Forwards Emergency Preparedness Implementation Appraisal Followup Insp Rept 50-412/87-33 on 870421-23.No Violations Noted.Items Requiring Corrective Action Summarized in Section 4 of Rept
ML20214J653
Person / Time
Site: Beaver Valley
Issue date: 05/18/1987
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Carey J
DUQUESNE LIGHT CO.
Shared Package
ML20214J657 List:
References
NUDOCS 8705280149
Download: ML20214J653 (2)


See also: IR 05000412/1987033

Text

.. ..

- _ . -

_

_ _ _ _ - _ _ -

.

.

.

.

MAY 18 1987

,

Docket No. 50-412

Duquesne Light Company

ATTN: Mr. J. J. Carey

Senior Vice President

Nuclear Group

Post Office Box 4

Shippingpert, Pennsylvania 15077

Gentlemen:

Subject:

Inspection Report No. 50-412/87-33

4

This report forwards 'the findings of the Beaver Valley Power Station Unit 2

Emergency Preparedness Implementation Appraisal follow up inspection which was

conducted April 21-23, 1987 by Messrs. E. Fox, Jr. and C. Gordon of this of-

fice at your Beaver Valley Power Station Unit 2, Shippingport, Pennsylvania.

Discussions of our findings were held by Mr. Fox with Mr. Pavlechko and other

members of your staff at the conclusion of the inspection.

The areas examined during this inspection were limited to reviewing your

corrective actions regarding the significant findings and improvement items

,

identified during the Emergency Preparedness Appraisal-(Inspection No. 87-14)

conducted on March 2-6, 1987. Within these areas, the inspection consisted.of

selective examinations of procedures, representative records, interviews with

personnel, and observations by the inspectors which relate to emergency pre-

paredness items in need of corrective action prior to fuel load, low power,

and full power.

Within the scope of this inspection, no violations were observed. Those items

,

requiring corrective action ai

summarized in section 4 of the inspection

report and are categorized as .o whether they must be corrected prior to fuel

load, criticality, low power or full power operations.

Your cooperation with us in this matter is appreciated.

Sincerely,

Origina1 Signe

71

,

'

~

'

8705280149 870518

64245

c_._,

PDR

ADOCK 05000412

i

G

PDR

Thomas T. Mar-

n,

irect

Division of Radiation Safety

and Safeguards

Enclosure: NRC Region I Inspection Report No.'50-412/87-33

0FFICIAL RECORD COPY

IR BV2 87-33 - 0001.0.0

05/15/87

i\\53s

-

-

- _ _ .

_.

__

-

-

- - . - .-

- - _ _

_

.-.

_

.

.

--

-_

-

-- . ._-

.

.

.

.

Duquesne Light Company

2

.

cc w/ encl:

J. D. Sieber, Vice President, Nuclear

J. Crockett, Senior Manager, Nuclear Operations

E. Ewing, Quality Assurance Manager

R. J. Swiderski, Manager, Startup Group

J. P. Thomas, Manager, Engineering

R. E. Martin, Manager, Regulatory Affairs

C. O. Richardson, Stone and Webster Engineering Corporation

f

FEMA Region III

Public Document Room (PDR)

'

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

.

NRC Resident Inspector

Commonwealth of Pennsylvania

bcc w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

DRP Section Chief

W. Troskoski, SRI, BV-1

P. Tam, LPM, NRR

T. Martin, DRSS

S. Ebneter, DRS

A. Lodewyk, DRS

Robert J. Bores, DRSS

0,1(r"

g

RI: E S

RI:DRSS

SS

RI:DRSS L

RI:DRSS

Fox /rw/ms

Gordon

Lazarus

Bellamyf

-

TMartin

5/1$/87

5/($/87

5/k/87

5//h/87

5/ /87

.

OFFICIAL RECORD COPY

IR BV2 87-33 - 0002.0.0

l

05/15/87

,

_c

- . -

,

,.m--

, -..--

- - - - - - - -- _ , - - , -

9

.a

.

.,,.__,e__.

,p.y

,,

.__...y

__-.m.e

- , . . - -

---,-

e

-1

,_

.-~w..

w --