IR 05000458/2003007

From kanterella
Jump to navigation Jump to search
IR 05000458-03-007, on 10/27-11/07/2003, Entergy Operations, Inc.; River Bend Station; Baseline Inspection of the Identification and Resolution of Problems. a Violation Was Identified in the Area of Effectiveness of Problem Identification
ML033520017
Person / Time
Site: River Bend 
Issue date: 12/17/2003
From: Gody A
Operations Branch IV
To: Hinnenkamp P
Entergy Operations
References
IR-03-007
Download: ML033520017 (22)


Text

December 17, 2003

SUBJECT:

RIVER BEND STATION - NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000458/2003-007

Dear Mr. Hinnenkamp:

On November 7, 2003, the NRC completed an inspection at your River Bend Station. The enclosed report documents the inspection findings, which were discussed on November 7, 2003, with you and other members of your staff.

This inspection was an examination of activities conducted under your license as they relate to the identification and resolution of problems, compliance with the Commissions rules and regulations, and the conditions of your operating license. Within these areas, the inspection involved selected examination of procedures, representative records, observations of activities, and interviews with personnel.

On the basis of the sample selected for review, which included 207 condition reports, 22 audit reports, and 27 security incident reports, the team concluded that problems were properly identified, evaluated, and corrected. There was one green finding identified during this inspection associated with the failure to identify conditions that would have caused unexpected entry into Technical Specification Action Statements and had the potential to cause secondary containment to be inoperable. This finding was determined to be a violation of NRC requirements. However, because of its very low safety significance and because it has been entered into your corrective action program, the NRC is treating this finding as a noncited violation, in accordance with Section VI.A.1 of the NRC's Enforcement Policy. If you deny this noncited violation, you should provide a response with the basis for your denial, within 30 days of the date of this inspection report, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington DC 20555-0001, with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the resident Inspector at the River Bend Station facility. In addition, several examples of human performance errors were identified that were not entered into the corrective action program.

Entergy Operations, Inc.

-2-In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web-site at http://www.nrc.gov/NRC/Adams/index.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Anthony T. Gody, Chief Operations Branch Division of Reactor Safety Docket: 50-458 License: NPF-47

Enclosure:

NRC Inspection Report 50-458/03-07

REGION IV==

Dockets:

50-458 Licenses:

NPF-47 Report No.:

05000458/2003-007 Licensee:

Entergy Operations, Inc.

Facility:

River Bend Station Location:

5485 U.S. Highway 61 St. Francisville, Louisiana Dates:

October 27 through November 7, 2003 Inspectors:

M. Murphy, Senior Operations Engineer, Operations Branch R. Azua, Project Engineer, Project Branch C B. Nicholas, Senior Health Physicist, Plant Support Branch P. Alter, Senior Resident Inspector, Projects Branch B Approved By:

Anthony T. Gody, Chief Operations Branch Division of Reactor Safety

-2-

SUMMARY OF FINDINGS

IR 05000458-2003-007, Entergy Operations, Inc.; on 10/27-11/07/2003, River Bend Station;

Baseline inspection of the identification and resolution of problems. A violation was identified in the area of effectiveness of problem identification.

The inspection was conducted by one senior operations engineer, one senior resident inspector, one project engineer, and one senior health physicist. One green finding of very low safety significance was identified during this inspection and was classified as a noncited violation. The finding was evaluated using NRC Inspection Manual Chapter 0609, "Significance Determination Process." The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 3, dated July 2000.

Identification and Resolution of Problems The team concluded that the licensee was effective at identifying problems and putting them into the corrective action program. The licensees effectiveness at problem identification was evidenced by the relatively few deficiencies identified by external organizations (including the NRC) that had not been previously identified by the licensee, during the review period.

However, the team identified a repetitive failure on the part of the licensee to properly identify the inability of secondary containment doors to close and potential failures of secondary containment. The licensee effectively used risk in prioritizing the extent to which individual problems would be evaluated and in establishing schedules for implementing corrective actions.

Corrective actions, when specified, were generally implemented in a timely manner. Licensee audits and assessments were found to be effective. On the basis of interviews conducted during this inspection, workers at the site felt free to input safety findings into the problem identification and resolution program (4OA2).

