Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23348A35714 December 2023Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal MeetingSurveillance Frequency Control Program
Affidavit
W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program26 July 2023Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control ProgramAnticipated operational occurrence
Probabilistic Risk Assessment
Surveillance Frequency Control Program
ML22104A22212 May 2022Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554Shutdown Margin
Packing leak
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Process Control Program
Pressure Boundary Leakage
ML22075A10229 April 2022Issuance of Amendment No. 264 to Relocate Chemical Detection System Technical Specifications to Technical Requirements ManualProbabilistic Risk Assessment
Surveillance Frequency Control Program
Fire Protection Program
ML21279A2316 October 2021Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item ImprovementShutdown Margin
Packing leak
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Process Control Program
Pressure Boundary Leakage
ML21148A0528 June 2021Correction to License Amendment 214 Request to Support Next Generation Fuel; Review and Approval of Revised ECCS Performance Analysis; and Review and Approval of Supplement to the ECCS Performance Analysis
ML21116A14326 April 2021(Waterford 3) - Revision to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements ManualBoric Acid
Shutdown Margin
Surveillance Frequency Control Program
ML20148M10622 June 2020Corrections to Technical Specifications Issued in Amendments Nos. 102 and 225 and with the Renewed License
ML20113E83623 April 2020Summary of March 19, 2020, Category 1 Public Meeting with Entergy Operations Inc. a Planned LAR to Install Digital Systems in Accordance with Di&C ISG-06 Revision 2, Licensing Processes at Waterford Steam Electric StationSurveillance Frequency Control Program
ML19175A04211 September 2019Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application RulesTime of Discovery
Fire Protection Program
ML19022A33713 February 2019Issuance of Amendment No. 253 to Revise Section 15.4.3.1 of the Updated Final Safety Analysis Report to Account for Fuel MisloadAnticipated operational occurrence
ML17192A00727 July 2017Issuance of Amendment No. 250 Adoption of Technical Specifications Task Force Traveler TSTF 545, Revision 3Boric Acid
Shutdown Margin
Incorporated by reference
Missed surveillance
Surveillance Frequency Control Program
ML16077A27010 May 2016Issuance of Amendment No. 247 Regarding Cyber Security Plan Milestone 8 Full Implementation ScheduleCyber Security
W3F1-2016-0010, Responses to Request for Additional Information Regarding the Risk-Informed Surveillance Requirements License Amendment Request (LAR)3 March 2016Responses to Request for Additional Information Regarding the Risk-Informed Surveillance Requirements License Amendment Request (LAR)Internal Flooding
Probabilistic Risk Assessment
Surveillance Frequency Control Program
ML15289A14313 November 2015Redacted - Issuance of Amendment No. 246 Changes to Technical Specification 3.1.3.4 Regarding Control Element Assembly Drop Times
ML15244B3863 September 2015Correction to Issuance of Amendment Extension of the Integrated Leak Rate Testing to 15 YearsOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
ML15139A48331 August 2015Issuance of Amendment No. 245 Change to Updated Final Safety Analysis Report Clarifying Pressurizer Heaters Function for Natural Circulation at the Onset of a Loss of Offsite PowerBoric Acid
Shutdown Margin
Ultimate heat sink
Time Critical Operator Action
Power Uprate
ML15217A14324 August 2015Issuance of Amendment No. 244 Extension of the Integrated Leak Rate Testing to 15 YearsOffsite Dose Calculation Manual
Internal Flooding
Probabilistic Risk Assessment
Coatings
Annual Radioactive Effluent Release Report
Process Control Program
Large early release frequency
Moisture barrier
ML15138A44014 August 2015Orders Approving Transfer of Facility Operating Licenses and Indirect Transfer, Draft Conforming Amendment, and Safety Evaluation
W3F1-2015-0061, Provides Supplement to Revise Control Element Assembly Drop Times Associated with Technical Specification 3.1.3.414 August 2015Provides Supplement to Revise Control Element Assembly Drop Times Associated with Technical Specification 3.1.3.4
ML15174A22729 July 2015Issuance of Amendment of Technical Specifications s 3.9.6 and 3.9.7 to the Technical Requirements ManualProbabilistic Risk Assessment
ML14321A71310 December 2014Issuance of Amendment No. 241, Revise Operating License Condition for Change to Cyber Security Plan Milestone 8 Full Implementation DateCyber Security
W3F1-2014-0052, License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years28 August 2014License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 YearsProbabilistic Risk Assessment
Coatings
Large early release frequency
Moisture barrier
CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications20 November 2012Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff QualificationsHigh Radiation Area
Process Control Program
Fire Protection Program
W3F1-2012-0084, Technical Specification Change for Dry Cooling Tower Fans Out of Service for Ultimate Heat Sink8 October 2012Technical Specification Change for Dry Cooling Tower Fans Out of Service for Ultimate Heat SinkUltimate heat sink
