ML16341F540

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Epips,Including Rev 17 to EP M-1 & EP M-6 & Rev 13 to EP G-2S1.W/900215 Release Memo
ML16341F540
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/30/1990
From: Womack L
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML16341F541 List:
References
DCL-90-035, DCL-90-35, NUDOCS 9002220106
Download: ML16341F540 (10)


Text

ACCELERATED DILUTION DEMON ON SYSTEM REGULATORY INFORMATION DISTRXBUTION SYSTEM (RIDS)

ACCESSXON NBR:9002220106 DOC.DATE: 90/01/30 NOTARXZED: NO DOCKET FACXL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga 05000275 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga 05000323 AUTH. NAME AUTHOR AFFILIATION WOMACK,L.F. Pacific Gas 6 Electric Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards public version of revised EPIPs,including Rev 17 to EP M-l,EP M-6 & Rev 13 to EP G-2S1.

DISTRXBUTION CODE: DF01D COPIES RECEIVED:LTR ENCL SIZE:=

TITLE: Direct Flow Distribution: 50 Docket (PD Avail)

NOTES:

~ 'D RECIPIENT CODE/NAME INTERNAL: NUDOCS-ABSTRACT COPIES LTTR ENCL 1 1 ID G

RECIPIENT CODE/NAME FILE 01 1 t

COPIES LTTR, ENCL 1

EXTERNAL: LPDR 1 '

1 NRC PDR ~ 1 1 NSIC 1 NOTE TO ALL "RIDS" RECIPIENTS:

h I

PLEASE HELP US TO REDUCE WASIZf CONTACT THE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 5 ENCL" 5

4 I ~

I

%0

) '

C

~ ~ a 1 ~

l~

~

l < <

P J ~ I P

~

E

p 7 goale Prie',

Pacific Gas and Electric Company Sa~ Fran".:s"o. i~ 9410E f/a

~ 'o 9'> '58 ag".',.'e=rGperat,-.'

January 30, 1990 PG&E Letter No. DCL-90-035 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Hashington, D.C. 20555 Re: Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Emergency Plan Implementing Procedures Update Gentlemen:

PGhE is submitting one copy of the Update to the Detailed Implementing Procedures for the Diablo Canyon Power Plant Units 1 and 2 Emergency Plan (Enclosure 2). Concurrently, two copies of the update are being submitted to the NRC, Region V office, and one copy is being submitted to the NRC Resident Inspector.

This update contains some privacy/proprietary information that is identified in Enclosure 1 and bracketed in accordance with NRC Generic Letter 81-27.

Kindly acknowledge receipt of this material on the enclosed copy of this letter and return it in the enclosed addressed envelope.

Sincerely, EP~~I ""

L. F. Homack Enclosures cc w/encs.: 3. B. Hartin/R. F. Fish (2) w/acknowledgement copy P. P. Narbut cc w/enc. 2 (cover only):

A. P. Hodgdon H. H. Mendonca H. Rood CPUC Diablo Distribution 3032S/0077K/B3B/1345

'Q(O)

PG&E Let No. DCL-90-035 ENCLOSURE 1 LOCATION OF PRIVACY/PROPRIETARY INFORHATION Diablo Canyon Emergency Plan Implementing Procedures:

EP M-1 "Non-Radiological Personnel In)ury or Illness," Revision 17, January 4, 1990, pages 1, 2, 4, and 16.

Attachments:

6.1 "Shift Supervisor Checklist for Non-Radiological Personnel Emergencies," (ll/89) page 1 of l.

6.2 "Medical Staff Checklist for Non-Radiological Personnel Emergencies," (ll/89) page 1 of 1.

