05000353/LER-1995-005, Forwards LER 95-005 Re Blowing of Primary Conatinment & Rv Isolation Control Sys Fuse Due to Malfunctioning +20 Vdc Power Supply

From kanterella
Jump to navigation Jump to search
Forwards LER 95-005 Re Blowing of Primary Conatinment & Rv Isolation Control Sys Fuse Due to Malfunctioning +20 Vdc Power Supply
ML20081J886
Person / Time
Site: Limerick Constellation icon.png
Issue date: 03/16/1995
From: Boyce R
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20081J889 List:
References
NUDOCS 9503280249
Download: ML20081J886 (1)


LER-2095-005, Forwards LER 95-005 Re Blowing of Primary Conatinment & Rv Isolation Control Sys Fuse Due to Malfunctioning +20 Vdc Power Supply
Event date:
Report date:
3532095005R00 - NRC Website

text

. . - . ,

Robert C. Coyca

.,,-- Plant Managw p . Um* rick Generating Stat,on

. adEb.

=r

. PECO ENERGY- "eco '" 'ar o ma>"<

Limerick Generating Stanon PO Box 2300 Sanatoga, PA 19464 4 920 215 3271200 Ext. 2000 s

10CFR 50.73 March'16, 1995 Docket No. 50-353 License No. NPF-85 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Licensee Event Renort-

~

Limerick Generatina Station - Unit 2

- - This LER reports an actuation of the Unit 2 Primary _

Containment and Reactor Vessel Isolation Control System (PCRVICS), an Engineered Safety Feature, as a result of the blowing of a PCRVICS fuse due to.a malfunctioning 20 VDC power supply.

Reference:

Docket No. 50-353 Report Number: 2-95-005 Revision Number: 00 Event Date: February 20, 1995 Report Date: March 16, 1995 Facility:- Limerick Generating Station P.O. Box 2300, Sanatoga, PA 19464-2300 This LER is being submitted pursuant to the requirements of 10CFR50.73(a)(2)(iv).

Very truly your i s.

DMS:cah cc: T. T. Martin, Administrator Region I, USNRC N. S. Perry, USNRC Senior Resident Inspector, LGS l

l n~- -

9503200249 950316 ,;

PDR ADDCK05000g53
S l

t