IR 05000369/1979026

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-369/79-26 & 50-370/79-14 on 790625-28.No Noncompliance Noted
ML19274F998
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 07/13/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19274F994 List:
References
NUDOCS 7908270297
Download: ML19274F998 (2)


Text

t

[

'o UNITED STATES

'

NUCLEAR REGULATORY COMMISSION

  • f"*,[,j

3,(

REGION 11

,,

e r,

101 MARIETT A sT., N.W.. sulf E 3100 o

I ATLANTA, GEORGI A 30303

' \\." ' e p sn

-

In Reply Refer To:

RII:TDG 50-369/79-26

,

50-370/79-14

Duke Power Company ATTN:

W. O. Parker, Jr.

Vice President, Steam Production P. O. Box L 189 Charlotte, North Carolina 28242 Gentlemen:

refers to the inspection conducted by T. D. Gibbons of this office on This 1979, of activities authorized by NRC Construction Permit Nos.

June 25-28, CPPR-83 and CPPR-84 for the McGuire Nuclear Plant facility, and to the discussion of our findings held with J. C. Rogers at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the Within these areas, the inspection consisted of enclosed inspection report.

selective examinations of procedures and representative records, interviews with personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed If this inspection report will be placed in the NRC's Public Document Room.

contains any information that you (or your contractor) believe to be report proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a If we do not hear from you in this regard within separate part of the document.

the specified period, the report will be placed in the Public Document Room.

Should you have any questions conceru ng this letter, we will be glad to discuss

_

them with you.

Sincerely, b

C. E. Hurphy, Chief Reactor Construction and Engineering Support Branch

^

79U8270277

-

.

.

.

Ab I O IIS Duke Power Company-2-

' -

Enclosure:

Inspection Report Nos.

50-369/79-26 and 50-370/79-14 cc w/ enc 1:

M. D. McIntosh, Plant Manager P. O. Box 488 Cornelius, North Carolina 28031 J. C. Rogers, Project Manager P. O. Box 33189 Charlotte, North Carolina 28242

.-

/

0