BSEP-83-3650, RO 2-83-97:on 831108,insp Revealed That Four Welds Had Indications of Intergranular Stress Corrosion Cracking. Evaluation of Corrective Actions Still in Progress

From kanterella
(Redirected from BSEP-83-3650)
Jump to navigation Jump to search
RO 2-83-97:on 831108,insp Revealed That Four Welds Had Indications of Intergranular Stress Corrosion Cracking. Evaluation of Corrective Actions Still in Progress
ML20081M831
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 11/08/1983
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
BSEP-83-3650, RO-2-83-97, NUDOCS 8311170392
Download: ML20081M831 (1)


Text

I Telecopied 11-8-83 CD&L Carolina Power & Light Company OVfej Brunswick Steam Electric Plant P. O. Box 10429 ./8 Southport, NC 28461-0429 November 8, 1983 FILE: B09-13510C SERIAL: BSEP/83-3650 Mr. James P. O'Reilly, Administrator U. S. Nuclear Regulatory Commission Region II, Suite 3100 101 Marietta Street N.W.

Atlanta, GA 30303 .

BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-324 LICENSE NO. DPR-62 CONFIRMATION FACSIMILE OF AN IMMEDIATELY REPORTABLE EVENT (2-83-97)

Dear Mr. O'Reilly:

This confirms the on-site conversation at 0800 on November 8, 1983, between Mr. R. M. Poulk, Jr. , Carolina Power & Light, and Mr. Paul Bemis of your office, concerning an immediately reportable event per Technical Specification 6.9.1.8c.

While performing inspections on the Unit No. 2 recirc piping required by IE Bulletin 83-02, and the NRC order to Carolina Power & Light Company dated October 26, 1983, it was determined that four welds had indications of IGSCC.

Two of these welds (2-B32-12"-BR-G-4 and 2-B32-12"-BR-K-3) were located on 12-inch risers. The other two welds which showed IGSCd indications were 2-B32-28"-A-8 and 2-B32-28"-A-14. These welds are located on 28-inch piping on elbow-to-valve welds; one each on the suction valve and discharge valve.

Evaluation of correctivecaction for these four indications is still in progress, and will be addressed in the 14-day report.

Very truly yours, Osy C. R. Dietz, General Manager Brunswick Steam Electric Plant RMP/mcg/LETCG2 Enclosure cc: Mr. R. C. DeYoung g ,- ,