3F1186-11, Monthly Operating Rept for Oct 1986

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1986
ML20213F290
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/31/1986
From: Graham D, Eric Simpson
FLORIDA POWER CORP.
To: Taylor J
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F1186-11, NUDOCS 8611140131
Download: ML20213F290 (6)


Text

.

o OPERATING DATA REPORT DOCKET NO. 50-302 DATE 11/4/86 COMPLETED BY D. Graham TELEPHONE (9041 795-3802 OPERATING STATUS

1. Unit Name: Crystal River Unit 3 Notes l 2. Reporting Period: 10/1/86 - 10/31/86
3. Licensed ThermalPower(MWt): 2544
4. Nameplate Rating (Gross MWe): 890
5. Design Electrical Rating (Net MWe): Es25
6. Maximum Dependable Capacity (Gross MWe): 860
7. Maximum Dependable Capacity (Net MWe): 821
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

NA

9. Power Level To Which Restricted.lf Any (Net MWe): NA
10. Reasons For Restrictions,If Any: NA This Month Yr..to Date Cumulative II. Hours in Reporting Period 745 7296 84480
12. Number Of Hours Reactor Was Critical 745 3242.9 53543.9
13. Reactor Resene Shutdown Hours 0 0 1280.3
14. Hours Generator On-Line 745 3222.2 52313
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1666957 7431859 117900724 -
17. Gross Electrical Energy Generated (MWH) 575094 _ _ ,, 2561000 40317302
18. Net Electrical Energy Generated (MWH) 545780 2432472 38292058
19. Unit Service Factor 100 % 44.2 % 61.9 %
20. Unit Availability Factor 100% 44.2 % 61.9%
21. Unit Capacity Factor (Using MDC Net) 89.2% 40.6% 56.7 %
22. Unit Capacity Factor (Using DER Net) 88.8 % 40.4 % 54.9 %
23. Unit Forced Outage Rate 0% 55.8 % 23.3 %
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:

NA

25. If Shut Down At End Of Report Period. Estimated Date of Startup: NA
26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIA L CRITICALITY I/14/77 INITI A L ELECTRICITY 1/30/77 COMMERCIAL OPER ATION 3/13/77 8611140131 861031 PDR ADOCK 05000302 R PDR (9/773

/p

s AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-302 UNIT F LCRP-3 DATE I1/4/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH October 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) (MWe-Neti j 820 g7 499 2 R13 18 671 3 817 g9 813 4 810 811 20 5 8II 584 21 6 808 22 548 7 808 23 594 8 805 610 24 9 807 598 25 10 814 26 588 gg 820 27 785 12 787 783 28 13 808 766 29 34 790 773 30 15 582 3g 822 16 572 INSTRUCTIONS On this format. list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9 /77 )

, , . - . , - , . , - , m ,, .-. . . - - -n , . . , . -

KE 50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS F LC R P-3

, NAME DATE 11/3/86 .

COMPLETED BY S. A. Stewart REPORT MONTH 10/8 f' (904) 795-3802 TELEPHONE

- E c No. Date g

.$ E gg 3

ij j Yl jj$

Licensee Event p,

p f'.8 Cause & Corrective Action to mo gO H

$E 5 35c e

Report #

o o Prevent Recurrence g

O 86-21 861014 F 0.0 A 5 NA HC llTEXCII Reduced power to locate and repair a condenser saltwater leak in the "B" waterbox.

86-22 861016 F 0.0 A 5 NA IIC IITEXCII Reduced power to locate and repair

. a condenser saltwater leak in the "B" and "C" waterboxes.

86-23 861017 S 0.0 F 5 NA IIII VALVEX Test main feedwater block valve FWV-29.

Reduce power to test.

86-24 861017 F 0.0 A 5 NA IIC IITEXCII Reduced power to locate and repair a condenser saltwater leak in the "A" waterbox.

86-25 861021 F 0.0 A 5 NA IIC llTEXCII Reduced power to locate and repair a condenser saltwater leak in the "C" waterbox.

86-26 861023 S 0.0 B 5 NA Z7, ZZZ7,Z7. Performed eddy-current test of "A" waterbox condenser tubes.

I 2 3 4 F: Forced Reason: Method Exhibit G . instructions S: Scheduled A-Equiprnent Failure (Explain) for Preparation of Data B-Maintenance of Test [_ D i scr., Entry Sheets for Licensee C Refueling 3-Auto scram Event Report (LER) File (NURI.G.

D-Regulatory Restriction 4-continued 0161)

E-Operator Training & Ucense Examination 5-Reduced Load F Administrat'ive 9-Other G-Operational Error (Explain) Exhibit I - Same Source (9/77) II-Other (Explain)

DOCKET NO. 50-302 .

UNIT SHUTDOWNS AND POWER REDUCTIONS F LC R P-3 UNIT NAME DATE 11/3/86 10/86 (Cont.) COMPLETED BY S. A. Stewart REPORT MONTH TELEPHONE (904)795-3802 n.

- E E I

, .E ? 'h j Ei Licensee ,E g ge, cause & Correceive No. Date 3, 5g 4 .2 s 5 Event gg pO Action to H

$2 5 <

5, c$ Report # mU u

o Prevent Recurrence o

86-27 861029 F 0.0 A 5 NA IIC IITEXCII Reduced power to locate and repair a condenser saltwater leak in the "D" waterbox.

J I 2 3 4 F: Forced Reason: Method Exhibit G Instructions S: Scheduled A. Equipment Failure (Explain) ,_g for Preparation omata B-Maintenance of Test 2-M $ *i1 Scram Entry Sheets for Licensee 7,

C-Refueling 3-Auto scram Event Report (LER) File (NURI G-D-Regulatory Restriction 4-continued 0161)

E-Operator Training & License Examination 5-Reduced Load F-Administrat'ive 9-Other $

G-Operational Error (Explain) Exhibit I - Same Source (9/77) II-Other (Explain)

4 -

MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 11/3/86 COMPLETED BY S. A. Stewart TELEPHONE (904) 795-3802 MONTH October,1986

SUMMARY

STATEMENT:

Crystal River Unit #3 remained on-line the entire month and set a new plant record for consecutive days on-line.

Condenser salt leaks caused 6 power reductions during the month.

f

)

e f

l

-.-.-.--,-,-.,c-,c-,_-. - _ _ - -,- - - - , . _ ~ , _ - , - -- - . , _ - , . , - - - . . , , . , , . , . - - - . - - - - - - . . . _ , - . -.-- - - , , . - - , . , - - . . . -

J

  • e OO

%.aw '

Florida Power CORPORAT6ON November 7, 1986 3F1186-11 Mr. James M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Subj ect: Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 October 1986 Monthly Operating Report. These reports are submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, E. C. Simpson Director, Nuclear Operations Engineering and Licensing AEF/feb

' Attachments xc: Dr. J. Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U.S. Nuclear Regulatory Conmission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323

[6LY GENERAL OFFICE: 3201 Thirty fourth Street South

  • P.O. Box 14042
  • St. Petersburg, Florida 33733 * (813) 866-5151 g A Florida Progress Company