IR 05000458/2024005
| ML24232A256 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 08/22/2024 |
| From: | Jeffrey Josey NRC/RGN-IV/DORS |
| To: | Hansett P Entergy Operations |
| Shared Package | |
| ML24232A256 | List: |
| References | |
| IR 2024005 | |
| Download: ML24232A256 (1) | |
Text
August 22, 2024
SUBJECT:
UPDATED INSPECTION PLAN FOR RIVER BEND STATION (REPORT 05000458/2024005)
Dear Phil Hansett:
The enclosed inspection plan lists the inspections scheduled through June 30, 2026, for River Bend Staton. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Agency Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)
component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 817-200-1148 with any questions you have regarding this letter.
Sincerely, Jeffrey E. Josey, Chief Reactor Projects Branch C Division of Operating Reactor Safety Docket No. 05000458 License No. NPF-47 Enclosure:
Inspection Plan
cc w/encl: Distribution via LISTSERV Signed by Josey, Jeffrey on 08/22/24
ML24232A256 X SUNSI Review By: WSchaup ADAMS:
X Yes No Sensitive X Non-Sensitive Non-Publicly Available X Publicly Available Keyword NRC-002 OFFICE SPE:DORS/C BC:DORS/C NAME WSchaup JJosey SIGNATURE
/RA/
/RA/
DATE 8/22/2024 8/22/2024
Enclosure Prepared on 8/14/2024 1:11:43 PM Page 1 of 3 Site Inspection Activity Plan 07200049 - River Bend (ISFSI)
07/01/2024 - 06/30/2026 River Bend ISFSI non-loading inspection and ISFSI Aging Management Inspection
Unit Start End Activity CAC Title Staff Count 9/1/2025 9/30/2025 IP 60855 001001 Operation Of An ISFSI
Site Inspection Activity Plan Prepared on 8/14/2024 1:11:43 PM 2 of 3 River Bend 07/01/2024 - 06/30/2026 Unit Start End Activity CAC Title Staff Count RP 6,7
1 7/8/2024 7/12/2024 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment
7/8/2024 7/12/2024 IP 71124.07 000731 Radiological Environmental Monitoring Program RBS 2024 BRQ
1 9/8/2024 9/14/2024 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Commercial Grade Dedication Inspection - River Bend Station
1 9/9/2024 9/13/2024 IP 71111.21N.03 001808 Commercial Grade Dedication
9/23/2024 9/27/2024 IP 71111.21N.03 001808 Commercial Grade Dedication Security Access Control (.02), Security Plan Changes (.09), Security PIV (71151)
1 10/7/2024 10/11/2024 IP 71130.02 000734 Access Control
10/7/2024 10/11/2024 IP 71130.09 001656 Security Plan Changes
10/7/2024 10/11/2024 IP 71151 001338 Performance Indicator Verification Target Set Inspection (71130.14)
1 10/21/2024 10/22/2024 IP 71130.14 000743 Review of Power Reactor Target Sets RBS 2024 INITIAL EXAM
1 10/6/2024 10/12/2024 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
11/17/2024 11/23/2024 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
Inservice Inspection-RBS
1 3/3/2025 3/12/2025 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
1 3/3/2025 3/7/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
3/3/2025 3/7/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
3/3/2025 3/7/2025 IP 71151 000746 Performance Indicator Verification License Renewal 71003-RBS (Phase 2)
1 5/5/2025 5/9/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal
5/19/2025 5/23/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal RBS 2025 Biennial PI&R
1 5/19/2025 5/23/2025 IP 71152B 000747 Problem Identification and Resolution
6/2/2025 6/6/2025 IP 71152B 000747 Problem Identification and Resolution Security Access Control (71130.02), Security Plan Changes (71130.09), Security PIV (71151)
MC&A - Material Control and Accounting
1 11/12/2024 11/15/2024 IP 71130.11 000742 Material Control and Accounting (MC&A)
Site Inspection Activity Plan Prepared on 8/14/2024 1:11:43 PM 3 of 3
6/23/2025 6/27/2025 IP 71130.02 000734 Access Control
6/23/2025 6/27/2025 IP 71130.09 001656 Security Plan Changes
6/23/2025 6/27/2025 IP 71151 001338 Performance Indicator Verification EP 2025 Program Inspection - RBS
1 7/14/2025 7/18/2025 IP 71114.02 000717 Alert and Notification System Testing
7/14/2025 7/18/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
7/14/2025 7/18/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
7/14/2025 7/18/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness
7/14/2025 7/18/2025 IP 71151 001397 Performance Indicator Verification RP 5,8 - RBS
1 8/4/2025 8/8/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation
8/4/2025 8/8/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Age-Related Degradation Inspection - River Bend Station
1 9/8/2025 9/12/2025 IP 71111.21N.04 001832 Age-Related Degradation
9/22/2025 9/26/2025 IP 71111.21N.04 001832 Age-Related Degradation FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - RB
1 9/29/2025 10/3/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing
10/20/2025 10/24/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Cyber Security Inspection - RBS
1 10/20/2025 10/24/2025 IP 71130.10 000741 Cybersecurity RBS 2025 INITIAL EXAM
1 10/19/2025 10/25/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
11/16/2025 11/22/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
1 2/2/2026 2/6/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
2/2/2026 2/6/2026 IP 71124.04 000728 Occupational Dose Assessment
2/2/2026 2/6/2026 IP 71151 000746 Performance Indicator Verification Fire Protection Inspection - RBS
1 2/23/2026 3/6/2026 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
EP Exercise & PI Inspection (2026) - RBS
1 6/22/2026 6/26/2026 IP 71114.01 000716 Exercise Evaluation
6/22/2026 6/26/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
6/22/2026 6/26/2026 IP 71151 001397 Performance Indicator Verification In-Office Exercise Scenario Review (2026) -
1 4/24/2026 5/23/2026 IP 71114.08 000723 Exercise Evaluation - Scenario Review