Issue date | Title | Topic | |
---|---|---|---|
ML20236B736 | 20 October 1987 | Advises That LER 369/87-20 Re RHR Pump Being Inoperable for Greater than 72 H Will Be Submitted on 871027,due to Unresolved Concerns | |
05000369/LER-1984-030, Suppl to LER 84-030:review Revealed Installation Error That Would Result in Failure of Upper Head Injection Accumulator Discharge Valves to Isolate on Low Level.Analysis of Safety Significance & Encl | 19 December 1984 | Suppl to LER 84-030:review Revealed Installation Error That Would Result in Failure of Upper Head Injection Accumulator Discharge Valves to Isolate on Low Level.Analysis of Safety Significance & Encl | Stroke time |
05000369/LER-1984-024, Revised Page 6 to LER 84-024-01,providing Corrective Actions.Relay House Emergency Lighting Improved,Operating & Maint Activities Reviewed for Potential Impact on Offsite Power & Switchyard Computer Will Be Replaced by Mar 1988 | 9 November 1984 | Revised Page 6 to LER 84-024-01,providing Corrective Actions.Relay House Emergency Lighting Improved,Operating & Maint Activities Reviewed for Potential Impact on Offsite Power & Switchyard Computer Will Be Replaced by Mar 1988 | Emergency Lighting |
ML20081M753 | 7 November 1983 | Ler 83-064/99T-0:on 831024,Westinghouse Notified Util of Potentially Defective Relays SA1.Relay Used in Class IE Switchgear for Diesel Generator Protection & May Cause False Trip Output to Diesel Generator.Caused by Mfg Deficiency | |
05000369/LER-1982-045 | 30 June 1982 | LER 82-045/03L-0:on 820527,HEPA & Carbon Adsorber Filters Periodic Test Revealed That Carbon Adsorber Filters on Auxiliary Bldg Ventilation Sys Failed to Pass Freon Penetration Test.Caused by Carbon Settlement | |
05000369/LER-1982-044 | 30 June 1982 | LER 82-044/03L-0:on 820526,HEPA & Carbon Adsorber Filters Periodic Test Revealed That Auxiliary Bldg Ventilation Sys Filters Failed to Pass Total DOP Penetration Test.Caused by Vibration | |
05000369/LER-1982-043 | 30 June 1982 | LER 82-043/03L-0:on 820520,HEPA & Carbon Absorber Filters Periodic Test Indicated Carbon Absorber Filter on Fuel Pool Ventilation Sys Failed to Pass Freon Penetration Test. Caused by High Humidity.Filters Replaced | |
05000369/LER-1982-042 | 30 June 1982 | LER 82-042/03L-0:on 820519,HEPA & Carbon Filters Periodic Test Revealed That HEPA after-filters on Train B of Annulus Ventilation Sys Failed to Pass Dioctyl Phthalate Penetration Test.Caused by Dirt in Filter | |
05000369/LER-1982-041 | 30 June 1982 | LER 82-041/03L-0:on 820513,HEPA & Carbon Absorber Filters Periodic Test Revealed That Carbon Absorber Filter on Train a of Annulus Ventilation Sys Failed to Pass Halogenated Hydrocarbon Penetration Test.Caused by Dirt in Filter | |
05000369/LER-1982-037 | 30 June 1982 | LER 82-037/03L-0:on 820513,while in Mode 1,performance of Nuclear Air Cleaning Sys Air Flow Measurement Periodic Test Revealed That Train a of Annulus Ventilation Sys Failed to Meet Flow Acceptance Criteria.Caused by Component Failure | |
05000369/LER-1982-019 | 30 March 1982 | LER 82-019/03L-0:on 820228,during Mode 4,performance of RCS Pressure Isolation Valve Leak Rate Test Determined That 3 Valves Failed Test.Caused by Failure of Valves to Seat Properly.Valves Disassembled & Repaired |