Text

.

ENCLOSURE 1 NOTICE OF VIOLATION North Atlantic Energy Service Corporation Docket No. 50-443 Seabrook Station, Unit 1 Licensee No. NPF-86 During an NRC inspection conducted durirg the period August 16 through October 4, 1997, a violation of NRC requirements was identified. in accordance with the " General Statement of Policy and Procedures for NRC Enforcement Actions," NUREG 1600, the violation is listed below.

Technical Specification 6.7.1.a states, in part, that writton procedures shall be implemented as recommended in Appendix A of Regulatory Guide (RG) 1.33. RG 1.33 states that procedures should be implemented to control maintenance activities.

Contrary to the above, procedures were not implemented as noted below.

A. Procedure IN1640.910,MDT-20 SG Feed Pump A Speed Control Calibration, step 8.9.1 required that the lifting of an electricallead (D4) be documented.

On September 18,1997,I&C technicians performing troubleshooting activities on the "A' main feed pump ddFP), lif ted electricallead (D4) without documenting this action as required. This resutted in the MFP being reassembled and tested without terminating lead (D4), defeating the electrical trip capability of the MFP.

B. Maintenance Procedure MA 3.0, Work Practices required that design engineering ovaluate replacement parts that look different from the originally installed part.

During refueling outage five. the nitrogen fill line check valves (NG-V22 and NG V24) to the "C" and "D" safety injection accumulators were reassembled with incorrect springs that had not been evaluated by design engineering.

The NG V22 valve then failed to operate while attempting to charge the "C" safety injection accumulator.

This is a Severity Level IV Violation (Supplement 1).

Pursuant to the provisions of 10 CFR 2.201, North Atlantic Energy Service Corport, tion is hereby required to submit a written stateinent or explanation to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555, with a copy to the Regional Administratcr, Region I, within 30 da/s of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a

" Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Your response may reference or include previous docketed correspondence, if the I

9712010377 971120 PDR 0 ADOCK 05000443 PDR

l 2

correspondence adequately addresses the required response. If an adequate reply is not received within the time specified in this Notice, an order or a Demand for Information may -

- be issued as to why the license should not be modified, suspended, or revoked, or w y such other action as may be proper should not be taken. Where good cause is shown, consideration will be given to extending the response time.

Because your response will be placed in the NRC Public Document Room _(PDR), to the extent possible, it should not include any personal privacy, proprietary, or safeguards

' information so that it can be placed in the PDR without redaction However, if you find it =

necessary to include such information, you should clearly indicate the specific information that you desire not to be placed in the PDR, and provide the legal basis to support your request for withholding tho information from the public, Dated at King of Prussia, PA ,'

this 20th day of November,1997, ,