May 31, 2001

SUBJECT:

ANNUAL ASSESSMENT LETTER - MCGUIRE NUCLEAR STATION (NRC INSPECTION REPORT 50-369,370/01-01)

Dear Mr. Barron:

On April 30, 2001, the NRC staff completed its end-of-cycle plant performance assessment of the McGuire Nuclear Station. The end-of-cycle review for McGuire involved the participation of all technical divisions in evaluating performance indicators (PIs) and inspection results for the period of April 2, 2000, to March 31, 2001. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections which may conflict with your plant activities.

Overall, McGuire operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, at this time we plan to conduct only baseline inspections, routine Independent Spent Fuel Storage Installation related inspections, and license renewal related inspections at your facility through May 31, 2002. We also wish to advise you that performance of an Operational Safeguards Response Evaluation (OSRE) is currently being considered for sometime in 2002. This consideration is based on the amount of time that has elapsed since the last OSRE at McGuire.

The enclosed inspection plan details the scheduled inspections that will occur through May 31, 2002. This inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

For your information, the NRC is in the process of aligning the inspection and assessment cycle with the calendar year. In order to transition to a calendar year cycle (January 1 - December 31),

the current inspection and assessment cycle will consist of only three quarters (i.e. the second, third and fourth calendar quarters of CY 2001). As a result, for this transition period only, the number of inspection activities have been modified accordingly and a mid-cycle review letter and accompanying inspection plan will not be issued.

DEC

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change our inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4550 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Robert C. Haag, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17 Enclosure: McGuire Nuclear Station Inspection/Activity Plan cc w/encl:

Regulatory Compliance Manager (MNS)

Duke Energy Corporation Electronic Mail Distribution Manager Nuclear Regulatory Licensing Duke Energy Corporation 526 S. Church Street Charlotte, NC 28201-0006 Lisa Vaughn Legal Department (PB05E)

Duke Energy Corporation 422 South Church Street Charlotte, NC 28242 Anne Cottingham Winston and Strawn Electronic Mail Distribution Mel Fry, Director Division of Radiation Protection N. C. Department of Environmental Health & Natural Resources Electronic Mail Distribution County Manager of Mecklenburg County 720 East Fourth Street Charlotte, NC 28202 Peggy Force Assistant Attorney General N. C. Department of Justice Electronic Mail Distribution

DEC

Distribution w/encl:

R. Martin, NRR RIDSNRRDIPMLIPB PUBLIC PUBLIC DOCUMENT (circle one): YES NO OFFICE SIGNATURE rc NAME RCarroll DATE 5/24/2001 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: I:\\RPB1\\McGuire\\End of Cycle Reviews 2001\\ASSESSLTRmcg.wpd

Page 1 of 2 McGuire 06/01/2001 10:27:38 Inspection / Activity Plan 06/01/2001 - 05/31/2002 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number

MB MR

- MAINT RULE Baseline Inspections 06/10/2001 06/14/2001 Maintenance Rule Implementation IP 7111112B 1, 2

PS-RP

- RADIATION PROTECTION Baseline Inspections 06/18/2001 06/22/2001 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2

PB1-FL

- FLOOD PROTECTION Baseline Inspections 07/23/2001 07/27/2001 Flood Protection Measures IP 7111106 1, 2

PS-RP

- RADIATION PROTECTION Baseline Inspections 08/06/2001 08/10/2001 Radiation Monitoring Instrumentation IP 7112103 1, 2

OL EP

- EMERGENCY PREPAREDNESS Baseline Inspections 08/13/2001 08/17/2001 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 08/13/2001 08/17/2001 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 08/13/2001 08/17/2001 Performance Indicator Verification IP 71151 1, 2

MB HS

- HEAT SINK Baseline Inspections 09/10/2001 09/14/2001 Heat Sink Performance IP 7111107B 1, 2

PS-RP

- RADIATION PROTECTION Other Routine 09/10/2001 09/14/2001 Operation Of An ISFSI IP 60855 1, 2 Baseline Inspections 09/10/2001 09/14/2001 Radiological Environmental Monitoring Program IP 7112203 1, 2 Baseline Inspections 09/10/2001 09/14/2001 Performance Indicator Verification IP 71151 1, 2

PB1-AW

- ADVERSE WEATHER Baseline Inspections 11/05/2001 11/09/2001 Adverse Weather Protection IP 7111101 1, 2

EB-SSDI

- SSDI PRE-INSPECTION VISIT Baseline Inspections 12/10/2001 12/14/2001 Safety System Design and Performance Capability IP 7111121 1, 2

PS-SEC

- SECURITY Baseline Inspections 01/07/2002 01/11/2002 Access Authorization Program (Behavior Observation Only)

IP 7113001 1, 2 Baseline Inspections 01/07/2002 01/11/2002 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization)

IP 7113002 1, 2 Baseline Inspections 01/07/2002 01/11/2002 Performance Indicator Verification IP 71151 1, 2

EB SSDI

- SSDI INSPECTION Baseline Inspections 01/14/2002 01/18/2002 Safety System Design and Performance Capability IP 7111121 1, 2

EB SSDI

- SSDI INSPECTION Baseline Inspections 01/28/2002 02/01/2002 Safety System Design and Performance Capability IP 7111121 1, 2

OL PREP

- INITIAL EXAM PREP Not Applicable 01/28/2002 02/01/2002 EXAMS AT POWER FACILITIES V23188

1 MB 50.59

- 50.59 Baseline Inspections 02/11/2002 02/14/2002 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2

OL EXAM

- INITIAL EXAM Not Applicable 02/11/2002 02/15/2002 EXAMS AT POWER FACILITIES V23188

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 McGuire 06/01/2001 10:27:38 Inspection / Activity Plan 06/01/2001 - 05/31/2002 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number

PS-RP

- RADIATION PROTECTION Baseline Inspections 02/25/2002 03/02/2002 Radiation Monitoring Instrumentation IP 7112103 1, 2 Baseline Inspections 02/25/2002 03/02/2002 Performance Indicator Verification IP 71151 1, 2

PS-RP

- RADIATION PROTECTION Baseline Inspections 03/11/2002 03/15/2002 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 03/11/2002 03/15/2002 ALARA Planning and Controls IP 7112102 1, 2

LIC REN

- DUKE LR Other Routine 03/25/2002 03/29/2002 License Renewal Inspection IP 71002 1, 2 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.