ML19256E430

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-369/79-30 & 50-370/79-17 on 790821-24.No Noncompliance Noted
ML19256E430
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 09/12/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19256E426 List:
References
NUDOCS 7911050195
Download: ML19256E430 (2)


See also: IR 05000369/1979030

Text

.

.

o

UNITED STATES

8

NUCLEAR REGULATORY COMMISSION

4

o

e

REGION 11

\\ . . . . . e#

101 MARIETTA sT N.W..sulTE 3100

ATLANTA, G EORGIA 3o3o3

'

In Reply Refer To:

RII:NE

50-369/79-30

50-370/79-17

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 33189

Charlotte, NC 28244

Gentlemen:

This refers to the inspection conducted by N. Economos of this of fice on

August 21-24, 1979, of activities authorized by NRC Construction Permit Nos.

.

CPPR-83 and CPPR-84 for the McGuire facility, and to the discussion of our

findings held with G. W. Grier, III, at the conclusion of the inspection.

Areas examined during the inspection and our finding 3 are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters ami unresolved items. The status of these items is discussed

in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) helieve to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such informt. tion from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is pcoprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

~

1255

322

jf C)[

7911050

.

.

Duke Power Company

-2-

,

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

C. E. Murphy, Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

Inspection Report Nos. 50-369/79-30,

and 50-370/79-17

cc w/ enc 1:

M. D. McIntosh, Plant Manager

P. O. Box 488

Cornelius, NC 28031

J. C. Rogers, Project Manager

P. O. Box 33189

Charlotte, NC 28242

1255

323

.

4