Monthly Operating Rept for May 1985
ML20126B236
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/31/1985
From: Graham D, Stewart S, Westafer G
FLORIDA POWER CORP.
To: Taylor J
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F0685-08, 3F685-8, NUDOCS 8506140041
Download: ML20126B236 (5)


Text

, 4 OPERATLNG DATA REPORT DOCKET NO. 50-302 DATE 6-4-85 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 OPERATING STATUS crystal River Unit 3 Notes

1. Unit Name:
2. Reporting Period: 5/1/85 - 5/31/85.
3. Licensed Thermal Power (MW:): 2544
4. Nameplate Rating (Gross MWe): 890
5. Design Electrical Rating (Net MWe):

825 860

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe): 821
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

NA

9. Power Level To Which Restricted. lf Any (Net MWe): NA
10. Reasons For Restrictions,If Any: NA This Month Yr..to Date Cumulative i1. Hours In Reporting Pr.riod 744 3623 72047
12. Number Of Hours Reactor Was Critical 0 1608.3 47524
13. Reactor Reserve Shutdown Hours 0 0 1280.3
14. Hours Generator On-Line 0 1606.5 46524,3
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 0 2924173 104586058
17. Gross Electrical Energy Generated (MWH) 0 _ _ , , ,

1014639 35741856

18. Net Electrical Energy Generated (MWH) 0 954730 33950741
19. Unit Sersice Factor 07. 44,37. 64.67.
20. Unit Availability Factor 07. 44.37. 64.67.
21. Unit Capacity Factor (Using MDC Net) 07. 32.17. 59.37,
22. Unit Capacity Factor (Using DER Net) 07. 31.97. 57.17.
23. Unit Forced Outage Rate _

n7. 07. 10.67.

24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Each):

Refueling outage which began 3/9/85 and is scheduled to last 20 uceks.

25. If Shut Down At End Of Report Period. Estimated Date of Startup: July 27, 1985
26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIAL CRITICALITY 1/14/77 INITI A L ELECTRICITY 1/30/7'r COMMERCIAL OPER ATION 3/13/77 8506140041 850531 POR R

ADOCK 05000302 PDR g 14/771 f\

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-302 UNIT FLCRP-3 DATE 6-4-85 COMPLETED BY _ D. Craham TELEPHONE (904) 795-3802 MONTH May DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net) (MWe Neti 1 0 17 0 2 18 3 19 4 20 5 21 6 22 7 23 8 24 9 25 10 26 ll 27 12 28 13 29 14 30 15 31 _

\/

16 \/

INSTRUCTIONS On this format. list the average daily unit power leselin MWe Net fo each day in the reporting month.Coinpute to the nearest who:e nwgswatt.

(9 /77 )

L

DOCKET NO. 50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS FLCRP-3 UNIT N AME DATE 6/3/85 COMPLETED BY A - Stewart REPORT MONTil Mav (onai 70s-tan?

TELEPHONE

- E E

-, 5? 3 d $ ~4 I scemcc ,E-r, {%~

Cause & Corrective

%. Ilate & 5? 4 is5 I: vent 3' c- $ Attnen to

  • yE E e~

~

g =! Repew # m' O u

h' Present Recurrence 6

85-06 850308 S 744.0 C 4 NA NA NA Refueling Outage Continues I 2 3 4 F: Forced Reasim: Method. Exlubit G -Instructiims S: Ssheduled A-Equipment Failure (Esplam) 1 -Manual for Preparati<m of Data B. Maintenance of Test 2 Enual Scram. Entry Sheets for Licensee C-Refueling 3 Autonutic Scram. Event Report (LER) Fde tNURI G-D Regulatory Restrictiim 4-Other i E splain) 01611 E-Operator Training & License I xaminatism F-Admir.:st rative 5 G-Operatumal I ivor I E splain) I shibit I - Same Source (9/77) I!4): hen Iliplaml

r'

o. ..

MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET No. 50-302 UNIT FLCRP-3 DATE 6/3/85 COMPLETED BY S.' A. Stewart TELEPHONE (904) 795-3802 MONTH May 1985

SUMMARY

STATEMENT:

Crystal River 3 remains shutdown for refueling and maintenance.

4

e.

b o.

a i 00 o'

.e..

t Power C 0L POR ATION 1985 June 3F06857'08 Mr. James M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 May 1985 Monthly Operating Report. These reports are submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, ,

/

l '

/ t i G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management Harper (F01)3-3 Attachments cc: Dr. J. Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 j i i GEN ERAL OFFICE 3201 Thirty fourth Street South e P.O. Box 14042, St. Petersburg, Florida 33733 e 813-866-5151