05000275/LER-1982-007, Forwards LER 82-007/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-007/03L-0
ML20054L661
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 06/24/1982
From: Shiffer J
PACIFIC GAS & ELECTRIC CO.
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20054L662 List:
References
NUDOCS 8207080341
Download: ML20054L661 (1)


LER-2082-007, Forwards LER 82-007/03L-0
Event date:
Report date:
2752082007R00 - NRC Website

text

1 r ( l WjlJ';?O PACIFIC OAS AND E LE C T RIC COMyANY 2n r; IP G tM13 77 BE ALE STREET

  • SAN FRANCISCO, C ALIFORNI A 94106 (415) 7814211
  • TWX 910 372 C5 !

l I,% ' ' #-

  • JAMES D SHIFFER DEPARTMENT OF NUCLE AR PLANT OPERAfIONS NUCLE AR POWER GENERATON Mr. R. H. Engelken, Regional Administrator Of fice of Inspection and Enforcement Region V U.S. Nuclear Regulatory Cm mission 1450 Maria lane, Suite 260 Walnut Creek, CA iM596 Re: Docket 50-275, OL-DIR-76 Diablo Canyon Unit No. 1 Licensee Event Report 82-007/03L-0

Dear Mr. Engelken:

Pursuant to Section 6.9.1.13.h of Appendix A of the Technical Specifications to the Diablo Canyon Unit 1 Operating License, the enclosed Licensee Fvent Report is submitted concerning an event that rendered the Plant Vent Iodine Sampler (RE-24) and the Plant Vent Flow Rate Monitor (FR-12) inoperable. The cause of the instruments' inoperability has been determined.

This event has in no way affected public health and safety.

Very truly yours, JDS:vk Enclosure cc (w/ encl.): Mr. Frank Miraglia, Chief Licensing Branch No. 3 Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Camission Washington, DC 20555 Director, Office of Management Infonnation and Program Control U.S. Nuclear Regulatory Camission Wnshington, DC 20555 Service List O 05hochh5 PDR hh