DCL-88-051, Forwards Rev 16 to Physical Security Plan.Rev Withheld

From kanterella
Jump to navigation Jump to search
Forwards Rev 16 to Physical Security Plan.Rev Withheld
ML20196H075
Person / Time
Site: Diablo Canyon  
Issue date: 03/04/1988
From: Shiffer J
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
DCL-88-051, DCL-88-51, NUDOCS 8803100072
Download: ML20196H075 (1)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ _ _

Pacific Gas and Electric Company 77 Beate Street James D. SNaer San Francisco,CA 94106 V<e President 415!973 4684 Naclear Poner Generaton TWX 910372 6587 March 4, 1988 PG&E Letter No. DCL-88-051 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Hashington, D.C.

20555 Re: Doct.et No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Char.ges to Revision 16 of the Physical Security Plan Gentlemen:

Enclosures 1 and 2 contain safeguards information regarding changes to the Diablo Canyon Power Plant Physical Security Plan.

These changes do not decrease the safeguards effectiveness of the Plan and are submitted pursuant to 10 CFR 50.54(p). identifies and describes the changes made in Revision 16 to the Plan. provides the change page for the Plan.

Changes are indicated with solid vertical lines in the right-hand margin.

Kindly acknowledge receipt of this material on the enclosed copy of this letter and return it in the enclosed addressed envelope.

Sincerely, s

9 tt-D.Shf/er cc:

B. A. Dettman R. F. Locke J. B. Hartin (2)

L. H. Shaffer (2)

R. G. Todaro J. D. Townsend CCC GONPRAC (w/o encls.)

i Enclosures 1962S/00llK/KAH/1650 gg "y SATGUARDS N:0RWQ0N When Separated from

o i!hAD0bk$5066$75 r

oco

+