Text
.
.
/
'o,,
UNITED STATES
!"
NUCLEAR REGULATORY COMMISSION
.
o
$
aE REGION 11
o 101 MARIETTA ST., N.W., SUITE 3100 g
ATLANTA,0:O;;GiA 303o3
.....
Report Nos. 50-369/79-30 and 50-370/79-17 Licensee: Duke Power Company 422 South Church Street Charlotte, North Carolina 28242 Facility Name: McGuire Nuclear Station, Unit 1 and 2 Docket Nos. 50-369 and 50-370 License Nos. CPPR-83 and CPPR-84 Inspection at McGu' e Si ne lotte, North Carolina Inspector:
,,.. M c->7zy
[7 M
'
N. Etoh o f
patySigned
-
Approved by:
I fO
[
,
A. R. Herdt, Section Chief, RC&ES Branch Date Signed SUMMARY Inspection on August 21-24, 1979 Areas Inspected Th. o routine, unannounced inspection involved 26.5 inspector-hours onsite in the areas of preservice inspection program review, procedure review and work observation (Unit 2); welding of safety-related piping and personnel access hatch (Unit 2); hanger inspection (welding) (Unit 1); licensee action on previous findings (Unit 2).
Results No items of noncompliance or deviations were identified.
1255J324
7911050
20 4
.
.
.
DETAILS 1.
Persons Contacted Licensee Employees
- G. W. Grier, III, Projec+ Engineer
- J. R. Wells, Corporate QA Manager
- E. B. Miller, Project Senior QA Engineer
- W. R. Gillespie, QA Technician
- W. M. Newton, QA Inspector (Hangers)
Other licensee employees contacted during this inspection included six construction craftsmen.
Other Organizations Babcock and Wilcox Construction Company (B&W)
- M. Hacker, PSI Group Leader
- R. J. Patterson, Assistant Group Leader
- Attended exit interview.
2.
Exit Interview The inspection scope and findings were summarized on August 24, 1979 with those persons indicated in Paragraph I above. The inspec-tor identified the areas inspected which included preservice non-destructive examination activities, observation of welding, review of QA records and observation of hanger inspection. The licensee concurred with the inspection findings.
3.
Licensee Action on Previ.c3 Inspection Findings a.
(Closed) Infraction 370/79-04-04, Housekeeping and Storage Conditions around Work Area. Duke letter of response dated March 26, 1979 has been reviewed and determined to be acceptable by Region II.
b.
(Closed) Infraction, 370/79-04-03, Use of Same Brush to Clean Carbon and Stainless Steel Welds. Duke letter of response dated March 26, 1979 has been reviewed and determined to be acceptable by Region II.
c.
(Closed) Infraction 370/79-04-01, Use of Nonconformed Penetrameter.
Duke letter of response dated March 26, 1979 has been reviewed and determined to be acceptable by Region II.
1255 325
-
.
.
-2-
.
d.
(Closed) Deficiency 370/79-08-02, Failure to Record Weld Fabrication Changes. Duke letter of response dated May 3, 1979 has been reviewed and determined to be acceptable by Region II.
The inspector held discussions with the project senior QA engineer and examined the corrective actions as stated in the letters of response listed in a, b, c and d above. The inspector concluded that Duke had determined the full extent of the subject noncompliances, performed the necessary survey and followup actions to correct the present conditions and developed the necessary corrective actions to preclude recurrence of similar circiunstances. The corrective actions identified in the letter of response have been implemented.
e.
(Closed) Unresolved 370/79-08-01, Pecord of Weld Machine Output Checks. Administrative memorandum 141 Revision 0 dated April 8, 1979 requires welding machines to be checked for voltage and ampere output on a monthly basis.
Procedure M-4 has been revised to provide for documentation of this activity on form (M-40). The inspector reviewed the records for checks made during June and July, 1979.
4.
Unresolved Items Unresolved items were not identified during this inspection.
5.
Independent Inspection Effort a.
Plant Tour (Unit 2)
The inspector performed a general inspection of various work areas to observe certain pipe handling, installation and welding activities in progress and to inspect the general state of housekeeping, cleanliness, including control of unused weld electrodes near the working areas and proper use of wire brushes on stainless steel material.
b.
Observation of Weld Activities (Unit 2)
Welds in various stages of fabrication were selected for observation and record review. The applicable codes were USAS B31.1 or ASME Section III, 1971 Edition.
I2551326
~
.
-3-Weld Number Size ISO Condition NC2FW47-5 3" x 348" MCFI-2NC47 In Process NC2FW47-3 3" x 348" MCFI-2NC47 In Process WL2FW108-2 4" x Schedule 10 MCFI-2SL-168 In Process SM2FW13-20 6" Noz. to Pipe MCFI-SM2EW13 Repair SM2FW13-10 42" x.875" MCFI-SM2EW13 Completed SM2FW13-1 34" x 1.250" MCFI-SM2EW13 Completed CF2FW24-5 Integrally Welded Lugs Completed
-
CF2FW25-7 Integrally Welded Lugs Completed
-
CF2FW25-6 Integrally Welded Lugs Completed
-
CF2FW25-5 Integrally Welded Lugs
-
Completed Following are welds of attachments (pads) welded on the personnel access hatch: E11DU2, E11CU2, E11BU2, E11AU2 and E7AU2. These welds were checked for workmanship / appearance, weld rod issue slips; process control records including post weld heat treat charts, as applicable and isometrics were reviewed for completeness and accuracy. Quality records for weld consumables produced from heat numbers 411E-8481, E-7018, 3/32"
- C3064, ER-308, 1/8" p and 16797C, ER-308, 3/32" 9 were reviewed for compliance with specification requirements.
c.