EP H-6 "Nonradiological Fire," Revision 17, January 5, 1990, pages 2, 4, 5, 13, 14 and 16 of 16 and the following pages of Attachment 13.1, "Fire Fighting Pre-Plans," 10/10/89:

UNIT 4' PREPLAN TITLE PAGES 12 KV Swgr. and Cable Spreading Rooms 1-2 &3 1 DG's 1-1, 1-2, 1-3 2-2 & 3 1 Turbine Bldg. El. 85'nd Below 3-2 & 3 1&2 Cold Hachine Shop 4-2 & 3 1 4160 Swgr. Cable Spreading Rooms 5-3 & 4 and Iso Phase Bus Area 1 Diesel Generator Exhaust Area 6-2 & 3 1 Turbine Bldg. EI. 7-2 5 3 Swgr. and Elec. Shop Area 8-3 & 4 104'160 1

1 Turbine Bldg. El. 9-2 & 3 1&2 Bldg. Hork Planning Center 119'urbine 10-2 & 3 1 Turbine Bldg. El. 11-2 & 3 1 Polishing Area 140'ondensate 12-2, 3 & 4 1 Package Boiler Area 13-2 & 3 1 Transformers and R.O. Area 14-3 & 4 1&2 480V Vital Swgr. Area El. 15-2 & 3 1&2 Battery Rooms El. 100'ital 16-2 & 3 1&2 Spreading Rooms - El. 17-2 115'able

& 3 1&2 Room 127'ontrol 18-2 & 3 2 12 KV Swgr. and Cable Spreading Room 19-2 5 3 2 DG's 2-1, 2-2 5 Document Storage 20-2 & 4 2 Turbine Bldg. El. 85'nd Below 21-2 & 3 2 Condensate Polishing Area 22-2 & 3 2 East Buttress and Transformer Area 23-2 & 3 2 DG. 2-1 & 2-2 Exhaust & Document Storage 24-2 & 3 2 Turbine Building El. 25-2 & 3 2 Support Center 104'echnical 26-2 5 3 3032S/0077K

ENCLOSURE 1 (Continued)

LOCATION OF PRIVACY/PROPRIETARY INFORHATION 4160 Swgr. Cable Spreading Rooms 27-2 & 3 and Iso Phase Bus Area 2 4160 Swgr. Area 28-2 & 3 2 Traveling Crew Quarters 29-2 & 3 2 Turbine Bldg. El. 30-2 & 3 2 Bldg. El. 119'urbine 31-2 & 3 0 Building 140'ecurity 32-2 & 3 1&2 Intake Structure 33-2 & 3 0 Administration Building 34-6, 7 & 13 0 Warehouse B 35-2 & 3 0 Warehouse A 36-2 & 4 0 Auxiliary Package Boiler 37-2 & 3 0 Cold Machine Shop 38-2, 3 & 4 0 Training Building 39-2, 3 & 4 0 Haintenance Shop Building 40-2, 3 & 4 0 Area 10 Hazardous Waste Building 41-2 & 4 0 Area 10 - Rotor Storage Building 42-2 0 Reservoir Area - W.H.A.T. Facility 43-2 & 4 0 Reservoir Area Chlorination/Clarifier 44-2 & 4 Build.

Transmission Yards 500 KV Switchyard 45-2, 4 & 5 Control Bldg.

Transmission Yards 230 KV Yard Control Bldg. 46-2 & 4 Hancamp Area Hechanic's Shop 47-2 & 4 Hancamp Area - Document Storage Building 4913 48-2 & 3 NPG Warehouse 49-4, 5 & 7 EP 6-2 Sl "Notification of the On-Site Emergency Organization," Revision 13, January 4, 1990, page 2 of 2.

Attachments:

6.1 "Control Room Assistant's Emergency Notification Handbook,"

(3/88) Sheets 7II and 9II.

6.3 "Emergency Organization Call List," (12/89) page 44 of 44.

3032S/0077K

0 I

Qf

'p,$ l Rfgy (4

O 0

O UNITED STATES NUCLEAR REGULATORY COMMISSION e

WASHINGTON, D. C. 20555

+~ ~0 February 15, 1990 4+*+4 50-275/323 Diablo Canyon MEMORANDUM Chief, Document Management Branch, TIDC FOR'ROM:

Director, Division of 'Rules and Records, ADM SUBJECT'he REVIEW OF UTILITY EMERGENCY PLAN DOCUMENTATION Division of Rules and Records has reviewed the attached document and has determined that it may now be made publicly available.

yp~ ~ +gY~M Donnie H. Grimsley, Director Division of Rules and Rec rds Office of Administration

Attachment:

As stated

e