Cornerstone: Barrier Integrity

Green:

The inspectors identified a non-cited violation of 10 CFR Part 50, Appendix B,

Criterion XVI, for failure to identify conditions that would have caused unexpected entry into Technical Specification Action Statements and had the potential to cause secondary containment to be inoperable.

The issue was more than minor because it affects the reactor safety/barrier integrity cornerstone objective to provide reasonable assurance that physical design barriers protect the public from radionuclide release caused by accidents or events. The results of the phase one evaluation of the significance determination process was that the issue was of very low safety significance because the finding only represents a degradation of the radiological barrier function provided by the auxiliary building and the duration of each of the 9 incidents was less than 10 minutes.

REPORT DETAILS

OTHER ACTIVITIES (OA)

4OA2 Problem Identification and Resolution

Effectiveness of Problem Identification

a. Inspection Scope

The team reviewed items selected across the seven cornerstones of safety to determine if problems were being properly identified, characterized, and entered into the corrective action program for evaluation and resolution. Specifically, the team selected 207 condition reports and 3 maintenance action items that had been issued between November 27, 2001 and September 29, 2003. The team also reviewed 22 licensee audit, surveillance and self-assessment reports, including several addressing various aspects of the problem identification and resolution program. The effectiveness of the audits and assessments was evaluated by comparing the audit and assessment results against self-revealing and NRC-identified findings. In addition, the team reviewed the licensees response to 1 noncited violation, 1 licensee event report, 11 NRC information notices, 8 industry operating events, and 7 vendor 10 CFR Part 21 reports.

The team evaluated the condition reports and NRC findings to determine the licensees threshold for identifying problems and entering them into the corrective action program.

Also, the licensees efforts in establishing the scope of problems were evaluated by reviewing pertinent control room logs, work requests, self-assessment results, system health reports, trending reports, and action plans. The industry experience information was reviewed to assess if issues applicable to River Bend Station were appropriately addressed. The condition reports and other documents listed in the attachment were used to facilitate the review.

The team reviewed 280 incident reports written by a contractor department during the period from November 1, 2002, to October 31, 2003, to assess the departments evaluation of and the scope of problems identified with equipment and personnel errors which resulted in the incidents. In addition, the team reviewed the departments multi-step corrective action program designed to reduce the number of violations caused by plant personnel. The team interviewed the superintendent and other members of the department to determine the effectiveness of the program.

b.

Assessment The team determined that the licensee was effective at identifying problems and entering them into the corrective action system. This was evidenced by the relatively few deficiencies identified by external organizations (including the NRC) that had not been previously identified by the licensee during the review period. Licensee audits and assessments were of good depth and identified issues similar to those that were self-revealing or raised during previous NRC inspections.

However, the team determined that although the contractor departments multi-step corrective action program was designed to reduce the number of violations caused by plant personnel, it failed to follow other licensee guidance and policies for the identification and correction of human performance errors. Program records did not sufficiently document the cause of the human errors, human performance traps encountered and human performance tools that could have been used to avoid repetition of the same error. Additionally, no condition reports were written for any of these human errors. Based on interviews with the site human performance coordinator, the team determined that this program was not monitored by the site human performance team and that the human errors identified met licensee guidance for documentation in the corrective action program.

Introduction The team identified a repetitive failure on the part of the contractor department to properly identify the inability of secondary containment doors to close and potential failures of secondary containment. From January 30 through March 16, 2003, 9 such events occurred and were not reported to the main control room for evaluation against technical specification requirements. The team determined that the risk associated with this noncited violation of 10 CFR Part 50, Appendix B, Criteria XVI, was of very low safety significance (Green) because the duration of each failed open secondary containment door was less than 10 minutes.

Description Based on a review of the incident reports written between January 30 and March 16, 2003, the inspectors determined that comtractor department personnel responded to door alarms 10 times when the doors in question were secondary containment doors between the turbine building and the auxiliary building. On 9 of those occasions, the doors were found in a condition where the doors locking mechanism latches were extended so that the door could not close if required. On 2 occasions there was no one present at the door. Although the person causing the alarm was present on each of the other 7 occasions, that person was not capable of correcting the problem to close the door. In each case, the secondary containment door was not capable of closing against its sealing surface, until the locking mechanism was released and the door closed by the responding department personnel.

