IE Insp Repts 50-369/79-35 & 50-370/79-21 on 790926-28.No Noncompliance Noted.Major Areas Inspected:Control of Fire Stops,Ie Bulletins & Circulars,Const Status & Noncompliances
ML19270H722
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 10/23/1979
From: Bryant J, Hunt M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19270H719 List:
References
50-369-79-35, 50-370-79-21, NUDOCS 8001020694
Download: ML19270H722 (4)


Text

  1. '

'o,,

UNITED STATES

!

NUCLEAR REGULATORY COMMISSION

,,

,

$

.E REGION il

O 101 MARIETTA ST N.W. SUITE 3100 o

ATLANTA, C EoRGIA 303o3

.....

Report Nos. 50-369/79-35 and 50-370/79-21 Licensee: Duke Power Company 422 South Church Street Charlotte, North Carolina 28242 Facility Name: McGuire Nuclear Station Docket Nos. 50-369 and 50-370 License Nos. CPPR-83 and CPPR-84 Inspection at McGuire site near Charlotte, North Carolina and Corporate offices in Charlotte, North Carolina Inspector:

/#'/J-9f M. 'D. li6nt

/

Date Signed Accompanying Fersonnel:

A. R. Herdt Approved by.

/4-2 3 2'/

A J. C. Bryant, Sectio [ Chief,RCESBranch Date Signed SUMMARY Inspection on Septerher 26-28, 1979 Areas Inspected This routine, unannounced inspection involved 16 inspector-hours onsite in the areas of control of fire stops, IE Bulletins and Circulars, construction status and noncompliances.

Results Of the areas inspected, no items of noncompliance or deviations were identified.

1674 082 8 00102o $9

.

.

DETAILS 1.

Persons Contacted Licensee Employees

  • G. W. Grier, Project Engineer
  • J. R. Wells, Corporate QA Manager
  • E. B. Miller, Project Senior QA Engineer
  • M. S. Starnes, Construction QC
  • K. S. Kisida, QA Engineer, Electrical
  • G. B. Robinson, QA Engineer, Hechanical W. J. Foley, Jr., Principal Engineer, Electrical Division D. L. Canup, Design Engineer, Mechanical & Nuclear Division W. H. Bradley, QA Manager, Engineering J. M. frye, Senior QA Supervisor F. E. Nash, QA Auditor W. O. Henry, QA Manager, Construction
  • Attended exit interview 2.

Exit Interview The inspection scope and findings were summarized on September 28, 1979 with those persons indicated in Paragraph 1 above.

The licensee reported that during inspection of pipe hangers they have discovered nuts welded to the back of mounting plates to simulate an anchor bolt. They further stated that this condition appeared localized to only a few pipe hangers.

They are investigating the matter and consider it part of the earlier reported CDR 369/79-22-02.

The licensee also advised the inspector that the environmental qualifica-tions of equipment that could be subjected to conditions caused by pipe breaks is being evaluated.

Should they determine that a deficiency exists they will report accordingly.

3.

Licensee Action on Previous Inspection Findings (Open) Infraction 370/79-18-01, Modification to safety related motors without approved drawings. The inspector held discussions with the electrical engineering personnel regarding this item. The licensee advised the inspector that training sessions have been and will continue to be held to review engineering procedures.

4.

Unresolved Items Unresolved items were not identified during this inspection.

1674 083

.

-2-

,

5.

Independent Inspection Effort The inspector examined several cable penetration fire stops. These fire stops are inspected by the criteria set forth in QA Procedure M-53, Fire Protection-Related System Installation Inspection.

The inspector noted cases where the seal had been breached to install additional cables.

A review of Construction Procedure #547 Procedure for the identification and release of penetrations requiring firestop installation, Instruction Serial No. 007, Breaching and repair of cable penetration fire stop installations, and records generated by these procedures indicated that the licensee has the methods for controlling the breaching and followup repair of cable penetration fire stops.

Within the areas inspected, no items of noncompliance or deviation were identified.

6.

IE Bulletins (IEB) and IE Circulars (IEC)

(Closed) IEB 79-05,79-05A, 79-05B, Nuclear Incident at Three Mile Island and 79-06,79-06A, 79-06B, Review of Operational Errors and System Misalign-ments Identified during the Three Mile Island Incident.

The licensee acknowledged reciept of these bulletins which required no response.

(Closed) IEB 78-08, Radiation levels from Fuel Element Transfer Tubes.

This bulletin did not require a response from the licensee.

(Closed) IEB 78-14 Deterioration of Buna-W componets in ASCO solenoids.

This bulletin applied to BWR's, no response is required.

(Closed) IEC 78-18 UL fire test.

This circular was issued for information only.

(Closed) IEB 79-04, Incorrect weights for swing check valves manufactured by Velan Engineering Corporation. The licensee advised RII in their May 29, 1979 letter that no v31ves manufactured by Velan Engineering Corporation are in use at McGuire Nuclear Station.

(Closed) IEB 79-08, Events relevant to boiling water power reactors identi-fied during Three Mile Island incident.

This bulletin does not apply to this site.

(Closed) IEB 79-09 Failures of GE Type AK-2 circuit breaker in safety related systems. The licensee's letter to RII dated July 9, 1979 informed NRC that none of this type breaker is in use or planned for use at McGuire Nuclear Station.

(Closed) IEB 79-12 Short period scrams at BWR facilities.

This bulletin does not apply to this site.

(Closed) IEC 79-02 Failure of 120V vital AC power supplies. The licensee has reviewed this circular and advised the inspector that after review of this circular they do not anticipate problems in this area.

1674 084

-

-3-

.

(Closed) IEC 79-08, Attempted extortion - low enriched uranium.

This circular does not apply to this site.

(Closed) IEC 79-10, Pipefittings manufactured from unacceptable material.

The licensee reported no fittings of this type are used at McGuire.

(Closed) IEC 79-11, Design / construction interface problem.

Duke Power Company designs and erects its own plants. A review of the interface between construction-design has been made to insure that controls are effective.

(Closed) IEC 79-12, Potential diesel generator turbocharger problem.

The brand of diesel generator listed in the circular is not used at McGuire Station.

(Open) IEB 79-13, Cracking in feedwater system piping.

Discussions were held with the licensee regarding the RT examination of feedwater and auxil-iary feedwater nozzles at the steam generators.

The licensee stated that the auxiliary feedwater nozzles vill be radiographed using a sensitivity of 2T. RII will continue to followup.

7.

Inspector Followup Items (IFI)

(Closed) IFI 369/78-26-02 & 370/78-12-03, Engineering assurance procedures.

The inspector interviewed one auditor and reviewed the documentation for the training session to reinstruct the QA audit division on followup and verification of corrective actions before closing an audit findi.g.

(Closed) IFI 370/79-09-01, Warehouse No. 2 nonconforming area designation.

The area has been caged off to provide sergregation uf nonconforming items.

Further the welding rca riorage has been moved from warehouse No. 2 to No.

4 where better control of large quantities of similar materials can be maintained.

1674 085