BSEP-87-1079, Special Rept 2-SR-87-001:on 870824,Unit 2 Fire Barrier Limiting Condition for Operation Was Initiated on Fire Door 003 as Door Would Not Close & Latch Properly.Cause Not Stated.Door Repaired & Returned to Svc

From kanterella
Jump to navigation Jump to search
Special Rept 2-SR-87-001:on 870824,Unit 2 Fire Barrier Limiting Condition for Operation Was Initiated on Fire Door 003 as Door Would Not Close & Latch Properly.Cause Not Stated.Door Repaired & Returned to Svc
ML20235H290
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 09/22/1987
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
2-SR-87-001, 2-SR-87-1, BSEP-87-1079, NUDOCS 8710010005
Download: ML20235H290 (1)


Text

.

n.- .y ,

Q2)[ .

a L

Carolina Power & Light Company - 1- 11 Brunswick Steam Electric-Plant' BI SEP 25' p'I *. 08 1

~P. 0.. Box-10429.

'Southport,'NC 28461_0429. ]?

September 22, 1987 '!

-i 0 . FILE: B09-13510C LSERIAL: BSEP/87-1079 Dr. .J. Nelson Grace, Administrator:

U.S. Nuclear Regulatory Commission W

Suite 2900  !

101 Marietta Street NW- 't l

' Atlanta, GA' -30323 BRUNSWICK STEAM ELECTRIC PLANT UNIT 2 DOCKET NO. 50-324 LICENSE NO. DPR-62 SPECIAL' REPORT PER TECHNICAL SPECIFICATION 3.7.8 AND PURSUANT TO TECHNICAL SPECIFICATION 6.9.2 (2-SR-87-001).

Dear Dr. Grace:

On August 24, 1987, at 0430 hours0.00498 days <br />0.119 hours <br />7.109788e-4 weeks <br />1.63615e-4 months <br />, a Unit 2 fire barrier LCO was' initiate'd on penetration seal No. DG-1-096, fire door 003. This door, which'is located on the 1-foot 6-inch elevation of the Units 1 and 2 common diesel generators' four-day fuel oil storage rooms, provides personnel .ac~ cess :between rooms 2 ..

and 3. The LCO.was initiated to repair the door as it would not.close and latch properly. Discovery of.the door inoperability wasl.made'during performance of weekly Diesel Generator Building Swinging Fire Door-Inspection,-

Periodic Test (PT)-34.1.3.0. On August .31, '1987, at 0430 hours0.00498 days <br />0.119 hours <br />7.109788e-4 weeks <br />1.63615e-4 months <br />', the specified.' -

l seven-day time frame of the involved LCO.was exceeded. . Repairs to the subject-door were completed on August 31, 1987, and at 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br />, the LCO was

[:

canceled and the door was returned to. service.

]

Very truly yours,-

Q. - -

C. R. Dietz,-General Manager j Brunswick. Steam. Electric Plant ij l

MJP/cj.

Lj Enclosure q cc: .NRC Document Control Desk .

I

$ & Q >g

,,w 4$a --