On each occasion, contractor department personnel initiated an incident report, in accordance with Plant Security Procedure PSP-4-104, Administration (Reporting Events), Revision 19, or after March 3, 2003, the Department's Instruction SDI-005, Reporting Requirements and Matrix, Revision 0. Additionally, the person causing the problem was given a Violation Notification in accordance with the departments Multi-Step Corrective Action Program. In none of these cases, did the department personnel or their shift supervision inform the main control room of the failed open secondary containment doors. Technical Specification 3.6.4.1 required that the auxiliary building shall be Operable in MODE 1. One requirement for Operable as stated in Technical Specification Basis 3.6.4.1. was that At least one door in each access to the Auxiliary Building and Shield Building Annulus is closed, except for routine entry and exit of personnel and equipment. In each case, the door was incapable of closing against its sealing surface until the condition was corrected by the responding department peraonnel 2 to 8 minutes after the alarm.

Although the contractor personnel routinely respond to door alarms there was no guidance given to their on-shift supervisors, who receive the alarms and dispatch personnel to unsecured doors, for reporting failed open secondary containment doors to the main control room. However, the licensees corrective action program, as described in Policy LI-102, Corrective Action Process, Revision 2, in effect at the time, listed in 9.2, any unplanned entry or failure to enter a[n] LCO as an example of an adverse condition required to be documented in a condition report. The inspectors determined that incident reports were reviewed each working day by the licensee security staff and that this incident report data was rolled up into a monthly report and quarterly memo that was sent to senior licensee management. The licensees quality assurance department regularly performed a quarterly audit of the program. When interviewed, the licensee contractor superintendent and the quality assurance supervisor stated that they only evaluate the information based on the requirements, not in relation to other station requirements.

Analysis The team determined that the 9 failures on the part of plant personnel to properly secure the secondary containment doors were potential failures of secondary containment.

The issue was more than minor because it affects the reactor safety/barrier integrity cornerstone objective to provide reasonable assurance that physical design barriers protect the public from radionuclide release caused by accidents or events. The results of the phase one evaluation of the significance determination process was that the issue was of very low safety significance because the finding only represents a degradation of the radiological barrier function provided by the auxiliary building and the duration of each of the 9 incidents was less than 10 minutes.

Enforcement The team determined that the repetitive failure of the contractor personnel to report failed open secondary containment doors to the main control room was a violation of 10 CFR Part 50, Appendix B, Criterion XVI, for failure to identify conditions adverse to quality. In addition, the incident reports written to track these incidents were reviewed by licensee contractor supervision and the quality assurance department, yet no condition reports were issued identifying the missed entry into a required technical specification action statement. Because this problem identification and resolution problem was of very low safety significance and has been entered into the corrective action program as Condition Report CR-RBS-2003-3515, this violation is being treated as a noncited violation, consistent with Section VI.A of the NRC Enforcement Policy.

2. Prioritization and Evaluation of Issues

a. Inspection Scope

The team reviewed approximately 218 condition reports and supporting documentation, including root cause evaluations, to ascertain whether the licensee identified and considered the full extent of conditions, generic implications, common causes, and previous occurrences. The team also reviewed the other documents cited in Section 4OA2.1.a to evaluate whether issues applicable to River Bend Station were properly prioritized and evaluated.

The team attended corrective action review board meetings, which reviewed the root-cause analyses for two significant condition reports. The team evaluated the corrective action review board input into the root-cause analyses and suggestions for improvement of the corrective actions recommended by the root-cause analyses teams.

The team also evaluated the revised root-cause analyses and final corrective actions presented to the corrective action review board chairman for his approval. Finally, the team ensured that the revised corrective actions were included in the condition report program for resolution.

b.

Assessment Based on a review of the licensees records, the team concluded that it effectively prioritized and evaluated issues.

