February 28, 2024

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR RIVER BEND STATION - REPORT 05000458/2023006

Dear Phil Hansett:

The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of River Bend Station, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2023, through December 31, 2023. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program

- Operations Phase.

The NRC determined the performance at River Bend Station during the most recent quarter was within the Regulatory Response Column, the second highest performance column of the NRCs Reactor Oversight Process (ROP) Action Matrix. This conclusion was based on a single inspection finding having low-to-moderate safety significance (White) in the Emergency Preparedness Cornerstone originating in the third quarter of 2023, and all performance indicators (PIs) within the expected range (Green).

The enclosed inspection plan lists the inspections scheduled through December 31, 2025.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact Jeffery E. Josey at 817-200-1148 with any questions you have regarding this letter.

Sincerely, Geoffrey B Miller, Director Division of Operating Reactor Safety Docket No. 05000458 License No. NPF-47 Enclosure:

Inspection Plan Distribution:

[Include ROPassessment.Resource@nrc.gov.]

Signed by Miller, Geoffrey on 02/28/24

SUNSI Review ADAMS:

Non-Publicly Available Non-Sensitive Keyword:

By:

Yes No Publicly Available Sensitive NRC-002 OFFICE SPE:DORS/PBC SPE:DORS/PBC BC:DORS/PBC D:DORS NAME MBloodgood WSchaupt JJosey GMiller SIGNATURE MRB4 WTS1 JEJ1 GMB DATE 02/14/24 02/14/24 02/15/24 02/28/24

Site Inspection Activity Plan 07200049 - River Bend (ISFSI)

01/01/2024 - 12/31/2025 Unit Start End Activity CAC Title Staff Count River Bend ISFSI (Part 72) Loading Inspection (multiple weeks, dry runs, 72.212, first loading)

6/1/2024 8/31/2024 IP 60854 001000 Preoperational Testing Of An ISFSI 6/1/2024 8/31/2024 IP 60855 001001 Operation Of An ISFSI 6/1/2024 8/31/2024 IP 60856 001003 Review of 10 CFR 72.212(b) Evaluations Prepared on 2/20/2024 10:43:41 AM 1 of 4

Site Inspection Activity Plan River Bend 01/01/2024 - 12/31/2025 Unit Start End Activity CAC Title Staff Count IP95001 Radiation Monitor Supplemental (White)

1 1/2/2024 2/23/2024 IP 71152 000748 Problem Identification and Resolution (PI&R)

1/2/2024 2/23/2024 IP 71153 000749 Follow Up of Events and Notices of Enforcement Discretion

1/2/2024 2/23/2024 IP 95001 000938 Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs RP 1,4,PI

1 3/25/2024 3/29/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

3/25/2024 3/29/2024 IP 71124.04 000728 Occupational Dose Assessment

3/25/2024 3/29/2024 IP 71151 001397 Performance Indicator Verification Security Equipment (.04), Security Training (.07)

1 3/25/2024 3/29/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

3/25/2024 3/29/2024 IP 71130.07 000739 Security Training EP Exercise & PI Inspection (2024) - RBS

1 6/24/2024 6/28/2024 IP 71114.01 000716 Exercise Evaluation

6/24/2024 6/28/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

6/24/2024 6/28/2024 IP 71151 001397 Performance Indicator Verification RP 6,7

1 7/8/2024 7/12/2024 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment

7/8/2024 7/12/2024 IP 71124.07 000731 Radiological Environmental Monitoring Program RBS 2024 BRQ

1 9/8/2024 9/14/2024 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Commercial Grade Dedication Inspection - River Bend Station

1 9/9/2024 9/13/2024 IP 71111.21N.03 001808 Commercial Grade Dedication

9/23/2024 9/27/2024 IP 71111.21N.03 001808 Commercial Grade Dedication Security Access Control (.02), Security Plan Changes (.09), Security PIV (71151)

1 10/7/2024 10/11/2024 IP 71130.02 000734 Access Control

10/7/2024 10/11/2024 IP 71130.09 001656 Security Plan Changes

10/7/2024 10/11/2024 IP 71151 001338 Performance Indicator Verification Target Set Inspection (71130.14)

1 10/21/2024 10/22/2024 IP 71130.14 000743 Review of Power Reactor Target Sets MC&A - Material Control and Accounting

1 11/12/2024 11/15/2024 IP 71130.11 000742 Material Control and Accounting (MC&A)

RBS 2024 INITIAL EXAM

Prepared on 2/20/2024 10:43:41 AM 2 of 4

Site Inspection Activity Plan

10/6/2024 10/12/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

11/17/2024 11/23/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

Cyber Security Inspection - RBS

1 2/10/2025 2/14/2025 IP 71130.10 000741 Cybersecurity RP 1,3,PI - RBS

1 2/24/2025 2/28/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

2/24/2025 2/28/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

2/24/2025 2/28/2025 IP 71151 000746 Performance Indicator Verification Inservice Inspection-RBS

1 3/3/2025 3/12/2025 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

License Renewal 71003-RBS (Phase 2)

1 5/5/2025 5/9/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal

5/19/2025 5/23/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal RBS 2025 Biennial PI&R

1 5/19/2025 5/23/2025 IP 71152B 000747 Problem Identification and Resolution

6/2/2025 6/6/2025 IP 71152B 000747 Problem Identification and Resolution Security Access Control (71130.02), Security Plan Changes (71130.09), Security PIV (71151)

1 6/23/2025 6/27/2025 IP 71130.02 000734 Access Control

6/23/2025 6/27/2025 IP 71130.09 001656 Security Plan Changes

6/23/2025 6/27/2025 IP 71151 001338 Performance Indicator Verification EP 2025 Program Inspection - RBS

1 7/14/2025 7/18/2025 IP 71114.02 000717 Alert and Notification System Testing

7/14/2025 7/18/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

7/14/2025 7/18/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

7/14/2025 7/18/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness

7/14/2025 7/18/2025 IP 71151 001397 Performance Indicator Verification RP 5,8 - RBS

1 8/4/2025 8/8/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation

8/4/2025 8/8/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Age-Related Degradation Inspection - River Bend Station

1 9/8/2025 9/12/2025 IP 71111.21N.04 001832 Age-Related Degradation

9/22/2025 9/26/2025 IP 71111.21N.04 001832 Age-Related Degradation FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - RB

1 9/29/2025 10/3/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

10/20/2025 10/24/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing RBS 2025 INITIAL EXAM

Prepared on 2/20/2024 10:43:41 AM 3 of 4

Site Inspection Activity Plan

10/19/2025 10/25/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

11/16/2025 11/22/2025 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)