assuming that 25 percent of the incore detectors were inoperable. Thus, the analysis assumed that all fuel rods having an Fxy greater than the reserved COLSS ROPM calculated Fxy would be below the 95/95 DNBR limit. To conservatively account for postulated DNB propagation, it was assumed that all the rods in any assembly having at least one rod with an Fxy greater than the reserved COLSS ROPM calculated Fxy would be counted as failed.
The response to the RAI addresses the NRC staff concern by adequately explaining its method for conservatively determining the number of failed fuel rods; therefore, the staff found the licensee's response acceptable.
Dose Consequence The new fuel assembly mislead event analysis determined an increase in the dose consequence of the worst undetectable mislead event (Waterford 3 UFSAR Section 15.4.3.1 ),
including consideration for failed incore detectors during startup and operation. In particular, the new analysis predicts 3.2 percent fuel failure, which includes a conservative accounting for DNB propagation. The licensee stated in its submittal dated March 8, 2018, that this result is bounded by the excess load with loss of alternating current event, which predicts 8 percent fuel failure. The licensee stated that both events predict fuel failure as a result of exceeding DNB limits. The licensee further stated that the release pathway for both events is the same (i.e.,
release to atmosphere from secondary side via atmospheric dump valves). As described in Waterford 3 UFSAR Section 15.1.2.3, "Increased Main Steam Flow with a Concurrent Loss of Offsite Power," the excess load with loss of alternating current power event is defined as an infrequent incident.
Because the licensee's new analysis of the fuel assembly mislead event was performed with an acceptable methodology and the predicted results are bounded by those of an existing, analyzed infrequent incident, the NRC staff finds the new analysis acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Louisiana State official was notified of the proposed issuance of the amendment on January 25, 2019. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has
determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding published in the Federal Register on June 19, 2018 (83 FR 28459). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b ), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The NRC staff has reviewed the licensee's license amendment request to revise Section 15.4.3.1 to update the analysis for the inadvertent loading of a fuel assembly into an improper position event for Waterford Unit 3. Based on the evaluation discussed above, the staff finds the proposed new fuel misload analysis satisfies 10 CFR 50.67 limits for dose consequences and also satisfies GDC 13, and therefore, it is acceptable.
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: Fred Forsaty Date: February 1 3 , 201 9
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3- ISSUANCE OF AMENDMENT TO REVISE SECTION 15.4.3.1 OF THE UPDATED FINAL SAFETY ANALYSIS REPORT TO ACCOUNT FOR FUEL MISLOAD (EPID L-2018-LLA-0058} DATED FEBRUARY 13, 2019 DISTRIBUTION:
PUBLIC RidsNrrDor1Lpl4 Resource PM File Copy RidsNrrLAPBlechman Resource RidsACRS_MailCTR Resource RidsNrrPMWaterford Resource RidsNrrDmlrMenb Resource RidsRgn4MailCenter Resource RidsNrrDorlLpl4 Resource FForsaty, NRR RidsNrrDssSnpb Resource JLehning, NRR RidsNrrDssSrxb Resource ADAMS A ccess,on No. ML19022A337 *b1yema1*1 dated **b>Y memo dated OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA NRR/DSS/SRXB/BC** NRR/DSS/SNPB/BC*
NAME APulvirenti PBlechman JWhitman Rlukes DATE 1/24/2019 1/24/2019 11/28/2018 1/24/2019 OFFICE NRR/DSS/MENB/BC* OGC-NLO NRR/DORL/LPL4/BC NRR/DORL/LPL4/PM NAME BBeasley KGamin RPascarelli APulvirenti DATE 1/24/2019 2/8/2019 2/13/2019 2/13/2019 OFFICIAL RECORD COPY