Effectiveness of Corrective Actions

a. Inspection Scope

The team reviewed the condition reports, audits, assessments, and trending reports described in Section 4OA2.1.a above to verify that corrective actions related to the issues were identified and implemented in a timely manner commensurate with safety, including corrective actions to address common cause or generic concerns. A listing of specific documents reviewed during the inspection is included in the attachment to this report.

The team evaluated the timeliness and adequacy of operability determinations and evaluations. The team reviewed corrective actions planned and implemented by the licensee and sampled specific technical issues to determine whether adequate decisions related to structure, system, and component operability were made.

b.

Assessment The team concluded that implemented corrective actions for those conditions reviewed were effective.

4. Assessment of Safety-Conscious Work Environment

a. Inspection Scope

The team interviewed 28 individuals from the licensees staff, which represented a cross-section of functional organizations and supervisory and non-supervisory personnel. These interviews assessed whether conditions existed that would challenge the establishment of a safety-conscience work environment. The team also sampled safety-related concerns placed into the licensees employee concerns program to ascertain that the licensee had provided appropriate responses. The employee concerns program provided an alternate method to the corrective action program for employees to raise safety concerns, with the option of remaining anonymous.

b.

Assessment The team identified no findings related to the safety-conscience work environment at the facility. The team concluded, based on information collected and reviewed from the interviews, that employees were willing to identify safety issues and enter them into a corrective action system.

4OA6 Exit Meeting

The team discussed the findings with Mr. Paul Hinnenkamp and other members of the licensees staff on November 7, 2003. Licensee management acknowledged that proprietary materials examined during the inspection had been returned. No proprietary information is discussed in this report.

ATTACHMENT PARTIAL LIST OF PERSONS CONTACTED Licensee L. Ballard, Supervisor, Quality R. Biggs, Coordinator, Nuclear Safety Assurance M. Boyles, Manager, Radiation Protection J. Clark, Admin. Support, Operations J. Fowler, Manager, Quality Assurance R. Godwin, Manager, Training J. Heckenberger, Manager, P. Hinnenkamp, Vice President, River Bend Station K. Huffstatler, Technical Specialist, Licensing A. James, Superintendent, Security R. King, Director, Nuclear Safety Assurance D. Lorfing, Acting Manager, Licensing T. Lynch, Manager, Operations J. McGhee, Manager, Maintenance P. Page, ALARA Supervisor, Radiation Protection K. Talbot, Supervisor, Instuments and Controls W. Trudell, Manager, Corrective Actions and Assessment

DOCUMENTS REVIEWED

PLANT PROCEDURES

PL-162

Human Performance Program

R01

PSP-4-104

Administration (Reporting Security Events)

R19

RBNP-006

Plant Security Requirements and Responsibilities

R13

RBNP-078

Operability Determinations

R07

SDI-005

Security Reporting Requirements and Matrix

R00

API-06

Alarm Station Supervisor

R40

EP-02-018

Technical Support Center R26

EP-305

CFR 50.54(q) Review Program

R00

EP-401

Public Use of Emergency Preparedness Owner

R00

Controlled Area

EIP-2-002

Classification Actions

R22

-2-

EIP-2-026

Evacuation, Personnel, Accountability, Search

R15

and Rescue

EPP-2-201

River Bend Station Emergency Preparedness

R18

Organization and Responsibilities

SOP-0113

Liquid Radwaste Processing/Recovery Sample

R10

Tank System (SYS #603)

FPP-0010

Fire Fighting Procedure

R10

ADM-0009

Station Fire Protection Program

R08

RBNP-052

RBS Trending System

R08

LI-102

Corrective Action Process

R03

OE-100

Operating Experience Program

R01

EDG-AA-115 Engineering Request-Response Development

R04

ADM-0009

Station Fire Protection Program

R08

SOP-0071

Rod Control and Information System

R12

MAINTENANCE ACTION ITEM

MAI 350059 - Seal Internal Conduit Seal for 1CX958NA on Elevation 137 - 10"

MAI 350060 - Seal Internal Conduit Seal for 1CX958NB on Elevation 137 - 10"

MAI 350061 - Seal Internal Conduit Seal for 1CK600NE2 on Elevation 137 - 10"

