05000275/LER-1982-012, Forwards LER 82-012/01T-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-012/01T-0
ML20070L328
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 12/15/1982
From: Shiffer J
PACIFIC GAS & ELECTRIC CO.
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20070L331 List:
References
NUDOCS 8301030092
Download: ML20070L328 (1)


LER-2082-012, Forwards LER 82-012/01T-0
Event date:
Report date:
2752082012R00 - NRC Website

text

PACIFIC OAS AND E LE C T RIC C O M PANY FOW3 l 77 BEALE STREET

  • SAN FRANCISCO, CALIFORNIA 94106. (415) 7814211 TWX 910-372-6587 JAMES D SHIFFER DEPARTMENT OF NUCLE AR PLANT OPERATIONS NUCLEAM POWER GENERATION December 15, 1982 Mr. R. H. Engelken, Regional Administrator U.S. Nuclear Regulatory Commission, Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 Re: Docket No. 50-275, OL-DPR-76 Diablo Canyon Unit 1 Licensee Event Report 82-012/01T-0 Failure to Satisfy an Action Statement

Dear Mr. Engelken:

Pursuant to Section 6.9.1.12.b of the Technical Specifications, Appendix A to the Diablo Canyon Unit 1 Operating License, the enclosed Licensee Event Report is submitted concerning the failure to satisfy an Action Statement within the specified time limits.

This event has in no way affected rublic health and safety.

Sincerely,

~

h

%/

r4

'O M JDS:vk (9 d

.~. A Enclosure 'E

  • fa, e3 cc w/ enc: Mr. George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Wa shington, DC 20555 Director, Of fice of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 Service List 8301030092 821215 PDR ADOCK 05000275 g PDR  % 'M 63.-2'O