Functionality Assessment
W3F1-2012-0028, Supplement 2 of License Amendment Request to Revise Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train22 May 2012Supplement 2 of License Amendment Request to Revise Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per TrainSafe Shutdown
Ultimate heat sink
Tornado Generated Missile
W3F1-2011-0067, License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train.13 October 2011License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train.Ultimate heat sink
ML11251031920 September 2011Correction of an Error in Amendment No. 226, Administrative Changes to Technical Specifications 6.9.1.11 and 6.9.1.11.1 Relating to Core Operating Limits ReportShutdown Margin
Coatings
ML1109501234 April 2011Attachment 2 to W3F1-2011-0021, Proposed Operating License Change (Mark-up) and Attachment 3, Revised Operating License PageCyber Security
ML10210015813 September 2010Issuance of Amendment No. 228, Modify Technical Specification Tables 2.2-1 and 3.3-1 to Clarify Notes and ActionsShutdown Margin
Anticipated operational occurrence
ML10215046613 September 2010Issuance of Amendment No. 227, Modify Technical Specification 3/4.9.7, Crane Travel - Fuel Handling Building to Permit Certain Operations Needed for Dry Cask Storage of Spent Nuclear FuelSafe Shutdown
Probabilistic Risk Assessment
Earthquake
Control of Heavy Loads
W3F1-2010-0065, Response to Request for Additional Information Associated with Technical Specification Table 3.4-1 Isolation Valve Addition12 August 2010Response to Request for Additional Information Associated with Technical Specification Table 3.4-1 Isolation Valve Addition
W3F1-2010-0047, License Amendment Request for Proposed Change to Technical Specification 3.7.1.2, Emergency Feedwater System.20 July 2010License Amendment Request for Proposed Change to Technical Specification 3.7.1.2, Emergency Feedwater System.Power change
2CAN051001, Response to Request for Additional Information Associated with Core Operating Limits Report References17 May 2010Response to Request for Additional Information Associated with Core Operating Limits Report ReferencesShutdown Margin
Anticipated operational occurrence
Coatings
Fuel cladding
ML10111003522 April 2010Correction to Technical Specification Page 3/4 3-10 Issued with Amendment No. 225 Technical Specification Change to Relocate Steam Generator Level - High Trip Function
W3F1-2010-0011, License Amendment Request, Technical Specification Change Regarding Steam Generator Program22 February 2010License Amendment Request, Technical Specification Change Regarding Steam Generator ProgramNondestructive Examination
ML10055046322 February 2010Request for Amendment to Technical Specification Table 3.4-1 Isolation Valve AdditionCode Reconciliation
Power-Operated Valves
W3F1-2009-0045, License Amendment Request to Modify Technical Specification Information for Table 2.2-1 and Table 3.3-122 October 2009License Amendment Request to Modify Technical Specification Information for Table 2.2-1 and Table 3.3-1Shutdown Margin
Anticipated operational occurrence
Fuel cladding
W3F1-2009-0021, License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit3 June 2009License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety LimitAnticipated operational occurrence
Fuel cladding
W3F1-2008-0051, Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 38 January 2009Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 3
ML08199047230 July 2008License and Technical Specification Pages, Issuance of Amendment No. 216, Modify Diesel Generator Fuel Oil Testing Surveillance Requirements
ML0812700369 May 2008Tech Spec Page for Correction to Amendment 214 Request to Support Next Generation Fuel; Review & Approval of Revised ECCS Performance Analysis; & Review & Approval of Supplement to ECCS Performance Analysis
ML08038000616 April 2008License Page 4 and Technical Specification Page 5-5, Issuance of Amendment No. 215 Use of Optimized ZIRLO-TM Fuel Rod Cladding
ML08088001515 April 2008Tech Spec Pages for Amendment 214, Request to Support Next Generation Fuel; Review and Approval of ECCS Performance Analysis; and Review and Approval of Supplement to ECCS Performance AnalysisShutdown Margin
Coatings
ML08044012712 February 20082/12/2008 E-mail from Licensee Enclosing Markup of Technical Specification Page 5-5, Supplement to 4/24/2007 License Amendment Request Use of Optimized ZIRLO-TM Fuel Rod Cladding
W3F1-2008-0001, License Amendment Request NPF-38-275, Containment Isolation Valves.2 January 2008License Amendment Request NPF-38-275, Containment Isolation Valves.
W3F1-2007-0033, License Amendment Request NPF-38-273 to Modify Requirements Regarding Control Room Envelope Habitability16 August 2007License Amendment Request NPF-38-273 to Modify Requirements Regarding Control Room Envelope HabitabilitySafe Shutdown
Incorporated by reference
Grace period
ML07116034824 April 2007License Amendment Request to Allow the Use of Optimized Zirlo Fuel Rod CladdingExemption Request
Fuel cladding
ML07068033719 March 2007Tech Spec Pages for Amendment 212 Reactor Coolant System Leakage Detection InstrumentationGrab sample
ML0703704316 February 2007Technical Specifications, Issuance of Amendment No. 211 to Facility Operating License Removal of Vendor Recommended Diesel Generator Surveillance Requirement