Radiographic Film Review Radiographs of completed main steam header nozzle to pipe welds on main steam line D in Unit 2 were reviewed to ascertain whether they met applicable code and radiographic procedure NDE-10A R/3 requirements. These welds were identified as follows:
SM2FW9-16 2SM-9 9" x 1.468" SM2FW9-17 2SM-9 9" x 1.468" SM2FW9 18 2SM-9 9" x 1.468" SM2FW9-19 2SM-9 9" x 1.468" SM2FW9-20 2SM-9 9" x 1.468" d.
Hanger Inspection (Unit 1)
At the time of this inspection, the licensee had inspected /
accepted 1000 out of approximately 14697 hangers. The licensee outlined the inspection program which is designed to provide administrative control and technical / engineering support to this effort. Hangers are checked by engineering for conformance with specification and isometric drawing requirements. Field inspections are performed by QC in accordance with construction department procedure M-15E R/4.
\\255 327
.
-4-The inspector observed the inspection of the following hangers:
Hanger System IMCANB1075, Revision 1 Boron Recycle IMCAMVH412, Revision 0 Chemical and Volume Control IMCAFWH31, Revision 1 Feedwater Within the areas inspected, no items of noncompliance or deviations were identified.
6.
Preservice Inspection (Unit 2)
a.
Program Review The preservice inspection (baseline) is being performed by Babcock and Wilcox Construction Company (B&W) under contract with Duke Power Company (DPC). Examination requirements, documentation and reporting of results will be governed by Section XI, 1974 Edition of the ASME Code with (S75) Addenda.
B&W's, QA Manual for inservice inspection (ISI) activities, reviewed and approved by DPC, contains quality assurance policies and administrative procedures written to comply with the requirements of Appendix B to 10 CFR 50 and ANSI standard N45.2.6 as applicable. Activities addressed in the aforemen-tioned manual include audits, qualification, indoctrination /
training of QA personnel, audits, documentation, handling of deviations, inspection procedure review, process control, corrective action, document control, control of examination equipment and quality records. Following is a list of B&W, QA policies and/or administrative procedures reviewed by the inspector. They are contained in the QA manual and address the above areas.
QA Policy Procedures 9-QA-201 R/3 QA Program 9-QA-202 R/6 Organization 9-QA-204 R/1 Instructions Procedure 9-QA-205 R/3 Document Control 9-QA-208 R/2 Control of Special Processes 9-QA-209 R/4 Inspection 9-QA-210 R/1 Control of Measuring and Test Equipment 9-QA-213 R/2 QA Records 9-QA-215 R/2 Audits 1255l28
.
'
-5-QA Administrative Procedures 9A-153 R/2 QA Audits 9A-154 R/1 Qualification # Audit Personnel Procedures 9A-167 through 9A-171 address the qualification requirements of personnel performing liquid penetrant inspection, magnetic particle inspection, ultrasonic inspection, radiography and Eddy current inspection.
ISI Procedures ISI-61 Control of manuals and reports ISI-64 R/11 Handling of NDE data for PSI /ISI examinations ISI-65 R/5 Use of Data Base System Following is a list cf DPC procedures which impact PSI /ISI activities including control of nonconforming items and record storage:
QCL-5 Control of ISI Activities QCK-1 Control of Nonconforming Items QA-111 R/1 Interdivisional Transfer of QA Records QA-504 Quality Assurance Records, Operations The Preoperational Inspection Manual, Volume 2, approved on April 23, 1979, contains a listing of welds scheduled for examination. Welds are listed in a format consistent with that in IVB-2000 and IWC-2000 of the Code.
Examination category, inspection method (s) coverage, etc., are specified.
Within the areas inspected, no items of noncompliance or deviations were identified.
b.
Procedure I. view Procedures used to perform the required examination on designated class 1 and 2 welds are contained in B&W's Preoperational Inspection Manual Volume 3, " Procedures and Calibration Standards".
Procedures are written to comply with Section XI of the ASME Code requirements as discussed in 6.a above. The manual had been approved by B&W's Level IIi examiner and DPC on February 1, 1979.
-
1255 52v
~
.
-6-A sample of NDE procedures used for the PSI examination of welds were selected for review of content and technical adequacy; these were as follows:
ISI-120, R/7
"UT Examination of Class 1 and 2 Piping Welds Joining Similar and Dissimilar Materials" ISI-240, R/7
" Penetrant Examination of Weld and Base Materials Including Studs, Nuts and Washers" ISI-270 R/4
" Wet or Dry Methods of Magnetic Particle Examination of Welds, Studs, Nuts Bolts" c.
Observation of Work Activities At the time of this inspection, B&W had completed the examina-tion of 29 Class I welds, 395 Class 2 welds, the reactor coolant pumps and Eddy current examination of steam generator tubes; examination of the vessel was performed and completed during September of 1978-this activity was not inspected.
Applicable code requirements are discussed in paragraph 6.a above.
At the time of this inspection, Class 2 pipe welds were being examined. The inspector witnessed the UT examination of the following welds:
Weld Size Figure Results ND2F-244
.90" x 8" 9 C.2.1.222 360 Intermitant Indications
ND2F-24-1
.91" x 8" 9 C.2.1.345 360 Intermitant Indications The above welds were examined in accordance with B&W procedure No. ISI-120, Revision 7.
Personnel perfort.ng the examination and interpreting results were thoroughly familiar with the above procedure and properly qualified as verified by their certifications.
Examination results were recorded as required by the PSI program. The apparatus, calibration including DAC curve construction, calibration standard, weld examination (scann.ing)
with 0 degrees and 45 degrees transducers was in compliance with code and procedural requirements.
The licensee's administra-tive controls were consistent with FSAR commitments.
kfbb b
-
.
-7-
,
Within the areaa inspected, no items of noncompliance or deviations were identified.