1CAN078202, Responds to NRC Re Violations Noted in IE Insp Rept 50-313/82-13.Corrective Actions:Procedure 1622.026 Implemented to Require Beta Surveys Prior to Personnel Entry Into Steam Generators

From kanterella
(Redirected from 1CAN078202)
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp Rept 50-313/82-13.Corrective Actions:Procedure 1622.026 Implemented to Require Beta Surveys Prior to Personnel Entry Into Steam Generators
ML20062L015
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/08/1982
From: John Marshall
ARKANSAS POWER & LIGHT CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20062K994 List:
References
1CAN078202, 1CAN78202, NUDOCS 8208180096
Download: ML20062L015 (4)


Text

'

ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK. ARKANSAS 72203 (501)371-4000 July 8, 1982 1CAN078202 ,k a.

j -

h Mr. W. C. Seidle, Chief f M 26g f Reactor Project Branch #2 U. S. Nuclear Regulatory Commission

/k %h a Plaza Drive, Suite 1000 Arlington, Texas 76011

SUBJECT:

Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Response to Inspection Report 50-313/82-13 (File: 0232)

Gentlemen:

We have reviewed the Items c,f Noncompliance included in the subject report. Attached is our response to the " Notice of Violation" included in this report.

Very truly yours, l

/scJohnManager,R. Marshall Licensing JRM:GAC: sc r!){

Attachment cc: Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. Norman M. Haller, Director i Office of Management & Program Analysis l U. S. Nuclear Regulatory Commission l Washington, D. C. 20555 l

l '

l 8208180096 820813 gDRADOCK05000 ygygen y,oote soum uTitiries sysTeu t

NOTICE OF VIOLATION Based on the results of an NRC inspection conducted during the period of June 1-3, 1982, and in accordance with the NRC Enforcement Pc'.cy (10 CFR Part 2, Appendix C), 47 FR 9987, dated March 9, 1982, the following violations were identified:

1. Failure to Perform an Adequate Survey for Beta Radiation 10 CFR 20.201(a) defines (survey) as "an evaluation of the radiation hazards incident to the... presence of radioactive materials or other sources of radiation under a specific set of conditions. When appropriate, such evaluation includes... measurements of levels of radiation... present." 10 CFR 20.201(b) requires that the licensee shall make such surveys as necessary to comply with the other regulations of 10 CFR 20.

Contrary to the above, the licensee failed to adequately measure and evaluate the radiation hazard associated with beta radiation prior to maintenance personnel entering the lower primary manway area of the Unit 1 "A" steam generator on May 31, 1982. Specifically, the radiation survey performed in the lower primary manway area determined that the magnitude of the beta radiation field near the "A" steam generator lower tubesheet was greater than that which could be measured using the available survey instrument (the dose-rate indication went offscale high on the R0-2A beta gamma survey instrument). However, the licensee made no further effort to measure or evaluate the beta radiation hazard prior to permitting access to this area by maintenance personnel.

This is a Severity Level IV violation. (Supplement IV.D)

(313/8213-01)

RESPONSE

After the Health Physics Superintendent was informed of the offscale beta reading, a TLD was placed at the tubesheet area to determine dose rates

! prior to allowing subsequent entries into the lower primary manway area of Unit 1 "A" Steam Generator. The beta dose was determined to be 17.7 i

rad /hr from the TLD. It should be noted that all personnel who entered j the steam generator wore multiple TLD's which were processed after each entry into the Reactor Building.

l In order to prevent further occurrences, Procedure 1622.026, " Health Physics Requirements for Steam Generator Entries" was reviewed and i

approved by the Plant Safety Committee on June 23, 1982. This procedure requires that beta surveys be performed prior to allowing personnel entry into the steam generators. In addition, the HP Technician who obtained I

I L _ . _ _ _

, the offscale reading, along with other Health Physics personnel, have been instructed that when such a reading is obtained, the detector should be moved away from the radiation source until an onscale reading is obtained and that a TLD should be used to measure the radiation dose where the offscale reading was obtained. It has also been reemphasized to Health Physics personnel that personnel entries into steam generators or other areas shall not be permitted until the radiological hazards of those areas have been determined.

HP Technicians will be instructed in the use and requirements of Procedure 1622.026, " Health Physics Requirements for Steam Generator Entries" by July 19, 1982.

2. ALARA Committee Review Not Performed as Required Unit 1 Technical Specification 6.8.1 requires that written procedures shall be established, implemented, and maintained covering... a. The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33...

Station Administrative Procedure 1000.33, "AN0 ALARA Manual," has been established in accordance with this Technical Specification.

Procedure 1000.33 requires, in part, that an ALARA Committee, with specified membership, review the work package associated with a job that is estimated to involve over 10 man-rem total 2xposure. This review is to be a Category III review, which entails a higher degree of preplanning than either a Category I or Category II review, involves a formal ALARA Committee meeting, and requires an additional ALARA checklist (Form 1000.33C) be used as an agenda for the review and to serve as formal documentation of the completed Category III review.

Contrary to the above, the licensee did not complete a Category III ALARA review as evidenced by the failure to complete a Form 1000.33C ALARA checklist. and as substantiated by discussions with licensee representatives for the Unit 1 "A" steam generator repair work during the period May 27 through June 2, 1982. The estimated total exposure for this activity was approximately 50 man-rem, which was based upon measured radiation levels inside the steam generators and the actual scope of the work involving plugging 10 steam generator tubes. However, the licensee's preliminary estimate for total exposure, based upon estimated lower radiation levels and plugging one steam generator tube, was 2.5 man-rem, and only a Category II ALARA review was performed. This review was not revised to a Category III review to reflect the increased radiation levels that were measured and the increased scope of the work to be performed.

This is a Severity Level IV violation. (Supplement IV.D)

(313/8213-02)

. RESPONSE The current ALARA and Radiation Work Permit (RWP) procedures do not clearly address the situation of when to terminate a RWP and require a new ALARA review due to an increased man-rem estimate for increased radiation levels or increased job scope. When the violation was identified, the repair work had been completed; therefore, no immediate corrective action could be taken.

To prevent further occurrences, ALARA and RWP procedural changes are being made to require the following:

(1) Notification of the Health Physics Superintendent and ALARA Committee Chairman of major scope changes or radiation level changes.

(2) Daily notification of the Health Physics Superintendent and ALARA Committee Chairman of the man-rem status of RWP's where dose rates exceed 1 rem /hr or of jobs using 5 man-rem / day.

(3) Termination of the RWP and a new ALARA review when the accumulated man-rem of a job exceeds 150% of the limit for the ALARA category of the RWP.

The procedure changes will be implemented and Health Physics personnel will be trained in their use by August 15, 1982.

l l

l l

l l