CONDITION REPORTS

CR-RBS-2003-00336

CR-RBS-2003-00685

CR-RBS-2003-01260

CR-RBS-2002-00366

CR-RBS-2002-00450

CR-RBS-2002-00114

CR-RBS-2002-00088

CR-RBS-2002-00012

CR-RBS-2001-01617

CR-RBS-2001-01523

CR-RBS-2001-01158

CR-RBS-2001-00438

CR-RBS-2001-00355

CR-RBS-2001-02177

CR-RBS-2000-01600

CR-RBS-1999-01634

CR-RBS-2003-03176

CR-RBS-2003-03248

CR-RBS-2003-03202

CR-RBS-2003-01328

CR-RBS-2002-00079

CR-RBS-2003-00523

CR-RBS-2001-01713

CR-RBS-2002-00183

CR-RBS-2002-00369

CR-RBS-2002-00372

CR-RBS-2002-00502

CR-RBS-2002-00542

CR-RBS-2002-00573

CR-RBS-2002-00603

-3-

CR-RBS-2002-00606

CR-RBS-2002-00653

CR-RBS-2003-00043

CR-RBS-2003-00044

CR-RBS-2003-00274

CR-RBS-2003-00571

CR-RBS-2003-00576

CR-RBS-2003-00577

CR-RBS-2003-00624

CR-RBS-2003-00652

CR-RBS-2003-00697

CR-RBS-2003-00947

CR-RBS-2003-01949

CR-RBS-2003-01950

CR-RBS-2003-01992

CR-RBS-2003-01993

CR-RBS-2003-02094

CR-RBS-2003-02095

CR-RBS-2002-00291

CR-RBS-2002-00351

CR-RBS-2002-01840

CR-RBS-2003-00730

CR-RBS-2003-00774

CR-RBS-2003-00850

CR-RBS-2003-00866

CR-RBS-2003-00868

CR-RBS-2003-00899

CR-RBS-2003-01729

CR-RBS-2003-02141

CR-RBS-2003-02529

CR-RBS-2003-02909

CR-RBS-2003-03094

CR-RBS-2003-03199

CR-RBS-2002-00199

CR-RBS-2002-00326

CR-RBS-2002-00352

CR-RBS-2002-00582

CR-RBS-2002-00924

CR-RBS-2002-01069

CR-RBS-2002-01079

CR-RBS-2002-01080

CR-RBS-2002-01081

CR-RBS-2002-01090

CR-RBS-2002-01113

CR-RBS-2002-01190

CR-RBS-2002-01193

CR-RBS-2002-01219

CR-RBS-2002-01331

CR-RBS-2002-01380

CR-RBS-2002-01714

CR-RBS-2002-01769

CR-RBS-2002-01814

CR-RBS-2002-01859

CR-RBS-2002-01871

CR-RBS-2002-01889

CR-RBS-2002-01896

CR-RBS-2002-02043

CR-RBS-2003-00110

CR-RBS-2003-00228

CR-RBS-2003-00229

CR-RBS-2003-00295

CR-RBS-2003-00234

CR-RBS-2003-00235

CR-RBS-2003-00433

CR-RBS-2003-00467

CR-RBS-2003-00508

CR-RBS-2003-00520

CR-RBS-2003-00566

CR-RBS-2003-00881

CR-RBS-2003-01016

CR-RBS-2003-01052

CR-RBS-2003-01099

CR-RBS-2003-01111

CR-RBS-2003-01115

CR-RBS-2003-01132

CR-RBS-2003-011780

CR-RBS-2003-01189

CR-RBS-2003-01205

CR-RBS-2003-01213

CR-RBS-2003-01391

CR-RBS-2003-01442

CR-RBS-2003-01507

CR-RBS-2003-01540

CR-RBS-2003-01602

CR-RBS-2003-01779

CR-RBS-2003-01982

CR-RBS-2003-02290

CR-RBS-2003-02685

CR-RBS-2003-02783

CR-RBS-2003-02804

CR-RBS-2003-02809

CR-RBS-2003-02811

CR-RBS-2003-02847

CR-RBS-2003-02881

CR-RBS-2003-02925

CR-RBS-2003-03005

CR-RBS-2003-03006

CR-RBS-2003-03007

