DCL-90-110, Forwards Public Version of Rev 9 to Corporate Emergency Response Plan 4.3, Radiological Analyses & Protection

From kanterella
(Redirected from ML16341F690)
Jump to navigation Jump to search
Forwards Public Version of Rev 9 to Corporate Emergency Response Plan 4.3, Radiological Analyses & Protection
ML16341F690
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/26/1990
From: Womack L
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML16341F691 List:
References
DCL-90-110, NUDOCS 9005100037
Download: ML16341F690 (6)


Text

ACCELERATED DISTRIBUTION DEMONSTF&TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9005100037 DOC.DATE: 90/04/26 NOTARIZED NO FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga AUTH.NAME AUTHOR AFFILIATION WOMACK,L.F.

Pacific Gas

& Electric Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards public version of Rev 9 to CERP 4.3, "Radiological Analysis

& Protection."

DISTRIBUTION CODE:

DFOID COPIES RECEIVED:LTR I ENCL I SIZE:

TITLE: Direct Flow Distribution:

50 Docket.

(PDR Avail)

NOTES:

DOCKET 4

05000275 05000323 RECIPIENT ID CODE/NAME INTERNAL: NUDOCS-ABSTRACT EXTERNAL'PDR NSIC COPIES LTTR ENCL 1

1 1

1 1

1 RECIPIENT ID CODE/NAME REG FILE NRC PDR COPIES LTTR ENCL 1

1 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACTTHE.DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED:

LTTR 5

ENCL 5

1 lj

~P~

p

Pacific Gas and Electric Company 77 Beate Street San Francisco. CA 94106 415I972 4758 t

Lawrence F. Womack Manager Nuclear Operations Support April 26, 1990 PGhE Letter No. DCL-90-110 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Re:

Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1

and 2

Corporate Emergency

Response

Plan Implementing Procedure Update Gentlemen:

In accordance with Section V, "Implementing Procedures,"

of 10 CFR 50, Appendix E,

PGhE is submitting one copy of this update to the detailed Implementing Procedures (Enclosure

2) for the Corporate Emergency

Response

Plan.

Concurrently, two copies of this update are being submitted to the NRC, Region V office and one copy is being submitted to the NRC Resident Inspector.

This update contains privacy/proprietary i nformation that is identified in Enclosure 1

and bracketed in accordance with NRC Generic Letter 81-27.

Kindly acknowledge receipt of this material on the enclosed copy of this letter and return it in the enclosed addressed envelope.

Sincerely, L. F.

Womack Enclosures cc w/encs:

3.

B. Martin/G. P.

Yuhas (2) w/acknowledgement copy P.

P. Narbut cc w/encs 1

and 2 List Only:

M. M. Mendonca H.

Rood B.

H. Vogler CPUC Diablo Distribution Enclosure 2 is available for review at:

NRA ACTS Files 3164S/0082K/B 3 8/183 9005i00037 900426 PDR AGOCK 05000275 PDC I

(

i II V

~a

~

~

~i il

ilc~ y+

+

~ Iy jP. j

+~

~O

+a*++

UNITED STATES LEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 May 7, 1990 50-275/323 Diablo Canyon MEMORANDUM FOR:

Chief, Document Control-Branch, IRM FROM:

SUBJECT:

The Division the attached available.

Director, Division of Freedom of Information and Publications Services, ADM REVIEW OF UTILITY EMERGENCY PLAN DOCUMENTATION of Freedom of Information and Publications Services has reviewed document and has determined that it may now be made publicly

/7 ~8~~8.

Donnie H. Grimsley, Director Division of Freedom of Information and Publications Services Office of Administration

e~~