Text
.
.
o
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
4
o
- e
REGION 11
\\ . . . . . e#
101 MARIETTA sT N.W..sulTE 3100
ATLANTA, G EORGIA 3o3o3
'
In Reply Refer To:
RII:NE
50-369/79-30
50-370/79-17
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 33189
Charlotte, NC 28244
Gentlemen:
This refers to the inspection conducted by N. Economos of this of fice on
August 21-24, 1979, of activities authorized by NRC Construction Permit Nos.
.
CPPR-83 and CPPR-84 for the McGuire facility, and to the discussion of our
findings held with G. W. Grier, III, at the conclusion of the inspection.
Areas examined during the inspection and our finding 3 are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters ami unresolved items. The status of these items is discussed
in the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) helieve to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such informt. tion from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is pcoprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
~
1255
322
jf C)[
7911050
.
.
Duke Power Company
-2-
,
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
.
C. E. Murphy, Chief
Reactor Construction and Engineering
Support Branch
Enclosure:
Inspection Report Nos. 50-369/79-30,
and 50-370/79-17
cc w/ enc 1:
M. D. McIntosh, Plant Manager
P. O. Box 488
Cornelius, NC 28031
J. C. Rogers, Project Manager
P. O. Box 33189
Charlotte, NC 28242