CR-RBS-2003-03008

CR-RBS-2002-00159

CR-RBS-2002-00517

CR-RBS-2002-00531

CR-RBS-2002-01573

CR-RBS-2003-00055

CR-RBS-2003-00284

CR-RBS-2003-00321

CR-RBS-2003-00383

CR-RBS-2003-02804

CR-RBS-1998-0794

CR-RBS-1999-1914

CR-RBS-1999-1915

CR-RBS-2000-0865

CR-RBS-2000-1395

CR-RBS-2002-0684

CR-RBS-2002-0688

CR-RBS-2002-1372

CR-RBS-2002-1704

CR-RBS-2002-1911

CR-RBS-2003-2054

CR-RBS-2003-2437

CR-RBS-2003-2955

CR-RBS-2003-3203

CR-RBS-2003-3409

CR-RBS-2003-3462

CR-RBS-2003-3501

CR-RBS-2003-3515

CR-RBS-2002-0397

CR-RBS-2002-0893

CR-RBS-2002-1523

CR-RBS-2003-275

CR-RBS-2003-02082

CR-RBS-2003-02621

CR-RBS-2003-3071

CR-RBS-2003-03072

CR-RBS-2003-03073

CR-RBS-2003-03074

CR-RBS-2003-03075

CR-RBS-2003-03076

CR-RBS-2003-03078

CR-RBS-2003-03079

CR-RBS-2003-03080

CR-RBS-2003-03081

CR-RBS-2003-03082

CR-RBS-2003-03083

CR-RBS-2003-03084

CR-RBS-2003-03085

CR-RBS-2003-03086

-4-

CR-RBS-2003-03087

CR-RBS-2003-03088

CR-RBS-2003-03089

CR-RBS-2003-03090

CR-RBS-2003-03091

CR-RBS-2003-03092

CR-RBS-2003-03093

CR-RBS-2003-03094

CR-RBS-2003-03095

CR-RBS-2003-03096

CR-RBS-2003-03097

CR-RBS-2003-03098

CR-RBS-2003-03099

CR-RBS-2003-03100

CR-RBS-2003-030101

CR-RBS-2003-02379

CR-RBS-2002-00761

CR-RBS-2002-01000

CR-RBS-2002-02275

CR-RBS-2002-00684

CR-RBS-1998-0384

CR-RBS-2003-01754

CR-RBS-2003-01438

CR-RBS-2003-00388

CR-RBS-2002-02000

CR-RBS-1999-01522

CR-RBS-2002-01547

CR-RBS-2002-01550

CR-RBS-2003-02685

Security Incident Reports

SIR-2003-018

SIR-2003-019

SIR-2003-039

SIR-2003-043

SIR-2003-045

SIR-2003-048

SIR-2003-052

SIR-2003-053

SIR-2003-054

SIR-2003-056

SIR-2003-057

SIR-2003-058

SIR-2003-059

SIR-2003-061

SIR-2003-062

SIR-2003-065

SIR-2003-067

SIR-2003-069

SIR-2003-072

SIR-2003-076

SIR-2003-082

SIR-2003-084

SIR-2003-090

SIR-2003-092

SIR-2003-093

SIR-2003-185

SIR-2003-210

AUDITS AND ASSESSMENTS

QA-16-2001-W3-1-Multi-Site, Multi-Site Security Audit Report, November 5 - 29, 2001

QA-16-2002-GGNS-1-Multi-Site, Multi-Site Security Audit Report, November 2 - December 10,

2002

QA-7-2002-RBS-1, Emergency Plan, April 8 - May 6, 2002

QA-7-2003-RBS-1, Emergency Plan, April 21 - May 9, 2003

QS-2002-RBS-001, Emergency Preparedness Owner Controlled Area Evacuations,

January 16-24, 2002

QS-2002-RBS-006, Emergency Plan Team A Training Drill, February 4-6, 2002

QS-2002-RBS-027, Followup to Corrective Actions Associated with Emergency Preparedness

