IR 05000443/1993011
| ML20057G297 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 10/12/1993 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20057G286 | List: |
| References | |
| 50-443-93-11, NUDOCS 9310210239 | |
| Download: ML20057G297 (1) | |
Text
y t
,- -
-
- -.
,
,
mm
.,
-
- h '/Of yk
~',-
@
3-
.1
'
&
-
p. N.
...
.r
.
M
. Good success was noted in reactor vessel disassembly / reassembly work. The licensee l
Leontracted the services of an individual experienced with this work. A counterbalanced
'
rigging technique was developed to minimize the weight the reactor vessel stud exerts on the
g threads during installation / removal and this helps protect the threads from subsequent repairs.
o
-
The licensee putehased a remote-operated reactor vessel stud hole cleaning device as there
+
was difficulty removing five studs in OR01. The capability to clean the reactor flanges
'
remotely has been purchased for future use.
E t
, Permanent scaffolding was installed around the pressurizer to facilitate easy access to the
. pressurizer heaters and permanent scaffolding for the Steam Generator (SG) hand-hole
,
elevation was under consideration to reduce exposure incurred in SG sludge lancing.
_
' Die ALARA Supervisor stated that actual exposures received in conducting MOV surveillances were higher than the established goal due to rework conducted as a result of l
g
' deficiencies found during the conduct of the surveillances.
i
.
.
!
No dedicated window to emplace shielding in the containment was provided for OR02. The
y licensee d_id not track RWP-hours; the ALARA Supervisor stated that this statistic would not
be particularly beneficial as some work activities were prestaged in the annulus. The
"
licensee sponsored several trips to other nuclear stations and Westinghouse in support of
.
p ALARA reviews in preparation for OR02.
e
~
i y
4.2
' ALARA Program Controls -
j
~
JAs part of this inspection, the following procedure controlling ALAPA planning was j
Jreviewed.
'
-
,
RP15.1, " Job Preplanning and Review for Radiation Exposure Control," Revision 6, e
s 8/31/92.
.
!
The licensee controlled work by assignmg a cogmzant individual known as the " job
.L supervisor;" this individual was responsible for the overall planning effort associated with
. each particular job. ~ Initially, job supervisors were tasked with initial job scoping and
.,
acquisition of an initial exposure estimate from the Health Physics Department. The 1 procedure required that the ALARA plan for a job with a sceping exposure estimate of.2.10
-
'
- person-rem receive.h1 approval from the Radiation Safety Committee (RSC). Jobs with a
. scoping exposure estimate.2.1 person-rem but < 10 person-rem required an ALARA review
-
but were not required to receive RSC approval. Jobs with an~ exposure estimate of < 1 Lperson-rem did not require preparation of a formal ALARA package; ALARA preplanning was performed and documented through the Radiation Work Permit (RWP) process.
,
- Additionally; the following guidance was contained in this procedure. ~ "During the initial y
years of Seabrook. Station op: ration, when radiation fields are low and few jobs are expected to exceed these exposure levels, the Health Physics Department Supervisor may establish 8 '
criteria commensum with planning capabilities."'. No guidance concerning airborne
,
'
j
'
.
/.
- 9310210239 931012*
@[D PDR 4.
-y f
- G ADOCK 05000443
,
PDR'
,
(
.
,
Ik-
'