White Finding, October 15 - November 4, 2002

QA-14-2003-RBS-1, Radiation Protection, January 13 - February 28, 2003

QS-2002-RBS-015, ALARA Planning and Controls, June 24 - July 3, 2002

QS-2002-RBS-018, ALARA Program, August 2-6, 2002

-5-

QS-2002-RBS-021, Access Control to Radiologically Significant Areas, August 19 -

September 11, 2002

QS-2003-RBS-004, Evaluation of Radiation Work Permit Justification for Dose Estimate

Revision, February 10-14, 2003

QS-2003-RBS-012, Radiation Work Permit Dose Extensions, July 28-30, 2003

ALARA Planning and Controls Focus Area Self-Assessment, January 7-24, 2002

QA-2-2002-RBS-1, Chemistry Program, September 23 - October 21, 2002

QS-2003-RBS-013, Followup to Corrective Actions Associated with 2002 Quality Assurance

Chemistry Audit, July 7-28, 2003

QA-15-2001-RBS-1, "Radwaste"

QA-4-2002-RBS-1, "Design Control (Engineering)"

QA-9-2002-RBS-1, "Fire Protection"

QA-1-2002-RBS-1, "FFD/AA"

QA-18-2002-RBS-1. "Tech. Specs."

OPERATING EXPERIENCE REPORTS

Industry Operational Event OE17170, Turbine Lube Oil Interface Valve Oil Leak,

dated October 28, 2003

Industry Operational Event OE17169, Defective Vendor Equipment Releases Oil into

River, dated October 28, 2003

Industry Operational Event OE17107, Control Rod Movement Not Recognized During

Plant Startup Rod Withdrawal, dated October 16, 2003

Industry Operational Event OE12866, Automatic Scram During Turbine Testing, Dated

October 26, 2003

Industry Operational Event OE17169, Defective Vendor Equipment Releases Oil into

River, dated August 5, 2003

Industry Operational Event OE17173, Grid Instabilities Cause Turbine Generator Trip

with Reactor Scram, dated August 14, 2003

-6-

Industry Operational Event OE17171, Auxiliary Feedwater Train 1 Inoperability Due to

Response Time, dated September 23, 2003

Industry Operational Event OE17172, Ineffective Implementation of the Procedure

Governing Oversight of Contractors, dated August 2, 2003

IN 03018 - General Electric Type SBM Control Switches With Defective Cam Followers

IN 03014 - Potential Vulnerability of Plant Computer Network to Worm Infection

IN 03008 - Potential Flooding Through Unsealed Concrete Floor Cracks

IN 03003 - Part 21: Inadequate Staked Capscrew Renders RHR Pump Inoperable

IN 03001 - Failure of a Boiling Water Reactor Target Rock Main Steam Safety/Relief

Valve

IN 02036 - Incomplete or Inaccurate Information Provided to Licensee and/or NRC by

Any Contractor or Subcontractor Employee

IN 02006 - Design Vulnerability in BWR Reactor Vessel

IN 01013 - Inadequate Standby Liquid Control System Relief Valve Margin

IN 01012 - (er) Hydrogen Fire at a Nuclear Power Station

Part 21s:

2002-18: Air Start System Pressure Reducing Valve, Norgen R18 Relieving

2002-23: Failures of Capacitors in Damping Circuits of Certain Models 1153 and 1154

2002-35: Broken Solder joints (Crack in Solder Joint) on Some Pins on the Tap Blocks

of Power Shield Trip Devices

2003-36: Premature Gellation or Significant Thickening Prior to the End of the 12-Month

Shelf Life Expiration Date of Carbonize 11 SG

2003-01: Unstaked Capscrews Renders Residual Heat Removal Pump Inoperable

2003-05: Main Steam Isolation Valve Disc Separated from its Stem Allowing the

Disc/Piston Assembly to Drop into the Valve Seat

2003-17: Condition Reported with an EMD Electric Start Motor at Oyster Creek

Generating Station

-7-

OTHER

OSRC Meeting RBS-2001-042 Minutes, August 30, 2001

OSRC Meeting RBS-2001-061 Minutes, November 15, 2001

SEC-2003-012, Security Monthly Report - June 2003, July 24, 2003

River Bend Station RF-11 Reactor Reassembly Radiological Work Plan, 4/04/03

River Bend Station RF-11 Reactor Vessel Reassembly Cavity Decontamination Job Guide,

4/04/03

Significant Event Response Team (SERT) Root Cause Analysis Report, Containment

Contamination During Reactor Disassembly, 5/22/03

Root Cause Analysis Report, Reactor Core Isolation Cooling (RCIC) Locked High Radiation

Entry, 12/12/02

Root Cause Analysis Report, Refuel Floor Commenced Core Alterations Prior to Required

Postings Being Established, 4/29/03

Technical Requirements Manual, Revision 83

Offsite Dose Calculation Manual, Revision 12

RBS Quarterly Trend Report, 3rd Quarter 2003

Entergy Operations, Inc., Problem Trending Guide, Revision 2

Nuclear Management Manual OE-100, Operating Experience Program, Revision 1

Engineering Department Guide EDG-AA-115, Engineering Request-Response Development,

Revision 4

-8-

Information Request 1 - July 2003

River Bend PIR Inspection (IP 71152; Inspection Report 50-458/03-07)

The inspection will cover the period of November 27, 2001 to September 29, 2003. All

requested information should be limited to this period unless otherwise specified. The

information may be provided in either electronic or paper media or a combination of these.

Information provided in electronic media may be in the form of e-mail attachment(s), CDs, or 3

1/2 inch floppy disks.

Please provide the following information to Michael Murphy in the NRC Region IV Arlington

office by October 6, 2003:

1.

Summary list of all condition reports of significant conditions adverse to quality opened

or closed during the period

2.

Summary list of all open condition reports which were generated during the period

3.

Summary list of all open condition reports which were generated prior to the latest

refueling outage

4.

Summary list of all condition reports closed during the specified period

5.

A list of all corrective action documents that subsume or "roll-up" one or more smaller

issues for the period

6.

List of all root cause analyses completed during the period

7.

List of root cause analyses planned, but not complete at end of the period

8.

List of plant safety issues raised or addressed by the employee concerns program

during the period

9.

List of action items generated or addressed by the plant safety review committees

during the period

10.

All quality assurance audits and surveillances of corrective action activities completed

during the period

11.

A list of all quality assurance audits and surveillances scheduled for completion during

the period, but which were not completed

2.

All corrective action activity reports, functional area self-assessments, and non-NRC

third party assessments completed during the period

13.

Corrective action performance trending/tracking information generated during the period

and broken down by functional organization

14.

Current revision of the following procedures:

-9-

ADM-022, "Conduct of Operations"

ADM-0023, "Conduct of Maintenance"

CPN LI-102, "Corrective Action Process"

EDG-PR-001, "Maintenance Rule Program"

EDG-PE-002, "Guidline for Performing 10 CFR Part 21 Applicability Reviews"

ENG-3-033, "Modification Design Control Plan"

ENG-3-037, "Engineering Request Process"

LI-102, "Corrective Action Process"

OE-100, "Operating Experience Program"

PEP-0219, "Reliability Monitoring Program"

RBNP-002, "Root Cause Determination Guidance"

RBNP-010, "Configuration Management"

RBNP-030, "Initiation and Processing of Condition Reports"

RBNP-062, "River Bend Industry Events and Analysis Program"

RBNP-069, "Significant Event Evaluation"

RBNP-078, "Operability Determinations"

15.

Any additional governing procedures/policies/guidelines for:

a.

Condition Reporting

b.

Corrective Action Program

c.

Root Cause Evaluation/Determination

16.

A listing of all external events evaluated for applicability at River Bend during the period

17.

Condition Reports or other actions generated for each of the items below:

a.

All LERs issued by River Bend during the period

b.

NCVs and Violations issued to River Bend during the period

c.

Part 21s reviewed during the period.

18.

Safeguards event logs for the period (will review onsite)

19.

Radiation protection event logs

20.

Current system health reports or similar information

21.

Current predictive performance summary reports or similar information

2.

Corrective action effectiveness review reports generated during the period